Question & Suggestions March 17th

Slides:



Advertisements
Similar presentations
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Advertisements

HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
The MICE Target Lara Howlett University of Sheffield.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Cable and Service Installation David Warner Colorado State University May 11, 2009.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Formative Assessment. 1. A 130. gram uniform meter stick has a 22.0 g clamp on the 23.0 cm mark, where would you clamp a 35.0 g clamp to make the meter.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Fundamental Digital Electronics
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Suggestion for installation Demolish and destroy the old air condition, then send them to owner building Install a new one by last main.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
DCal-ALICE integration and installation plan and status A. Tauro.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
Final Concept Lead Filter Movement System Dennis Haasler EN-MEF-EBE.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
4 Starting Tips to Keep Your Car in Top Condition
TS2 preparatory meeting
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
MERcury Intense Experiment Experiment Layout
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
ILC-SCRF Test Facilities considerations
Update of MVD services and requests
Beam
The LHCb Installation Story
E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H
VELO-installation meeting CERN, January 17, 2006
- CT INSTALLATION PROCEDURE OVERVIEW -
CMS Area Working Group Meeting
Dump Window Cooling Sleeve 3D Models for CFD
Detector Service Cavern for ILC
Warm structure requirements :
Chamber Design and Integration RE3/1 and RE4/1
Heating of ALFA detectors
Optical configuration of GIF
Bohr Model Notes Friday, September 2, 2016.
Created for CVCA Physics By Dick Heckathorn 2 June 2K + 5
First, just take a mountain trail stroll in China
Antiproton decelerator
OT Survey & Adjustment Outline: Survey technique at present
Drawing Bohr Models.
8-1 Volume of Prisms & Cylinders
SuperB Integration Summary of previous integration sessions.
Groups and Periods.
Rack Placement Chopper Workshop
Presentation transcript:

Question & Suggestions March 17th The tanks can be positioned as indicated on the drawing. Where the auto fill cryogenics and electronics will be located? Strongly recommended to put them on the holding structure. (3 x 19’’ carets 40 cm in depth) No bridged walking path. Should the digitizer racks, beam left be rotated by 90 deg, parallel to the beam direction. Should the digitizers racks be set on rails? The optical cables to the digitizers to be on bridges on both sides? Where the water cooling pipes are located? Where the low power crates should be located and where the corresponding cables to the detectors go? Is the installation of the detectors simulated in the current lay out?

Question & Suggestions March 17th The tanks can be positioned as indicated on the drawing