LANSCE Status and Progress Update

Slides:



Advertisements
Similar presentations
HISPC-Illinois II The Public-Private Partnership Moves Forward on Privacy and Security.
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Recommendations Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Recommendations Ward Plummer Washington, D. C. December 11, 2000.
Los Alamos National Laboratory PWL 1-8/2/01 LANSCE Status and Progress Update Presentation to Basic Energy Sciences Advisory Committee August 2, 2001 Paul.
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Overview of the ARCS Project Plan: The View at One Year Doug Abernathy ARCS Instrument Scientist ARCS IDT Meeting Lujan Center, LANL September 30, 2002.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Academic Assessment Task Force Report August 15, 2013 Lori Escallier, Co-Chair Keith Sheppard, Co-Chair Chuck Taber, Co-Chair.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Washington, D. C. December 11, 2000 IntroductionWard Plummer, Chair Evaluation Procedure &Jack E.
Facility Evaluation Andrew Taylor BESAC Subpanel Review of IPNS and LANSCE/Lujan Center BESAC Sub-Panel Review of IPNS and LANSCE/LUJAN Facility Evaluation.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
1 SEAB Task Force on EM Technology Development Gerald Boyd Task Force Member September 29, 2015.
LANSCE Update for BESAC February 26, 2002 Paul W. Lisowski LANSCE Division Leader Los Alamos National Laboratory.
LANSCE Update for BESAC July 23, 2002 Paul W. Lisowski LANSCE Division Leader Los Alamos National Laboratory.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Recommendations of the Programme Advisory Committee for Condensed Matter Physics 20th meeting, April 2004 Wojciech Nawrocik JINR Scientific Council,
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
The Materials Test Station: An Accelerator Driven Neutron Source for Fusion Materials Testing Eric Pitcher Presented at: Sixth US-PRC Magnetic Fusion Collaboration.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Mount Vernon City School District Comprehensive Team Planning for Improved Student Achievement Presentation by Maureen Gonzalez Deputy Superintendent.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
OSTP and Neutron Science OSTP is authorized to (under PL , National Science and Technology Policy, Organization, and Priorities Act of 1976): Advise.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
PRIORITISATION FOR SCHOOL SPORT SUPPORT
Itzhak Tserruya Weizmann Institute of Science
IT Governance and Management Structure
Operations StayTreat 2016: Reliability Team Plans
Office of Transportation Planning Modal Planning Update
Jefferson Lab Overview
Making Difficult Decisions in a Transparent Way –
Jefferson Lab Reliability Task Force and Initiatives
Very Cold Moderator Development at LENS
Industrial Assessment Center Database
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Experimental Facilities Planning
DOE Nuclear Safety Research and Development Program
Getting Started with Your Malnutrition Quality Improvement Project
IT Governance Planning Overview
Metro-North Railroad Strategic Plan
Contractor Assurance Systems (CAS) Summit August 23, 2016
GMD Data Request NERC Rules of Procedure Section 1600
APPA – Term 3 Breakfast Session
Implementation Challenges
Reliability Standards Development Plan
Accelerator Safety Workshop SLAC
Economic Development Department Annual Financial Statements 2011/12
NERC Reliability Standards Development Plan
Finance & Planning Committee of the San Francisco Health Commission
SHARE Special Project Cash Remediation Phase II Planning and Implementation Certification July 22, 2015 Requesting Agency: Ron Spilman State Controller.
PUBLIC SCHOOL CHOICE RENEWAL PROCESS
NERC Reliability Standards Development Plan
Ian Evans SSRL Safety Office
Define Your IT Strategy
SOLID Collaboration Meeting
Joint PRESENTATION: IPID AND CSPS
Preliminary Project Execution Plan
Test Beamline System Requirements and Charge to PDR Committee
SNS-PPU upgrades the existing accelerator structure
Sustainable Agricultural Lands Conservation Program
Presentation transcript:

LANSCE Status and Progress Update Presentation to Basic Energy Sciences Advisory Committee August 2, 2001 Paul W. Lisowski Los Alamos National Laboratory LANSCE Division Director

