Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Finding the Critical Path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Project Management Chapter 13
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management Techniques.
BA 333 Operations Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Roberta Russell & Bernard W. Taylor, III
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
3 Project Management PowerPoint presentation to accompany
Lean Project Management
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
1 Project Management Seminar Project Scheduling. 2 Importance of Project Management Three Components of Project Management Project Evaluation and Review.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
Project Management Techniques
To accompany Quantitative Analysis for Management, 7e by Render/Stair 13-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
Welcome to MM305 Unit 7 Seminar Dr. Bob Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
Operations Management Project Management Chapter 3.
Prepared by Raida Al-Awamleh 1 Project Management Training Program June 24 th -28 th,2006.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Welcome to MM305 Unit 7 Seminar Dr. Bill Wood Project Management.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Project Management Chapter 13
Project Planning & Scheduling
Project Management for Business
Projects: Critical Paths
Time Planning and Control Activity on Node Network (AON)
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
Project Planning and Budgeting
3 Project Management PowerPoint presentation to accompany
Prepared by Lee Revere and John Large
ENGINEERING MANAGEMENT (GE 404)
Chapter 16 – Project Management
Time Planning and Control Activity on Node Network (AON)
General Foundry Example of PERT/CPM
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Critical Path Method and Assignments for COLL
Scheduling.
Presentation transcript:

PLANNING ENGINEERING AND PROJECT MANAGEMENT Lecture#07 PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad DEPARTMENT OF ENGINEERING MANAGEMENT

Topics Covered Network Representation Network Development Dummy Activity Network Scheduling Practice Problems CPM Network Calculations

Network Representation Even though a linked Gantt Chart can include precedence relationships between activities, it is an unsuitable tool if these relationships grow beyond a certain complexity. In such situations, the scheduling should be carried out by a network technique. However, the presentation of the schedule to the project participants may still be done in a Gantt Chart format.

Arrows and nodes are used for construction of Network Arrows and nodes are used for construction of Network. There are two types of network representations: 1. Activity on arrow (AOA) 2. Activity on node (AON) Arrow Node Node

1. Activity on arrow (AOA) Event In AOA Arrow shows activity and precedence relationships 2. Activity on node (AON) Node Activity In AON Arrow shows precedence relationships only

For structure of network Network Development Following information is required in order to develop a network: A list of all activities A list of all precedence relationships An estimated duration of each activity (required for network scheduling) For structure of network

Problem 1 Activity Immediate Predecessor (s) A - B C D Table for network development

Problem 1 Act-ivity Immediate Predecessor A - B C D C D A B Activity on arrow (AOA) Act-ivity Immediate Predecessor A - B C D C D A B

Problem 1 Activity on arrow (AOA) 2 C A 4 1 B D 3

Problem 1 Activity on node (AON) D C A B START END

Dummy Activity An activity inserted into the network to maintain the logic of the network. A dummy takes zero time and do not consume any resources.

Dummy Activity A precedes B and C, B and C precede D B A 1 2 3 D 4 C Incorrect Display

Dummy Activity A precedes B and C, B and C precede D Correct Display 2 Add a Dummy as shown by dash line below. 2 4 1 A C B D 3 5

Problem 2 Activity Preceding Activity A - B C D E C,D F G H Table for network representation

General Hospital’s Activities and Predecessors Activity Description Immediate Predecessors A Build internal components - B Modify roof and floor C Construct collection stack D Pour concrete and install frame A, B E Build high-temperature burner F Install pollution control system G Install air pollution device D, E H Inspect and test F, G Table for network representation

AON Network for General Hospital Start A B C D E F G H Arrows show precedence relationships

AOA Network for General Hospital C Construct stack 1 3 2 4 5 6 7 A Build internal components Install controls F Dummy Activity Build burner E H Inspect/Test Modify roof/floor B Install pollution control device G D Pour concrete/ Install frame

A Comparison of AON and AOA Network Conventions

Problem 3 Activity Preceding Activity A - B C D E F G H D, E I F, G Table for network representation

Network Scheduling The purpose of network scheduling is To determine when the project will finish To determine which activities directly influence the project duration Two techniques of network scheduling are: Critical path method (CPM) Program evaluation and review technique (PERT)

PERT and CPM Developed in 1950’s CPM by DuPont Cooperation for chemical plants (1957) PERT by Booz Allen Hamilton with the U.S. Navy, for Polaris missile (1958) Consider precedence relationships and interdependencies Each uses a different estimate of activity times What circumstances lead the two organizations to develop different, yet similar tools for the management of complex projects? In your discussion of PERT/CPM, you should probably note that PERT helps us identify critical tasks/activities and look at the probability of completing the project by a given date; CPM helps us analyze the cost/time tradeoffs possible if we need to speed the project up.

Questions which may be addressed by PERT & CPM Is the project on schedule, ahead of schedule, or behind schedule? Is the project over or under cost budget? Are there enough resources available to finish the project on time? If the project must be finished in less than the scheduled amount of time, what is the way to accomplish this at least cost?

Six Common Steps to PERT & CPM Define the project and prepare the work breakdown structure. Develop relationships among the activities. (Decide which activities must precede and which must follow others.) Draw the network connecting all of the activities Assign time (and/or cost) estimates to each activity Compute the longest time path through the network. This is called the critical path Use the network to help plan, schedule, monitor, and control the project

CPM Network Calculations CPM calculates a network in several steps: For each event: Earliest possible time: The earliest possible time the event can occur Latest possible time: The latest possible time the event can occur

For each activity: Early start (ES): The earliest possible start time for the activity Early finish (EF): The earliest possible finish time for the activity

For each activity: Late start (LS): The latest possible start time for the activity so as not to delay the completion time of the entire project. Late finish (LF): The latest possible finish time for the activity so as not to delay the completion time of the entire project. Continue to next lecture