Participatory Road Program neighborhood meeting Donahoo 174th Street

Slides:



Advertisements
Similar presentations
Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P.
Advertisements

Project Certification & Encroachments The SR 305 Experience Project Certification & Encroachments The SR 305 Experience.
Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Basics of County Offices Highway Department County Officials Academy.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Presented By Kyle L. Nash Director of Public Works Newberry County.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Whitestown: 20 Year Strategic Plan for Municipal Services “The best possible service at the lowest possible cost.”
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
June 2012 Washington State Transportation Improvement Board Small City Funding Programs.
Roadway Median Tree Program Public Works Department July 13, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
WEST VIRGINIA INDUSTRIAL ACCESS ROAD PROGRAM West Virginia Economic Development Council January 27, 2016.
Copyright, 1996 © Dale Carnegie & Associates, Inc. Larimer County Public Improvement Districts PID Larimer County Engineering Department Fort Collins,
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
What is Tax Increment Financing?
Town Road Survey - What You Should Know 1_24_17
Town Road Improvement Project Plan
Limited Service Agreements
City of Charlottesville
Community Improvement Districts County Counselors Association of Kansas Annual Meeting November 15, 2010 Janet S. Garms
2016 Mill and Overlay Project
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Town Road Improvement Project Communication Plan
Ontario’s Drainage Legislation
Jefferson County SA Red Rocks Site Approval
How Do Foreclosure Auctions Work
General Road Construction Information
Project Status & Right-of-Way Acquisition
The Alabama Transportation Rehabilitation and Improvement Program
Location Map.
F-1 OPT Workshop.
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Presented by: Deborah Early Icenogle Seaver Pogue, P.C.
Utilities Department Wedgefield Water November 28, 2017.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Financing Land Development Projects
Springbrook Estates Sewer Improvement Area Informational Meeting
Implementing and Understanding Tax Increment Financing (TIF) Districts Prepared for the Village of Alsip May, 2017.
Right of Way – Eligible for State Aid Reimbursement
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
OPT Optional Practical Training Lindsey W. Hill
Competency: Create site plan drawings
Walker Street Reconstruction Project 25% Design Public Hearing
City Hall Departments 2020 Budget.
Initial Licensure Process, Survey Types & Licensure Action
Larimer County: engineering
Presentation transcript:

Participatory Road Program neighborhood meeting Donahoo 174th Street August 6, 2018

PRP projects 6-step Process

Step 1 – petition of owner’s intent Property owners submit a petition indicating their desire to be included in the program. Signature indicates ownership intent and understanding include easement donation and fence relocation. ***PROGRAM HAS BEEN REPEALED BY RESOLUTION 2018-11. APPLICATIONS ARE NO LONGER ACCEPTED***

STEP 2 – PETITION VALIDATION Complete incomplete All ownership interests have original signatures. Project request is on a local road. Project request is minimum length. Project request connects to existing hard pave. Public Works presents petition to BOCC Staff provides a map to petition contact to assist with ownership signatures. Petition contact is required to obtain remaining signatures. Petitioner resubmits to Public Works. Staff validates petition and repeats until COMPLETE

Step 3 – petition acceptance step 4 – easement donations Public Works staff presents petition to BOCC at a public hearing and requests the formal acceptance of the petition and funds required to begin acquiring easement donations. BOCC accepts project petition and allows Public Works to acquire easement donations. Public Works hires a surveyor to prepare legal documents and mails them to owners. Public Works meets with homeowners as requested for unofficial flagging and questions Staff works with homeowners for signatures and any issues that may come up on their property. Public Works Staff presents project to BOCC IF ALL EASEMENTS ARE NOT ACQUIRED THE PROJECT IS REMOVED FROM THE POTENTIAL PRP LIST

EASEMENT DOCUMENTS + Must be signed by all property owners or trustees per Trust documents. + Must be notarized by a Kansas Notary. The County including Public Works offers free Notary Services. + Can be mailed back or hand delivered to the Department of Public Works. + Public Works will not record easements until project is accepted by BOCC

STEP 5 – ENGINEERING AND CONSTRUCTION DRAWINGS Public Works presents completed easements to BOCC and requests permission to record and funds for design and construction. Previous PRP projects were designed before easements were collected but were not receiving full participation. 178th Street PRP was the last project done in this manner. Design (typically 6-9 months) Topographic survey, first people you may see entering your property. Please do not remove flags or posts that they install. Engineers take the topographic survey and evaluate drainage and safety issues on the project and create design documents contractors will use to construct the project. Utility Relocation (typically 2-9 months) Utilities will relocate within the easements based upon design criteria.

STEP 6 – ROAD CONSTRUCTION Advertisement of the roadway project are posted. Bids are opened approximately 30 days later. Public Works presents bids to BOCC and recommends an award. BOCC awards project to a bidder. RESIDENTS REQUIRED TO MOVE FENCES AND ASSETS THEY WISH TO KEEP BEHIND THE SURVEY STAKES. Construction begins. Constructions ends approximately 6-8 months later.

Prp funding Sources and expectations

Year Petition Accepted Prp project list + Completed a minimum of Step 1 of the process. + Easements are acquired in order of BOCC acceptance. + PRP was dormant for many years. + Public Works staff continues to keep these projects in front of the BOCC Year Petition Accepted Road Status Length (miles) 2011 178th Street Utility relocation 2019 construction 1.0 2015 187th Street Easement preparation 0.5 2017 174th Street Easement acquisition McPherson/119th St/Kelly Rd On hold 2.0 2018 Donahoo Road 2.5 219th Street 2.75

Prp project costs Project Improvements Project Cost One mile existing gravel Funding sources Project Improvements Improved drainage and ditching Improved safety and intersections 22-24’ two-lane width plus shoulders Project Cost $350,000 per mile to improve roadway to hard surface of chip and seal or asphalt 2019 budget is approved at $200,000 2018 budget was approved at $179,700 2017 budget was approved at $0 2016 and older is unknown PRP was in suspension for many years

Prp owner costs Donation of 10’ easement Relocation of assets Potential loss of trees and landscaping within the 10’ donation

When prp fails What happens when easements are not acquired?

County Road Programs CIP is the capital improvement projects. These are high volume, arterial, and collector roads that are key corridors in the County. ME is the maintenance extension projects. These are segments of particular interest to the County due to their unusually high maintenance costs for the roadway type. These can be directly related to municipal destinations such as schools, government buildings, and facilities. Dust Abatement is part of the dust control policy and is a public-private partnership between land owners and the County. Dust Control Policy was updated to include financing options and allows all roads, regardless of their classification to be eligible for improvement. Applications for dust abatement installation are available every year in October for the following summer installation.

Resolution 2018-11 Dust Control Policy Dust Patch (Chemical Application) Dust Abatement (Hard Pave) Scottwood Industries Owner to contact directly 1.800.844.2022 Costs are paid by owners directly to Scottwood Industries. County provides grading services free to the owners and Scottwood Industries. Owner(s) responsible for installation at $13.50/LF (per lineal foot). County to pay for the remaining balance of roadway costs. Maintenance Connected to hard pave, none Disconnected segments, owners to maintain every 2-4 years. Current cost is $3.00/LF, evaluated periodically. 5-year financing option through Clerk Maintenance to be included on disconnected segments

Department of public works Thank you Department of public works publicworks@leavenworthcounty.org 913-684-0470