Outline Realizing the full potential of LANSCE Progress to Date 2001 Run Cycle Target Moderator Summary

LANSCE is a Unique Multidisciplinary Science Facility 800 MeV Proton Linac Isotope Production Facility (Under Construction) Weapons Neutron Research Manual Lujan Jr. Neutron Scattering Center Proton Radiography

LANL Goal: Deliver Neutrons and Protons Safely and Reliably for All LANSCE Users Appoint new LANSCE management team Engage other scientific user facilities to benchmark and improve LANSCE performance Develop and implement effective governance model involving NNSA, SC, NE, LANL and user communities Ensure appropriate support and oversight, informed by independent review of bottom-up cost estimate Pause BES development of new Lujan instruments to focus on operation of the user program Increase LDRD investment in Lujan science program Maintain strong communication with LANSCE User Group (LUG)

LANL Plan to Realize the Full Potential of LANSCE (1) Management team in place Benchmarking of scientific user facilities is underway Visits to NIST and ANL completed, planning underway for fall trips Governance model developed and being implemented Incorporates the ideas and expertise of the LANSCE User Group and many at DOE, NNSA and other facilities Held initial meeting in April, 2001 Maureen McCarthy NNSA Chair, Pat Dehmer DOE-SC, Dave Crandall NNSA-DP, Owen Lowe DOE-NE and others attended MOA ready for signature Next meeting planned for September, 2001 LANSCE User Facility Cost Estimate review (K. Berkner, Chair) Underway at Los Alamos

LANL Plan to Realize the Full Potential of LANSCE (2) Pause in BES Spectrometer Development Funding reprogrammed LANSCE science planning Neutron scattering plan based on user input completed by Alan Hurd and others Will be incorporated into overall LANSCE Strategic Plan with a first draft in September A LANSCE planning workshop involving the broader user community is planned for the next LUG meeting, August 12 -14, 2001 Strategic Plan will be integrated into NNSA/DP 5-year planning process Additional LDRD investments in Lujan science secured for FY2001

DOE has Clarified its Governance of LANSCE “Assign … Defense Programs as the Organizational entity with corporate responsibility and accountability for strategic integration of all three program offices using LANSCE. This approach applies both to the short-term objective of facilitating IPF construction and the long-term goal of reliable accelerator operations.” from Memorandum from the Deputy Secretary of Energy to General Gordon 12/21/2000 Single Point Accountability Single Line of Authority Participation of all stakeholders Authority and Responsibility chain includes accountability for those controlling the resources SC NNSA/DP NE NNSA/DP LANSCE Program Manager LANL LANSCE Authority/Responsibility Funding Funding Coordination

Highest Priority: Establish a Long-Term Sustainable Program Serving All Users Safely, Reliably & Predictably Completed outage 20 days ahead of schedule and started user program on schedule: July 1, 2001 Proposals arrived March 12, 2001 for PAC review Proposals evaluated and instrument time scheduled User Facility Production started July 1, 2001 User Program will run through December 23, 2001- a total of 2544 hours for Lujan Center Run safely, reliably and predictably for all users Implement the governance, management, and science plans to realize the full potential of LANSCE and the Lujan Center

All Major Accelerator Outage Tasks Completed on Schedule Interim Safety Assessment Document (ISAD) MPF-963 Cooling Tower tie-in Nuclear Facility Maintenance IPF Shield Wall Construction IPF Transition Region Modifications Accelerator Maintenance Facility Maintenance Accelerator Start-up LANSCE Web Page Outage Display

Lujan Center Received 152 Proposals for the 2001 Run Cycle Number of Proposals Received=152 Defense Non-Defense FDS 0 10 HIPD 4 34 LQD 6 18 NPD 10 27 SCD 0 6 SPEAR 5 28 FP11A 0 3 FP14 1 1 FP5 2 4 Average Oversubscription rate is 2:1 106 Days Available In User Program * Not supported in user program for FY01; will run if support becomes available ** Nuclear physics beam lines located in Lujan Center, FP11A shared with neutron scattering program

