AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build

Slides:



Advertisements
Similar presentations
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1Bundled Bridges Design-Build Project (PIN 1BOW.0C, D900028) Saratoga, Warren, and Washington Counties.
Advertisements

NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
Marcy Mealy Procurement Specialist CDBG Program
ESTIMATING By Laith Jacob.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
RFP Overview Alan A. Phillips, CPPB CTPM Texas Southern University Summer 2012.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN , Contract No. D Town of Chemung, Chemung County.
New York State Department of Transportation
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Purchasing Overview. Fundamentals of Purchasing Procedures.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
RFP Health Education center furnishings
Green Line Extension Project
FAR Part 2 - Definitions of Words and Terms
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Construction Oversight
CON 280: Source Selection and the Administration of Service Contracts
Doing Business with Santa Clara Valley Transportation Authority (VTA)
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Designers’ Manual Appendix Contents
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
DIVISION OF STATE SERVICES BUREAU OF CONTRACTS
MANDATORY PRE-BID MEETING
Green Line Extension Project
San Benito County Local Transportation Authority Request for Proposals # Operation of San Benito County Express and Specialized Transportation.
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Design-Build Acquisition and Contract Incentives July 19, 2018
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Delta Water Supply Project
Environmental Requirements and planning grants
Omnibus IV Contracting Strategy Michael D’Alessandro
Design-Build Acquisition and Contract Incentives May 9, 2019
DESIGN-BUILD PROGRAM OVERVIEW
Right of Way Certification
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
CDBG Disaster Recovery Stormwater Program Workshop February 25, 2010
Presentation transcript:

AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build

Areawide TMDL Design-Build Presentation Overview Project Overview Procurement Overview Post Award Overview Procurement Schedule Questions

Areawide TMDL Design-Build Project Overview

Areawide TMDL Design-Build - Overview Project Area will be 11 TMDL Eligible Counties

Areawide TMDL Design-Build - Overview The contract generally consists of the design and construction of Existing Outfalls and SWM Facilities to maintain existing needs while maximizing the achievement of TMDL Credits The scope of improvements is anticipated to include, but is not limited to, topographic survey, earthwork, drainage, stormwater management (SWM), erosion and sediment control (ESC), landscaping, maintenance of traffic, utility coordination, Plats Development, Right-of-way acquisition and environmental permit acquisition.

Areawide TMDL Design-Build - Overview MDOT SHA will be providing a Menu of : Approximately 2,000 to 3,000 Failing Outfall Locations throughout the 11 Counties Approximately 150 to 200 SWM Retrofit Locations throughout the 11 Counties SWM Locations throughout the 11 Counties that do not require Retrofitting or Remediation for the Design-Builder to achieve TMDL credit through Innovation

Areawide TMDL Design-Build - Overview The Administration will require a minimum of no less than 500 TMDL Credits for the Fixed Price

Areawide TMDL Design-Build - Overview Design-Builder to complete (Not limited to) NEPA Process (With MDOT SHA Coordination) Any necessary topographic survey Any Geotechnical investigations necessary (no borings or survey will be completed by MDOT SHA) Utilities Designation (MDOT SHA will not entertain relocations) Permitting SWM and ESC Wetland and Waterways Permitting (DB will be the permittee) MDE Wetland/ Waterways and ACOE have concurred with this approach Right-of-Way acquisition Identify temporary and permanent needs. Plat preparation Acquire required ROW in the name of the State

Areawide TMDL Design-Build - Overview NEPA MDOT SHA is working with FHWA to obtain approval of a Minor Programmatic Categorical Exclusion (PCE) with Appendix 2 prior to award of this contract. Only applicable to Preliminary Design Activity. Will not authorize Final Design, Final Permit Application, Right-of-Way acquisition, or construction activities to occur. The Design-Builder will provide documentation and services to support the Administration’s coordination in obtaining site specific NEPA PCE approval for Final Design, Final Permit Application, Right- of-way Acquisition or Construction Activities to occur. The Minor PCE will only allow the Design-Builder for performing PD activities only (e.g., agency coordination, permitting activities; and data gathering/initial site assessments such as soil borings/investigations; wetland delineations; cultural resource investigations; utility test pitting/identification; geotechnical investigations; field surveys). The Minor PCE will not authorize/allow Final Design, Final Permit Application, Right-of-way Acquisition or Construction Activities to occur.

