The Danish CDM Project Development Facility Financing CDM in Indonesia

Slides:



Advertisements
Similar presentations
1 Sustainable Development Assessment of CDM projects in Georgia Mariam Ubilava Istanbul, Turkey January, 2008.
Advertisements

Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
CDM and SSN: A winning combination. SSN and CDM Creating partnerships between South, South and North countries through the opportunity of the Clean Development.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
From PoAs to NAMAs a pilot case. 222 Agenda 1. Context of discussions 2. Objective and concept for NAMA Pilot Case 3. Introduction to example PoA – EE.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
Current CDM experiences HeidelbergCement
Mitsubishi Research Institute Inc. 1 MRI ’ s climate activities Kenichiro Yamaguchi Senior Staff Researcher, MRI New Delhi, October, 2002.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
A Business Case for the Gold Standard Heidi Forbes Gold Standard and the Clean Development Mechanism Capacity Building Workshop 7 th December 2006.
-2- Opportunities for CDM/JI Projects Renewable energy Electricity generation and transmission Energy efficiency Fuel switching Waste management Oil and.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon markets An international tool for cost-effective GHG mitigation.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
GERMAN SUPPORT for CDM CAPACITY BUILDING Marrakesh, Morocco 22. April 2004 Holger Liptow Climate Protection Programme (CaPP) CaPP.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
ECONOLER INTERNATIONAL CDM/JI Office Canada Development of a Portfolio of CDM Projects in Indonesia Access to CDM & JI office of Canada facility Presented.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
The Role of the Designated National Authority (DNA) in preparation of CDM Projects 1 Designated National Authority for the Clean Development Mechanism.
Financing climate-friendly projects in the Balkan region DAC PROJECT CAPACITY BUILDING IN BALKAN COUNTRIES IN ORDER TO DEAL WITH CLIMATE CHANGE Prepared.
CDM Status in Pakistan Dr. Syed Sajidin Hussain Clean Development Mechanism Cell Ministry of Environment, Government of Pakistan
E8-GEF-UNDESA Financing Sustainable Electrification Dialogues HCB Initiative e8-GEF-UNDESA 'Financing Sustainable Electrification Dialogues' Human Capacity.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
1 CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM) 2 nd National Workshop on Capacity Development for the Clean Development.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© ESD 2003 IRIS KYOTO Achieving Carbon Finance: Carbon Funds and key issues (Including European Emissions Trading Scheme) Jeremy Doyle ESD, UK European.
Clean Development Mechanism Cell, Ministry of Environment, Government of Pakistan Pakistan National Operational Strategy for Clean Development Mechanism.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Practical issues in identification and development of CDM projects AIT, Bangkok, October 20, 2005 Soeren Varming Senior Consultant, Climate Change
The Netherlands - Bulgaria Economic Relations and Co-operation.
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
14 November 2006 UNFCCC Side Event, COP/MOP, Nairobi Development and Implementation of a JI Track 2 project Manfred Stockmayer Director Camco International.
PELANGI Solid-Waste Management and Financing: With Special Focus on CDM Agus P. Sari Managing Director Pelangi – Ecosecurities Alliance on Climate and.
Project Development Guidelines and CDM Activities in Pakistan
July 3 – 4, 2003, Szentendre Dr. Valdemars Scerbaks MSc Peteris Blumats.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist,
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
How to Develop Landfill Gas CDM Projects with Local Municipal Authorities? Kok Kee Chow, Managing Director, Sustainable Technology Resource Centre STREC.
Danish Project Experience
Feasibility study to use waste as fuel for cement factories
CDM –Functional Overview
What JCF observed in its
January 25, 2006 Tokyo Electric Power Company (TEPCO)
UNFCCC Technical Workshop on Joint Implementation
UNDP - Fortis MDG Carbon Facility
Indocement’s CDM Project
Stephanie Rogers Latin American Carbon Forum October 20, 2017.
Possibilities for promoting environmental protection projects
Presentation transcript:

The Danish CDM Project Development Facility Financing CDM in Indonesia Erik Dugstad, Sr. Economist, ECON Analysis Agus Sari, Climate change specialist, Pelangi Contact: erik.dugstad@econ.no – Phone: 021 5221930

Danish Climate Strategy Published by Danish Government in February 2003 Key issue: Introducing Kyoto Mechanisms to achieve cost efficiency Balance between domestic action and buying of credits defined in economic terms. Maximum cost of domestic measures set at 120 DKK or approximately 20 USD pr ton of CO2-eq

Uncoupling of economic growth and CO2-emissions 50 75 100 125 150 1988 '89 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 GDP CO2-emission Primary Energy Supply