LANSCE Operating Schedule for CY2001 LANSCE has Implemented a Standard 28-Day Operating Cycle with Contingency LANSCE Operating Schedule for CY2001 May June July August September October November December Turn-on Contingency For Turn-on 1L Maintenance Lujan/ WNR User Program Prad, NRS, …. Reserve or Contingency 2002 Outage Incorporates formal change control and contingency allocation process

We have Identified Funding, Developed a Detailed Project Schedule, and Plan to Install a Switchyard Kicker in 2003 Five-fold increase in beam available to Proton Radiography program ~20% more beam time scheduled for Lujan Center and WNR Makes an Ultra-Cold Neutron program possible Make changeovers between Line X and Line D operations more efficient, increasing beam availability Stable accelerator operation at fixed beam intensity yields more reliable beam delivery for all programs Kicker 1 Kicker 2 C-Magnet 1 C-Magnet 2 Beam Stop Line X Line D

We are Greatly Improving our Scattering Instrument Suite with New Construction and Upgrades HIPPO: Received first beam on sample, July 7, 2001 SMARTS: Turntable, slits, and controls readied, July 2001 First beam expected August 2001 PROTEIN: First beam on sample December 2000 Alignment improvement studies underway New BNL detector received July 27, 2001 NPD Upgrade: Design for new detector banks for pair-density functions underway with University of Pennsylvania PHAROS: New wide-angle detector bank installed New data acquisition electronics installed Chopper reworked and balanced ASTERIX: First beam December 2000 First data June 2001 IN500: Thimble installation April 2000 Ballistic guide design completed and procurement order placed

Beam Delivery to the User Program has been Reliable thus far, but Current is Limited by the Target Moderator System 93.2% 75 mA 56 mA 7/1 7/22

We have Funding and are Developing a Plan and Schedule to Replace the Lujan Target Moderator if Necessary Target Moderator Reflector system is experiencing overheating of the lower lead reflector Potential problem with lead reflector cooling Thermal cycling may have separated cooling coils from lead Analysis to determine maximum current without melting lead underway The current Target will last through this run cycle Operating conservatively until we understand the problem ~60 mA limit at present gives stable heat load Attempting to develop a work-around to allow higher current Funding and parts to assemble the spare are in hand; assembly planning has begun Develop an engineering solution to the lead heating problem Redesign and fabricate lower reflector Develop a plan for possible installation during the next outage Will install during the next outage if no solution is found

Some of the Exciting Experiments that are Planned and Underway at the Lujan Center HIPD: In-Situ Synthesis of Bismuth Transition Metal Perovskites, Structure and Magnetic Ordering SPEAR: Molecular Density and Orientation in Confined Polymer Layers Under Static and Dynamic (flow) Conditions LQD: Chain Statistics of Polystyrene Dissolved in Lower Molecular Weight Polystyrene NPD: Local Structure of Superconducting Cuprates with Stripes FP5: Solid State Reaction Studies FDS: Identification of CHx Intermediates Formed Over Surface During Methane Decomposition Over Supported Catalysts SCD: In-situ Neutron Single-crystal Diffraction Study on Ice II, III, V, VI and IX at High Pressure Tony Cheetham, UCSB Tonya Kuhl, UCSD Anne Mayes, MIT Takeshi Egami, UPenn Ersan Ustundag, CalTech Wayne Goodman, Texas A&M Dave Mao, Carnegie Institute

Summary DOE, NNSA, the LANL Director, and LANL Senior Management have made a commitment for success at LANSCE We are responding to the BESAC recommendations for governance LANSCE Division completed the outage and started up 20 days earlier than scheduled User program started as promised on July 1, 2001 Operating with high reliability at less than full power Funding for kicker magnet in place and project underway Funding to build replacement target for Lujan Center in place To be installed at next outage We are succeeding at the activities needed to operate the LANSCE user facilities safely and reliably