Firestopping and Fireproofing in Head of Wall Assemblies

Slides:



Advertisements
Similar presentations
Saving Lives and Property Through Fire and Smoke Containment ©2004 IFC Fire Protection of Construction Joints.
Advertisements

GRP Service Riser Systems PULTRUDED STRUCTURAL PROFILE SUPPORTS WITH GRP MOULDED ANTI SLIP GRATING FOR OPEN RISERS AND CUT OUTS FOR SERVICES.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Heavy Concrete Construction Formwork
NERI TORCH TRAINING PART VII PRACTICAL EXAM PREPARATION.
HEAD-OF-WALLS. Presenter-Brice Miller 23 years as Building Official, Inspector and Plans Examiner 23 years as Building Official, Inspector and Plans Examiner.
ICRA Panel System Installation Instructions
Class Day Seventeen.
Ex. 1 - A healthy person has an oral temperature of 98.6°F. What would be this reading on the Celsius scale?
Harwood Grant #46J6-HT13Southwest Safety Training Alliance Inc1 Module 2 Fall Hazards Did you know? Falls from elevation account for one third of all deaths.
Your School Energy Saving Plan Put in photos of people who did the audit on this slide Put your school logo here Date.
Design of steel structures under the aspect of fire protection measures TU BRAUNSCHWEIG iBMB Dr.-Ing. E. Richter Institute for Building Materials, Concrete.
OK, now my favorite subject: RPCs in a shipping container
Shear Walls Section 3.
Candela Display Systems 3x2 Interactive Video Wall System.
Rulers or Tape Measures
Wall Framing Grimsby Secondary School Technology Dept.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
Wood Construction CTC-375.
Describing the motion of an object is occasionally hard to do with words. Sometimes graphs help make the motion easier to picture, and therefore understand.
Demonstration of Vulcan Software. Content Demonstration Introduction to Vulcan GUI Project Description Creation of Model Analysis.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Shield.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Modeling the Game of Brain Cube Leslie Muzulu, Kristal Jameson, and Kathy Radloff; St. Catherine University Game Description Brain Cube is a puzzle game.
Rick Statham HAS Dip, CMIOSH (Joint Managing Director) Safety & Access Ltd SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance.
13 Search and Rescue.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
TUTORIAL 1 7/3/2016.
Date of download: 6/23/2016 Copyright © ASME. All rights reserved. From: Experimental and Numerical Characterization of an Electrically Propelled Vehicles.
1 Target Station Design Dan Wilcox February 2012.
10 Reasons to Brand Your PCB: Why Branding is Important in Projects.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Pistons and piston rings
Fire Blocking Requirements For All Buildings;
Structural Slab Analysis
SG4:10 Preventing Falls in Scaffolding Revised Industry Guidance
Physics 11 Mr. Jean May 14th, 2012.
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
M. Z. Bezas, Th. N. Nikolaidis, C. C. Baniotopoulos
Example 6.04 SOLUTION: Determine the shear force per unit length along each edge of the upper plank. For the upper plank, Based on the spacing between.
Instructions for Choice from Envelope
Objectives Upon completion of this module you should be able to:
Section 7-3 Cell Boundaries (pages )
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
Deflections using energy methods
Hall C Down Stream Beam Pipe And Dump Interface Design
These are only the basic instructions to build the stand.
An Easy to Use Menu Type Approach for Determining the Fire Resistance of Wood Stud Area Separation Walls GORDON D. FELLOWS ____________________________________________.
המחשב הנייד ערך והכין: אלי סומר.
Performance Based Design of a Steel Frame Hotel
FOOD PREP & SERVICE COUNTERS
Arch205 building construction floor & Roof systems
Example 6.04 SOLUTION: Determine the shear force per unit length along each edge of the upper plank. For the upper plank, Based on the spacing between.
Video Clip.
Thermal Bypass Checklist Round-Table
Engineering Mechanics: Statics
Practical Metalworking
How to construct a Table and Graph
FOOD PREP & SERVICE COUNTERS
CE808: Structural Fire Engineering – Research Project
Can we apply our “3 Basic Steps” process to power a non-Aristo loco?
For Commissioners in the Mount Olympus District
Neutron guide Shielding Concept
Diode Laser Experiment
Fix your Fireplace SYM-B Series.
Presentation transcript:

Firestopping and Fireproofing in Head of Wall Assemblies Head of Wall - Firestopping Firestopping and Fireproofing in Head of Wall Assemblies Fireproofing material is sometimes removed to facilitate installation of steel tracks for gypsum walls. The removed fireproofing material results in a thermal short or unprotected area that could result in a fireproofing failure. Here we see photos of a situation that you all may have seen. Fireproofing material is scrapped off a beam to accommodate attachment of a steel track of a gypsum wall assembly.

Firestopping and Fireproofing in Head of Wall Assemblies Head of Wall - Firestopping Firestopping and Fireproofing in Head of Wall Assemblies Third party testing has shown the potential down falls of removing fireproofing materials to facilitate gypsum wall assemblies Thermocouple indicated an unprotected beam would reach the limiting temperature for the structural member. Gypsum boards on one side of beam do not provide adequate fire protection for the beam. Through third party testing we have discovered that removing the fireproofing is a problem. When a thermocouple is placed on the beam we learned that the temperature on the beam exceeds the limiting temperature of the beam for the fireproofing performance. The layers of gypsum board on the side of the wall do not provide adequate fire protection for the beam.

Firestopping and Fireproofing in Head of Wall Assemblies Head of Wall - Firestopping Firestopping and Fireproofing in Head of Wall Assemblies A couple potential solutions are to use Z-Clips prior to fireproofing the beam or filling the track with the same thickness of fireproofing that is applied to the beam. Therefore, the fireproofing material must not be removed from beam to attach the track. Some solutions to the issue are shown here. On the left Z Clips are attached to the beam prior to fireproofing the beam and the track is attached to the bottom of the Z Clips after the fireproofing is installed. On the right the track is attached directly to the beam and fireproofing material is installed into the track to the same thickness as the rest of the beam.