DTF implementation Roles and responsibilities

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Roles & Responsibilities in Construction Management
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Sanitation is Business
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Water Services Trust Fund UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot & household.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
Water Services Trust Fund Training Workshop for Field Monitors Team Hierarchy, Communication within the Field Monitors Team & Communication with the WSTF.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Water Services Trust Fund SafiSan Projects: The Project Task Team
Water Services Trust Fund UBSUP Projects: The Project Task Team
Facilities Design and Construction Requirements. Engineering Review  Design Issues  Procurement Issues  Construction Issues.
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition and main Roles and Responsibilities 1 Project Task Team: Multi-stakeholder,
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Water Services Trust Fund Accounting and Reporting Clarine Bowa and Charles Kang’ethe 1 Accounting and Reporting.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Water Services Trust Fund UBSUP Projects: The Project Task Team Composition, Roles and Responsibilities 1 Project Task Team: Multi-stakeholder; composed.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Water Services Trust Fund (WSTF) UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot &
E4014 Construction Surveying Job Organisation and Control.
General Contractor Davon Woodard February 11, 2014 Career Tech.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
Province of the EASTERN CAPE DEPARTMENT OF PUBLIC WORKS DOH REVITALISATION PROGRAM EASTERN CAPE PROVINCE PRESENTATION TO SELECT COMMITTEE ON APPROPRIATIONS.
KENYA NATIONAL BUREAU OF STATISTICS
Indian Health Service Grants Management Grants 101- Fundamentals.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Finance & Business Models Prepared by the UBSUP Team.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) UBSUP Finance & Business Models The UPC Team 26 th June 2014.
4.2, 4.3 How Schools are Governed. Local Governance is the basic governing unit for education. A board consists of five people, each elected for a four-year.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Integrated permitting and inspections
Water Services Trust Fund Field Monitors Training Workshop
The Design Team Carl James.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Health and Safety Policy
Sanitation is Business
Careers in the Hospitality and Tourism Industry
12. Role of national and international technical and funding partners in the implementation of aDSM Multi-partner training package on active TB drug safety.
DTF CONSTRUCTION MONITORING
Incident Command System (ICS)
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
The Sanitation Team Business Model
Up-scaling Basic Sanitation for the Urban Poor (UBSUP) in Kenya
Safety Management - NOAO-AURA-LSST Base Facility Addition
Service reference ABU DHABI, United arab emirates IND 36 months
Temporary Works Co-ordination
Water Services Trust Fund
Site Management Structure
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
The UBSUP/SafiSan Programme
What is Project Management?
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
ICS Staff One person is responsible for overall ICS and can delegate the responsibilities so that for each procedure or task of the ICS, one person is.
Department Of Energy Review Linac Coherent Light Source Project
Water Services Trust Fund Training Workshop for Field Monitors Role of Field Monitors within the Project Task Team Sheillah Karimi (2009, updated in.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
ROLE OF ARCHITECTS ABHISHEK RAJ. Architect makes a plan, designs and then review the process of building construction. Architect is a person who makes.
Wealth Management Meeting Asset Management Execution
Presentation transcript:

DTF implementation Roles and responsibilities Decentralised Treatment Facility Inspects Funds Constructs Water Services Trust Fund Reports Reports Contracts and supervises Water Services Provider Contractor

Programme Manager and officer WSTF side Programme Manager and officer CRM Technical Advisor Is in charge of the overall UBSUP implementation Approvals and official communication with the WSP Is the communication link between the WSP and the WSTF Continuous consultations with the WSP Support the WSP in implementing the DTF Progress report Support the WSP technically (on demand) in implementing the DTF Quality checks

Contractor side Contractor Site agent Overall responsibility for planning, coordinating and supervising the construction project Is in charge of preparing a work schedule, procuring material, and hire specialised staff to carry out the project Must ensure that the project adheres to local regulation, including safety and building codes Is responsible for responding to emergencies, incidental problems and delays Works alongside the contractor to make sure the project is carried out on schedule Is responsible for all on-site activities Must regularly test materials and machinery to ensure they are working efficiently Must keep accurate records of work progress for daily report to the client (WSP)

WSP side Managing Director Resident Engineer (Project Manager) Inspector of Work Is responsible of the successful implementation of the DTF In charge of the DTF implementation Supervises the work of the contractor: issue instructions Communicate any change of scope Reports to the WSTF Inspects the work of the contractor on a daily basis Plays a key role in quality control Reports to the Project Manager