Moving Forward From Fukushima Near-Term Task Force EP Recommendations

Slides:



Advertisements
Similar presentations
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
Advertisements

Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Vermont Yankee Presentation to VSNAP 7/9/12 VY/Entergy Fukushima Response Bernard Buteau.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Status of the U.S. Nuclear Regulatory Commission’s Initiatives on the Use of Cesium-137 Chloride Sources March 10, 2009 Regulatory Information Conference.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Basics of OHSAS Occupational Health & Safety Management System
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Nuclear Energy Institute Initiatives NRC Region I/FEMA I, II, & III Joint Scheduling Conference Susan Perkins-Grew Senior Project Manager.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 Update on Emergency Preparedness and Response Activities 2009/2010 NRC Region I/FEMA I, II & III Joint Emergency Preparedness Information Conference.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
Business Continuity Disaster Planning
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Pipeline Safety Management Systems
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Utilizing Your Business Continuity Plan.
Current Plant Performance
Update on EPA Regulatory and Guidance Activities
NRC’s Category 3 Source Security and Accountability Initiatives
Spent Fuel Pool Instrumentation NRC Order EA
Vesa Tanner European Commission Directorate-General Energy
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Office of Nuclear Material Safety and Safeguards (NMSS)
Industry Guidance on Part 21 Evaluation and Reporting
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Update on Category 3 Source Security and Accountability Initiatives
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
NRC Cyber Security Regulatory Overview
Robert Kahler Branch Chief
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
LLW Forum Meeting October 17, 2017 Alexandria, Virginia
Communication and Consultation with Interested Parties by the RB
Research and Test Reactor Safety: The Regulatory Perspective
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Linda M. Chatwin, Esq. RAC Business Manager, UL LLC
Decommissioning Rulemaking
Prime Contractor Performance
Thomas Koshy, On Behalf of Brian Thomas, Director
NRC Update of LLW Emerging Issues
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Industry Perspectives on Part 61 Rulemaking
RESOLUTION OF GENERIC SAFETY ISSUE 191
Japanese Nuclear Accident And U.S. Response
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

Moving Forward From Fukushima Near-Term Task Force EP Recommendations Mark Thaggard, Deputy Director for Emergency Preparedness U.S. Nuclear Regulatory Commission

Topics Tier 1 EP Near Term Task Force (NTTF) Recommendation NTTF Tier 2 and Tier 3 Recommendations Emergency Planning Zone (EPZ) and Potassium Iodide (KI)

Definitions Tier 1-without delay Tier 2-as resources become available Tier 3-longterm study

Tier 1 NTTF Recommendation Staffing Communication ERDS modernization

Tier 1 NTTF Recommendation 10 CFR 50.54(f) Staff request Phased approach NEI Guidance The staff utilized the following assumptions: • all units affected, • extended loss of all AC power, and • impeded access to the units The staff requested that licensees provide the following for staffing: Assess staff that would respond to this event How staff would move equipment Notification Methods to access the site Interim actions Implementation schedule Governing document to implement Regarding Communications: identify any enhancements that may be needed to ensure communications are maintained NEI developed guidance NEI 12-01 which has licensees provide a phased approach to the request for information 90-days to address interim actions, methods of access, notification October 31, 2012-Communications April 30, 2013 staffing 4 months prior to the second refueling outage staffing and communications to address any mitigating strategies (pumps, generators, hoses, etc) to keep the core, containment, and spent fuel pool cool. This is NTTF recommendation 4.2

Tier 1 NTTF Path forward Staff is reviewing licensee responses Staff will provide licensees a safety evaluation report regarding the acceptability of their strategies Staff will make generically applicable (rulemaking) through Tier 3 efforts

Tier 2 NTTF Recommendations 9.3: Order licensees to do the following until rulemaking is complete: add guidance to emergency plans for performing multi-unit dose assessments; conduct periodic training and exercises for multi-unit and prolonged SBO scenarios; ensure that EP equipment and facilities are sufficient to deal with multi-unit and prolonged SBO scenarios The staff initially engaged the Commission to combine the Tier 2 EP items with the Tier 3 items in an Advanced Notice of Proposed Rulemaking (ANPR). The Commission disapproved the staff’s recommendation citing insufficient justification. The staff has recently reevaluated these Tier 2 EP items and believes with the exception of the multiunit dose assessment that the periodic training and exercises as well as the equipment and facilities can be achieved through the Tier 1 activities being undertaken to implement the mitigating strategies order (Order EA-12-049). These activities would be made generically applicable in the rulemaking for NTTF Recommendations 4, 8, and 9.1 and 9.2. The staff is waiting for input from NEI regarding Industries multiunit dose assessment capability to inform the staff’s recommendation to the Commission. The staff will issue an Order, 50.54(f), are recommend that no action is warranted until rulemaking due to the voluntary initiatives industry is undertaking.

Tier 2 NTTF Path forward Commission Paper-delineating staffs recommendation Awaiting Commission direction

Tier 3 NTTF Recommendations 9.1: Initiate rulemaking to require EP enhancements for multiunit events 9.2: Initiate rulemaking to require EP enhancements for prolonged Station Blackout 9.1 and 9.2 make 9.3 (staffing and communications) , multiunit dose assessment, and aspects of ERDS- continuous capability generically applicable through the rulemaking process

Remaining Tier 3 NTTF Recommendations Additional EP topics for prolonged SBO and multiunit events Recommendation 11 EP topics for decision-making, radiation monitoring, and public education 10-Protective equipment for staff, command and control (similar to the National Incident Management System (NIMS)), ERDS-alternate method to transmit, correct data set, continuous operation Recommendation 11-This has the potential to have an impact on State and local emergency management officials and structure Changes to e-plan based upon infrastructure damage-could result in changes to LOAs just as in licensees addressing impeded access for staffing Recovery and Reentry-working with FEMA, hold public meetings decision-making framework Appropriate use of KI in the local community.

Tier 3 NTTF Path Forward Initiate an Advanced Notice of Proposed Rulemaking (ANPR) Engage stakeholders Develop regulatory basis Issue rule These are the steps that would be taken if we went towards rulemaking. The staff submitted a paper to the Commission-SECY 12-0095 outlining its efforts. This would not start until FY 2014 at the earliest.

Additional Items Basis of Emergency Planning Zone Size Commission Paper identified the EPZ size as an additional item NRC received a Petition for Rulemaking in February 2012 Pre-staging of KI beyond 10 miles If the staff engages on the EPZ size, we would involve all stakeholders. Currently, this will be informed by a study of the dose from multiple plants to see the impact on response strategies known as the level 3 PRA. In addition, the staff is working to address a petition to expand the EPZ. It was put out for public comment, staff addressing comments and will make a recommendation on whether to proceed or deny. KI-long term study. We will continue to track the studies being conducted and the information obtain to determine whether any changes to our policies are needed.

Questions?

Contact Information Mark Thaggard Division of Preparedness and Response Office: (301) 415-1086 Email: mark.thaggard@nrc.gov