Share of Renewable Energy in Denmark Red: Share of electricity Blue: Share of total energy

Danish demand for Carbon Credits Danish EU-burden sharing target is reduction of 21% in 2008-2012 compared to 1990-level Three sources of ”deficit” compared to target: 10 mill. Tons CO2/year from lack of success in achieving reductions i.e. in the transport sector 10 mill. Tons CO2/year from expected electricity export 5 mill. Tons CO2/year from (lack of) base year adjustment Projected total demand 25 mill tons CO2/year for 5 years or a total of 125 mill tons Government expected to buy 20% - The rest by private sector (mainly electricity sector)

Bilateral collaboration in focus Government purchases through pipelines of Ministry of Foreign Affairs: Bilateral collaboration on CDM in Malaysia, Thailand, Indonesia, China and South Africa Environmental Protection Agency: JI-projects in Eastern Europe Multilateral Carbon Funds – A Danish Fund in the World Bank Incentives for private sector EU Emissions trading scheme started 1. January 2005 Directive implemented that links emission trading and JI/CDM A Memorandum of Understanding between Denmark and Indonesia has been signed between Ambassador Andersen and Minister Witoelar on July 27, 2005

Huge CDM potential in Indonesia 125 - 300 million ton CERs in the period 2008-2012 Could create a value of 625 -1200 million USD via sales + large local benefits for sustainable development Opportunities in many sectors Cement Oil and gas Landfill and waste Pulp and paper Steel Palm Oil Electricity Energy saving Etc

Impact of CDM for landfill to energy projects Threshold for producing power from landfill gas is 150 tonnes of waste per day Emission reductions generated by avoiding methane emissions from deposited waste and displacement of grid connected fossil fuel plants Contribution from CDM is more than half of the electricity tariff The table below indicates impact CDM on IRR for different sizes of landfills

Impact of CDM for Palm Oil Mill Effluent Mill with capacity of 40 ton of Fresh Fruit Bunches per hour Power generated will be connected to the grid Contribution from CDM is more than half of the electricity tariff Impact of CDM is different per technology used

How to develop a CDM project? timeline CERs issued Pre-feasibility PDD Development Implementation Registration Final Host Country Approval Project Validation PIN Feasibility study Conditional Host Country Approval Financial closure Operation Monitoring Danida Project Development Facility Danida buys CERs

Transaction costs of CDM Project Feasibility and Due Diligence $5,000 - $10,000 Documentation (PDD) US$ 20,000 – $50,000, up to $100,000 with new methodology Public Consultation About $2,000 – 10,000 Validation $8,000 - $15,000 Approval by the National Authority Currently free Registration to the Executive Board $5,000 - $30,000 (according to the project) Implementation of the CDM Project According to the project Underlying investment Monitoring Verification $5,000 – $10,000

Benefits of participating You get a new income stream for your project – with no risk for you Danida takes all the CDM related risk Danida takes all the trouble getting the paper work done Preparing a Project Design Document Getting the PDD validated Getting an Indonesian National Approval Getting the registration at the CDM Executive Board Danida buys the CERs when they are delivered

Criteria for participating The underlying project must be technically and financially viable The technical design Financial viability/project financing Legal and commercial status of the project The project should be likely to be approved as CDM project Contribution to sustainable development Likelihood of being additional Existence of baseline methodology The project proponent is capable to implement the project Technical and management capability Financial solidity of the company

The formalities Action Date Announcement of call for proposals 27 July 2005 Closing for proposals Pre-assessment/selection 3 October 2005 4 October - 21 November 2005 Announcement of results 22 November 2005 Signing of Letter of Intent 22 November – 29 November 2005 Second call with tentative closing date: 1 February 2006

Possible next step in the waste-management sector A number of workshops will be organised giving more information on the Project Development Facility A follow-up workshop to develop Project Idea Notes (PINs) in the waste-management sector. If you have a project already then contact the project secretariat to get a template for a PIN. A one-on-one consultation on project development and writing of PIN is possible.

Secretariat of Danish CDM Project Facility Contact Secretariat of Danish CDM Project Facility c/o Royal Danish Embassy Menara Rajawali 25th Floor Jl. Mega Kuningan Jakarta 12590 Telephone: + 62 21 576 1478 ext 114 Fax: + 62 21 576 1535 E-mail: jktamb@um.dk Website: www.emb-denmark.or.id Or ECON (in Jakarta) – emd@econ.no – Hp: 0815 8155048 Pelangi - rde@pelangi.or.id – Phone: 021 - 72801172