Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers.

Slides:



Advertisements
Similar presentations
ATML Readiness For Use Phase II. Phase II Readiness For Use The ATML: Phase II will build on the Core phases, adding additional ATML components and features.
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Sliver Information system KITMaster. Sliver Information System KIT Real time production and quality monitoring –sliver count –sliver evenness –spectrogram.
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
RiT PatchView Solution
Chapter 3: Planning a Network Upgrade
Antonio González Torres
System Development Life Cycle (SDLC)
Components of GIS.
Most Used SPI Modules Instrument Index Module Instrument Spec Module
Mr C Johnston ICT Teacher
UT-Space Manager. Define Rooms The Define Rooms task is used to manage your room data. 1.On the Process Navigator, click on the Space Inventory & Performance.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Optimos Solutions – Working For You Presented to JMATE 2006.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
Computer Integrated Manufacturing CIM
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer 2003.
Institute of Technology, Sligo Dept of Computing Semester 3, version Semester 3 Chapter 3 VLANs.
Maintaining and Updating Windows Server 2008
Design, Implementation and Maintenance
Data Center Wizard™ with RackBuilder™. NetZoom: Professional Network Design NetZoom: The Complete Hub of Network Shapes and Stencils The world’s largest.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
WEB DESIGNING Prof. Jesse A. Role Ph. D TM UEAB 2010.
Final Design and Implementation
Duties of a system administrator. A system administrator's responsibilities typically include:
TIBCO Designer TIBCO BusinessWorks is a scalable, extensible, and easy to use integration platform that allows you to develop, deploy, and run integration.
Module 10 Configuring and Managing Storage Technologies.
Network Design Essentials. Guide to Networking Essentials, Fifth Edition2 Contents 1. Examining the Basics of a Network Layout 2. Understanding Standard.
Characterizing the Existing Internetwork PART 1
Smith’s Aerospace © P. Bailey & K. Vander Linden, 2005 Architecture: Component and Deployment Diagrams Patrick Bailey Keith Vander Linden Calvin College.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
1 © 2005 Cisco Systems, Inc. All rights reserved. Session Number 11911_11_2005 Managing Cisco Unified Communications Reducing costs and improving resilience.
The Asset Inventory Management module assists with data collection and discovery management processes. Collected information is interpreted and automatically.
Implementing Baan PDM BWU – Orlando, FL October 17, 2001 Session 6 Chris Jamison RedKlay Web Solutions, Inc. PDM = Product Data Management.
Prepared by: Sanaz Helmi Hoda Akbari Zahra Ahmadi Sharif University of Tech. Summer 2006 An Introduction to.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Intro to Network Design
SiteWiz – RiT ’ s CAM Solution. Daily IT Challenges Overload of infrastructure information Numerous daily changes Many departments involved No clear picture.
Chapter 6 Systems Design The design stage in the SDLC Evolution in IS design Evolution in computer architectures The systems approach to design User interface.
MIS Gap Analysis “Make technology work for you”. Assumptions All training participants are from banks that have a memorandum of agreement for microfinance.
Chiller control system Lukasz Zwalinski – PH/DT.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Creating A Single Equipment Database Presented By Keith.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Practical Networking.
August 2003 At A Glance The IRC is a platform independent, extensible, and adaptive framework that provides robust, interactive, and distributed control.
Exporting Diagram Data. NetZoom: Professional Network Design NetZoom: The Complete Hub of Network Shapes and Stencils The world’s largest library of network.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Project Vision Improve Resilience of NetWare User Filestore Improve Resilience of Corporate Database Filestore Disaster Recovery Options ? Backup, Archival,
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
Discovering Computers 2010: Living in a Digital World Chapter 14
Chapter 11 Designing Inputs, Outputs, and Controls.
Computer Aided Software Engineering (CASE)
System Design.
EIN 6133 Enterprise Engineering
Maximo Upgrade Information Session
NTC 320Competitive Success/snaptutorial.com
CLINICAL INFORMATION SYSTEM
Introduction to Systems Analysis and Design
Planning a Network Upgrade
Analysis models and design models
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Hitachi Storage Service Manager
7.3 Example Use Cases Spirent Automation Platform Technologies.
Presentation transcript:

Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers

Obtain 24/7 Completely Integrated Infrastructure Database Powerful Planning Tools GUI-Based System Views Dynamic and Customizable Reports Multi-Site and Multi-User -- With SECURITY --

Obtain 24/7 Functions Cable Transport Work Orders Purchasing Automation Power Management System Views -- All with SECURITY --

Obtain 24/7 Cable Transport Systems Management Fiber Transport System Escon and Ficon Channels Copper Transport (Legacy) System Bus and Tag, SCSI SAN Transport System Current (and future) Fiber Channel Cables Automatically Design, Build And Manage all Cable Transport Formats

Device Diagrams Detailing Connectivity. In this case we see the individual path followed by a particular interface showing ChpIds and Fiber Directors Include Bus and Tag, or other topologies Obtain 24/7 Fiber or Copper Transport Configuration Management

Fabric Path Diagram Obtain 24/7 SAN Transport Configuration Management

Obtain 24/7 Work Order Functions Reports – Complete Systems, Asset Lists And Labels Auto-generation of Internal Work Orders Export to Purchase Order Modules Powerful Operational Toolset includes: Design and Change Management, Alternate Configuration Comparison, and Integration With Other Modules

Obtain 24/7 Work Order Challenges Documenting changes from planners to checkers to implementers Automatically manage allocation of key infrastructure resources Automatically maintain documentation as plan develops or morphs Allow for planning stage variations –What Ifs

This is a diagram, using the workorder process. This process allows all changes to be planned prior to actual build-out. Anyone with proper clearance can view the upcoming changes and proposed changed elements are highlighted in blue. Obtain 24/7 Work Order Design Functions After design is vetted, necessary parts can be automatically reserved from inventory, or ordered from supplier.

Obtain 24/7 Work Order Functions Process Chart Automatically generate the how to plans for system upgrades. Chart shows tasks required to implement new scheme, in order.

Obtain 24/7 Work Order Functions The Work Order tool set shows the projected complete system, clearly indicating the changed elements (here shown in blue)

Obtain 24/7 Purchasing Automation/Inventory Management

Obtain 24/7 Purchase Order Management

Obtain 24/7 Power Management Module The Power Management Module integrates all power oriented devices, cables, etc into the Obtain 24/7 database. All power paths are maintained and can be viewed at the press of a button. Running totals of KVA and Amps used are available are graphically presented to assist the planners.

Obtain 24/7 Power Management Power Panel with Breaker View of individual power taps.

Obtain 24/7 Power Management Individual Power Paths can be viewed in a system format, from individual components, through power conditioning systems, all the way to the mains.

The Power Manager component logically connects power panel breakers to individual devices on the computer room floor. Note the tripped breaker. This occurs when the total of the power assigned to be drawn from a single point on a PDU exceeds its designed capabilities. Obtain 24/7 Power Management Detail Functions

Obtain 24/7 System Views Fully integrated with the Obtain 24/7 database are a wide range of System Views. We have already shown several of the views provided. Additional views include equipment rack views and location views

Obtain 24/7 System View Details Examining the equipment rack view shows, at a glance, all equipment and connections installed in an individual rack. No more time wasted making un-needed trips to the system room during planning sessions.

Location Views - Light CAD Drawings. Views provide a birds eye view of system rooms, racks, cabinets and even wiring closets Obtain 24/7

Obtain/24 Benefits Powerful Planning Tools GUI-Based System Views Dynamic and Customizable Reports Multi-Site, Multi-User -- With SECURITY