Status, Misc Elton Smith Feb 21, 2003.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

Elton S. Smith University of Virginia October 25, Overview Bremsstrahlung Tagging Spectrometer and Photon Beam Review Elton S. Smith Jefferson Lab.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
Experiment HUGS 2011 – Jefferson Laboratory Hussein Al Ghoul Department Of Physics Florida State University ᵠ.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Collaboration Meeting Alex Dzierba Indiana U March 16-17, 2001 at JLab 1.Progress since our last meeting 2.NSAC Issues 3.Preparing the Conceptual Design.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1. Progress Report Science of Confinement The spectroscopy of light mesons led to the quark model and QCD: mesons are quark-antiquark color singlet.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Networks Physical Infrastructure Rick Finnegan April 22, 2008.
Project Charter 1.Overview / Background Section 2.Governance / Authority Section 3.Approach Section.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
Muon Ionisation Cooling Experiment Overview
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Work Breakdown Structure
Detector for GlueX JLab PAC 23 Jan 20, 2003 Beamline Hall D GlueX
MICE CM31 Schedule summary
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
Francesco Forti University and INFN, Pisa
SmartMeterTM Steering Committee Update – September 2012
Preparations for a Lehman Review
The 12 GeV Jlab Upgrade Project
Amendment Invoice Task Force Progress Report
TRD Data Analytics-GRT Planning & Implementation Request
Scope Management Chapter 5
Preparation of the CLAS12 First Experiment Status and Time-Line
ctclink Steering Committee

SmartMeterTM Steering Committee Update – March 2013
SmartMeterTM Steering Committee Update – June 2012
Amendment Invoice Task Force Progress Report
Mark McKinnon EVLA Project Manager
SmartMeterTM Steering Committee Update – July 2012
ESS Project Status Roland Garoby – Technical Director August 2018.
SmartMeterTM Steering Committee Update – February 2013
SmartMeterTM Steering Committee Update – November 2012
Amendment Invoice Task Force Progress Report
SOLID Collaboration Meeting
Scope Management Chapter 5
MPUMALANGA 4TH QUARTER EIG PERFOMANCE
Conventional Facilities
Current Status for Ion Polarization Studies

Current Status of Ion Polarization Studies
Presentation transcript:

Status, Misc Elton Smith Feb 21, 2003

Contract Status CMU: Waiting for final invoice for one of the two contracts IU: Waiting for signature on mod and final invoice of TOF contract U Regina: All contracts should be closed by the end of this month FIU: scint contract extended until May Take over R&D for fiber detector (buy cryostat, cassettes from Fermi, needs some electronics)

Budget Summary Item Request (Sep 02) Status Robotics and Electronics 255 180 Data Acquisition and Trigger 40 5 Computing 75 Solenoid Refurbishment 200 25 Diamond R&D 65 Lead Glass Calorimeter 135 Barrel Calorimeter Module 265 Upstream Veto 15 Tracking 60 10 Cerenkov Counter Civil 150 Designer Total 1365 550

Change Requests for G0 Experiment Cost Schedule Performance Approval 1 Minor, within WBS line item (<$5K or 1%) “float” No impact Subsystem manager 2 Within subsystem contingency allocation (>$5k or 1%) < 1 Quarter delay of milestone Sub-system change not affecting subsystem performance or scope Above plus Project manager and Spokesperson 3 Within overall G0 contingency (>$100k or 10%) > 1 Quarter delay of milestone Subsystem change affecting subsystem performance but not G0 performance Above plus L. Cardman and Executive Committee 4 > 1 Quarter delay of major project milestone Technical scope change, affects experiment capability Above plus Agencies

PAC23 comments/suggestions Use of polarized targets Inclusion of 4He and 3He targets with capabilities of detection the recoiling nucleus. simplification in PWA due to the spin zero of the 4He target reduce production of baryon resonances Develop case for study of glueballs Detection of e+e- pairs (e.g. study of J/Ψ)

Work Breakdown Structure 1.1 CDR 1.2 R&D 1.3 Accelerator 1.4 Hall Upgrades 1.4.1 Hall A 1.4.2 Hall B 1.4.3 Hall C 1.5 Hall D 1.5.1 Solenoid 1.5.2 Detectors 1.5.3 Computing 1.5.4 Electronics 1.5.5 Beamline 1.5.6 Infrastructure 1.6 Civil 1.6.3