LS1@LHC BLM planning 03/03/2014.

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
ELENA installation progress F. Butin / ELENA collaboration.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Results of the 2007 BLM hardware tests in LSS5
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
BE-BI Activities and Status: LHC and Injectors
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
Status of LHC installation & New Installation Schedule
Installation of an Instrument on a CERN machine
K. Foraz on behalf of OSS members
Giorgio on behalf of ELQA team
Injectors BLM system: PS Ring installation at EYETS
LS1 Committee January 24th, 2014
Long Shutdown for the LHC: Vacuum Beam Pipes
Injection region BLMs – ECR
MPE main activities planned for LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Powering from short circuit tests up to nominal
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
LHC BLM system: system overview
Disabling Rules.
K. Foraz on behalf of OSS members
Monday 11/07: Recovery Plenty of accesses.
Alice solenoid – orbit distortion
BLM planning 24/02/2014.
LS1 status 28/04/2014.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
LS1 status 24/03/2014.
07/07/2014 * status, all * AccTest framework
Undulator Vacuum System
Technical Stop #4 29th August - 2nd September 2011
Wednesday 03/11 – The Plan Finish electron-cloud program:
LS1 status 17/03/2014.
LHC installation status
Re-Installation (days)
Undulator Vacuum System
LS1 status 07/04/2014.
BLM planning 03/02/2014.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
Friday 1st October : Van der Meer scans
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LS1@LHC BLM planning 03/03/2014

Surface racks P1 -/+, P2 -/+, P5 -/+: to change the configuration:   P1 -/+, P2 -/+, P5 -/+: to change the configuration: Next week P1,P2,P5 – configuration will be correct P6 + , P7 +, P8 +, P3 + : OK Pt4 : March (Bernd’s request) Rack configuration: R L I C - ground metallic bar: >5 fixation – OK (P3)

Tunnel racks and HV divider HV divider installation: Installed in all “standard” locations in all Points, except L6 In “special cases” – not installed, but long cables was ordered ( Remo) L5: restoration of racks after He spill test Racks – CFC cards : ready for installation ( Ion or Russian team)

From version 3.0 to 3.1 Under discussion Schematic view of version 3.1, now includes DFBA repairs at P6 and P8 CSCM in sectors 67 and 81 a margin of 2 weeks after flushing for N.C. solving The sector test from P2 to P3 Under discussion 25 Feb. 2014 K. Foraz - CMS week

BLM re-installation and RSM New planning for Installation and Rad Source Measurements (pdf files from 27 February) Current status of DS+ARC installation: Sector 6-7 - done Sector 5-6 - done Sector 7-8 – in work last, this and next weeks, but it’ll be no access during 3 days on the next week List what we need to be work before RSM: Installation, surface rack, tunnel rack, DB, … Request to move the source on surface? LSS installation New request: 2 IC shifted + new 4 ICs new installation Request for ion losses control – new ICs installation in Q10 -Q12 location in P1,P2,P5 Alice – new 3 ICs installation

BLM re-installation LHC Beam Loss installation 03/03/2014 Cell R 1 L 2   L 2 R 2 L 3 R 3 L 4 R 4 L 5 R 5 L 6 R 6 L 7 R 7 L 8 R 8 L 1 IC S 1 5 6 2 8 3 4 10 15 13 11 12 31 24 18 7 14 20 27 21 9 16 19 4+2 17 22 23 25 26 28 29 30 32 33 34 Dump IC inst 231 234 232 242 248 178 184 223 225 217 260 264 218 3635 SEM inst 49 302 IC to inst SEM to in finished Sem, IC monitors not installed LIC HV divider Card_CFC

General Information ( old?) Beam Vacuum Pumping in the LSS and Arcs before the start of the cool-down All activities on the stand alone need to be completed before Start week 13 for the sector 67 6th February 2014 LHC machine Schedule for LS1 EDMS 1350481

GLOBAL OVERVIEW: P test & cool down(old?) LHC machine Schedule for LS1 EDMS 1350481 6th February 2014

Divers Databases: changes on this week sector 5-6, 6-7, R7 Slot Labels ( after changes of expert names) Rad Source test ( 2 sources ) ECR for HV divider is released Label for new “short” cable (BJBDV - BJBAP) Amendment for 1 month* 4 persons prolongation – signed at CERN ECR for LICs LIC’s after GIF for installation – middle of March (?)