Areawide TMDL Design-Build - Overview Innovation MDOT SHA is looking to maximize the benefit to the environment through Innovative: Techniques Materials Products MDOT SHA will not be specifying the use of an proprietary items. However we expect that Proposers may propose to use products or materials that are proprietary MDOT SHA’s Alternative Technical Concept (ATC) Process will be included to allow Proposers to propose their innovation during procurement

Areawide TMDL Design-Build Procurement Overview

Areawide TMDL Design-Build - Procurement Total Project Classification “I/J” - $30,000,001 to $75,000,000 Competitive Sealed Proposals (COMAR 21.05.03) Best Value Selection Letter of Interest will be Required to Propose One-Step Procurement Process Request for Proposals (Technical Proposal & Price Proposal) Stipends currently anticipated around $200,000 All Outfall and Stream Restoration site must be accepted for maintenance and all SWM sites As-Built must have received structural acceptance by October 2020

Areawide TMDL Design-Build - Procurement One on One Meetings Only for those who submit a Letter of Interest and met the Bonding requirement They are CONFIDENTIAL Proposers may: Ask Questions related to the RFP (Proprietary or Clarifications) Identify Concerns/Conflicts in RFP Discuss solutions to address project goals Present Potential ATCs Agenda is set by Proposer +/- 1 week prior

Areawide TMDL Design-Build - Procurement Technical Proposal Design-Builder Capability Key Staff Resumes Firm Past Performance Organizational Chart Project Understanding and Approach Project Scope Risk Identification and Management Design-Build Approach

Areawide TMDL Design-Build - Procurement Price Proposal The Price Proposal will include 3 Lump Sum Items to be provided by Proposers as part of their Price Proposal: Lump Sum for Right-of-way Acquisition Lump Sum for TMDL Credit Design Lump Sum for TMDL Credit The 3 Lump Sum Items shall add up to the Fixed Price. Currently estimated at $ 50-Million

Areawide TMDL Design-Build - Procurement Price Proposal - Continued The Proposer will provide the Number of TMDL Credits they will achieve as part of this project The Number of TMDL Credits must be equal to or greater than 500 TMDL Credits An Evaluated Price will be determined based on the Fixed Price and the number of credits provided.

Areawide TMDL Design-Build - Procurement Selection In accordance with COMAR 21.05.03.03(F), award of the Contract will be to the responsible offeror whose proposal is determined to be the most advantageous to the State, considering evaluated price and the evaluation factors set forth in the Request for Proposals When determining which Proposer’s submittal is most advantageous to the State, the relative importance of the Evaluated Price is anticipated to be greater than the Technical Proposal

Areawide TMDL Design-Build Post Award Overview

Areawide TMDL Design-Build – Post Award The Awarded Design-Builder must achieve the TMDL Credits the Design- Builder includes in the Technical and Price Proposals for the Fixed Price. The Design-Builder will be allowed to select any of the locations in the Menu provided to achieve the credits It is anticipated that the payment of Lump Sum for TMDL Design will be a percentage to be paid 30 days after NTP with the remainder of the lump sum prorated over the life of the project and will be paid monthly. It is anticipated that the payment of the Lump Sum for TMDL Credit will be per site based on the number of credits for that site.

Areawide TMDL Design-Build – Post Award The payment of Lump Sum for TMDL Credit per site is anticipated to be paid in 2 installments: A percentage of a site’s payment is anticipated to be paid when all Permits, Approvals, and NEPA are obtained, R/W is cleared and the site is ready to proceed toward construction. Remainder of the site payment is anticipated to be paid after a Outfall and Stream Restoration sites is accepted for maintenance or a SWM sites has received As-Built structural acceptance.

Areawide TMDL Design-Build Procurement Schedule

Areawide TMDL Design-Build Anticipated Schedule Event Date Advertise RFP June 26, 2018 Letter of Interest July 3, 2018 One-on-One Meetings July 23-31, 2018 Last day to submit ATCs  September 18, 2018 Final date for RFP Questions  October 16, 2018 Technical and Price Proposal Submittal Due  October 30, 2018 Selection of Successful Proposer  November/December 2018 Notice to Proceed  January 2019

Areawide TMDL Design-Build Statement of Qualifications and Technical Proposals from previous projects are available at the following: www.roads.maryland.gov under Business Center, Contracts, Bids & Proposals, Design-Build Projects. This presentation and the meeting sign-in sheet(s) will be available at the following: www.roads.maryland.gov under Business Center, Contracts, Bids & Proposals, Design-Build Projects.

Areawide TMDL Design-Build QUESTIONS?

Areawide TMDL Design-Build Please submit any follow-up suggestions or concerns to the following email address: AX766D_TMDL@sha.state.md.us