Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Fairfax County Transportation Committee November 29, 2011 Fairfax County Transportation Committee November 29, 2011 I 95 HOT Lanes Update.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Regional Priority Bus Transit Conference June 24, 2009.
“Connecting People and Places” REGIONAL MOBILITY PLAN CRTPA Board September 20, 2010.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Livingston County Transportation Connectivity Plan Final Report December 2013.
La Plaza Vieja Neighborhood Plan Transportation Commission Meeting Wednesday, September 30, 2015 Sara Dechter, AICP City of Flagstaff Comprehensive Planning.
SYSTEM MANAGEMENT PERFORMANCE MEASURES, RANKING AND PRIORITIZATION CORRIDOR MANAGEMENT PLANS INCORPORATION INTO STIP & TIP STRATEGY IMPLEMENTATION MONITOR.
Transportation Round Table Loudoun County: Preparing for Silver Line Metrorail Phase 2 Dulles Area Transportation Association June 15, 2016.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Chelan County Transportation Element Update
Urban Street Design Standards Overview of Project and Details
Update of Transportation Priorities Plan
32 Transportation Midway City 2016 General Plan
The Central Avenue Connector Trail
Four Winds Condominium Association August 2, 2017
Downtown Valdosta Truck Traffic Mitigation Study
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Willow Meadows Civic Club Meeting September 13, 2011
NGTA Halton Planning and Public Works Committee
Major Projects in Development
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
Draft Transportation Element September 6, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Clifton Corridor Transit Initiative
Transportation Alternatives (TA) Set-aside
Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Department.
Clifton Corridor Transit Initiative
Board Transportation Committee October 13, 2015
Construction Management & Inspection
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Dana Heiberg, Senior Planner February 5, 2018
2013 RTS Campus Improvement Project
Chris Metka 2017 Statewide Conference on Heritage ???
Six Year Improvement Program Public Hearings
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Stockton City Council December 6, 2007 Land Use Diagram Changes
I-85 Corridor Light Rail Transit Feasibility Study
Moving Forward with Positive Change
Transportation Management Plan Modernization Project
Draft FY Six Year Program
I Street Bridge Replacement Project
New Hanover Comprehensive Plan
Presentation transcript:

Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October 13, 2015 Tom Biesiadny and Bob Kuhns Fairfax County Department of Transportation Department of Transportation 1

County Issues that have been addressed: Reductions in the project footprint resulting in less right-of-way impacts and fewer possible relocations, Redesign of interchanges and access points resulting in reduced heights of elevated ramps, Incorporation of regional trail, Additional transit services, and Coordination on Inside and Outside Beltway projects relative to the future conversion from HOV-2 to HOV-3 requirements. Department of Transportation 2

Continuing County Issues: Identify future phasing and funding strategy of Recommended Design Concept (Preferred Alternative). The Recommended Design Concept (Preferred Alternative) allows for a wider median in Fairfax County. However, Phase 1 does not include the wider median in Centreville from west of Route 28, through the Route 29 interchange and to the planned future rail station location, a distance of approximately 5,000 feet. Department of Transportation 3

Continuing County Issues: The Recommended Design Concept (Preferred Alternative) includes the major regional trail paralleling I-66 as indicated in the County’s Comprehensive Plan. Two additional related issues: Identification and supporting documentation of a regional trail alongside of I-66 was very preliminary in the draft Tier 2 documents and additional detail has yet to be published for review. Construction costs of the entire regional trail within the I-66 right-of-way and parallel connections along adjacent right-of-ways and roadway infrastructure should also be included in the total Project costs. The portions of the regional trail outside of the I-66 right-of-way have been noted as ‘Potential Shared Use Path by Others’ or ‘Future by Others’. Department of Transportation 4

Continuing County Issues: There are a number of outstanding environmental issues that have yet to be presented in the final environment documents and necessitate continuing coordination leading up to the Design Public Hearings. The following still need to be addressed: stormwater management strategies, heights of noise barriers, tree cover, impacts to Resource Protection Areas, Environmental Quality Corridors, and Watershed Management Plans, impacts to Parks, and impacts to Historic Properties and wildlife habitat.

Continuing County Issues: Implementation Ensuring that sound walls are provided in residential areas, on ramps elevated above sound walls adjoining residential neighborhoods and replaced rapidly after existing walls are removed, Minimizing park impacts, Developing an aggressive maintenance of traffic plan for roadway and existing Metrorail service, Minimizing night construction in areas adjacent to residential neighborhoods and using every effort to mitigate construction noise, including quieter equipment, Maintaining proper erosion, siltation and stormwater management equipment and facilities during construction,

Continuing County Issues: Implementation (continued) Developing an effective landscaping and tree replacement plan, Minimizing disruption during construction and considering traffic calming devices as necessary, Minimizing construction that impacts bus services especially at peak times, Maintaining safe pedestrian and vehicular access with particular attend around Metrorail stations and schools, and. Providing regular communications with the community.

Continuing Efforts: Transportation Management Plan (TMP), working with VDOT and other stakeholders on: Transit and Travel Demand Management Traffic Operations and Local Network Operations Communications and Outreach

Timeline October 20, 2015 Board Action on Endorsement of Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway October 19-21, 2015 Public Information Meetings October 27, 2015 CTB Decision on Preferred Alternative  Late 2015 Final Environmental Document 2016/2017 Design Public Hearing 2017 Construction Start 2021 Open to Traffic Department of Transportation 9

Next Steps Incorporate comments received from Board Transportation Committee into the October 20, 2015 Action Item and Letter of Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Department of Transportation 10

Questions? Department of Transportation 11