Transmission Engineering

Slides:



Advertisements
Similar presentations
Introduction to the Concept of Continuing Airworthiness
Advertisements

Special Recognition Cheryl Wilson, State Auditor and Inspectors Office Presented by Ann Embree and Sherri Schieffer County Training Program and Oklahoma.
Effective Generator Testing & NFPA o Highlight key elements of NFPA 110 as it relates to generator testing o Describe diesel engine fundamentals.
HIPAA: Privacy, Security, and HITECH, Oh My! Presented by Stephanie L. Ganucheau, Special Assistant Attorney General.
National Electrical Code codified by Massachusetts 2011 edition Always consult with the Inspector of Wires (AHJ) for his or her interpretation of the Code….
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Oregon Public Utility Commission Safety & Reliability Section J.R. Gonzalez, P.E., Manager Jerry Murray, Sr. Utility Analyst Gary Putnam, Utility Analyst.
CLIMBING SPACE Section 236
Code Comparison Changes 2012 IBC to 2012 NPFA 101 Developed for the Florida Department of Business And Professional Regulation Building Codes and Standards.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
DUCK RIVER EMC Lockout/Tagout Procedures For Overhead and Underground Line Work (De-energizing Lines and Equipment for Employee Protection)
Health and safety at work
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
Oregon Public Utility Commission Safety and Reliability Section Jerry Murray, Manager Bob Sipler, Utility Analyst What is an “Attachment”? … that’s easy!
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
Fire Service Mission and Regulations Firefighter I.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
1 Oncor Electric Delivery Proposed Changes To The 2012 National Electrical Safety Code.
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
2010 Florida Building Code: I nterpretation P rocess O verview.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
2015 SAFETY SEMINAR HIGHLIGHTS OF 2014 Rick Moses Chief, Bureau of Safety Florida.
Session 11 Grid Tied PV Systems – Part 1 Standards and Codes October 01, 2015.
Take 5 for Safety 10CFR851 and Electrical Equipment Installation.
National League of Cities Increasing Wireless Communications Services for Your Residents Congressional and FCC Action on Mandatory Wireless Facilities.
Design and Structural Specifications. Foreword For the protection of public life and property, the design of structures and the preparation of structural.
Ordinance Amending Orange County Code Section October 27, 2009.
The National Electrical Safety Code ("NESC") Presented by
©2011 Ohio Rural Electric Cooperatives 2012 NESC Update Changes to Work Rules.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
ENERGY: STATE - OF - PLAY IN GHANA
Chapter 8. Electrical Systems
Presented by Leighton Porter, EIT Monte R. Lee & Company
Application of Northern Virginia Electric Cooperative PUE
MODULE 5: GOVERNANCE standards and guidelines
OSHA Electric Power Training Rules Qualified vs. Unqualified Employees
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Distribution substations
Energy Storage System Guide for Compliance with Safety Codes and Standards Gene Eckhart November 2, 2016.
Photovoltaic Systems Engineering Session 19
Who is ICC? Private, Non-profit public benefit corporation:
2017 Virtual Officer’s Training Workshop
ARC SEMINAR ON PLANNING & BUILT ENVIRONMENT 5TH MAY 2018
Robert’s Rules of Order
TxDOT Utility Related Issues
Chapter 8. Electrical Systems
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Are Your Employees Qualified?
Photovoltaic Systems Engineering Session 12
Fire Alarm Tech Practice Test # 16 NICET
Are Your Employees Qualified?
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
How we got to where we are today.
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
North Carolina Department of Insurance Office of State Fire Marshal
State Electrical Division North Carolina Department of Insurance
North Carolina Department of Insurance Office of State Fire Marshal
NESC Update Present & Future
National Legislation in the Pressure Sector and the PED
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
North Carolina Department of Insurance Office of State Fire Marshal
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

Transmission Engineering James Houston Chief Engineer Member of NESC Subcommittee 3

History & Development of the National Electric Safety Code Started in 1913 by the National Bureau of Standards as a circular. Published as various parts until NBS Handbook H30 was published in 1948 which was the last complete edition of the NBS Handbook. Published in parts again until 1970 when the sections which became the NEC and the Radio Installations Rules were split out. Since 1981 has been published periodically in its present form with extensive changes in 81, 87, and 90.

History & Development of the National Electric Safety Code The 1997 code edition was the first to be published for a five year cycle. The current edition is now the 2017. It is available in both printed and electronic form.

What is the Purpose of the NESC? The purpose of these rules is the practical safeguarding of: Public Utility Workers Utility Facilities during the installation, operation, or maintenance of electric supply and communication lines and associated equipment. IT IS NOT TO BE CONSIDERED AS A DESIGN SPECIFICATION OR INSTRUCTION MANUAL.

General Rules for Using the NESC Rule 012. General Rules A. All electric supply and communication lines and equipment shall be designed, constructed, operated, and maintained to meet the requirements of these rules. B. The utilities, authorized contractors, or other entities, as applicable, performing design, construction, operation, or maintenance tasks for electric supply or communication lines or equipment covered by this code shall be responsible for meeting applicable requirements.

Why We Follow the National Electrical Safety Code? The NESC as written is a voluntary standard. However, some editions and some parts of the Code have been adopted, with and without changes, by some state and local jurisdictional authorities. To determine the legal status of the National Electrical Safety Code in any particular state or locality within a state, the authority having jurisdiction should be contacted. Who is the authority having jurisdiction? State Public Service Commissions

NESC Committees S/C 1: Purpose, Scope, Application, Definitions, References S/C 2: Grounding Methods S/C 3: Electric Supply Stations S/C 4: Overhead Lines - Clearances S/C 5: Overhead Lines - Strength & Loading S/C 7: Underground Lines S/C 8: Work Rules Executive Subcommittee Interpretations

Questions?