Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don 888-627-5563 See Floor Plan and Specifications.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Exterior Window and Door Frames
Common Components of a Traditional Wood Framed Building
Windows 18 Windows and Doors
Chapter 18 Windows and Doors.
Doors Wood Framed Doors.
FVCC Fire Rescue Forcible Entry.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Chapter 24 Finish Ceilings & Floors
WOOD LIGHT FRAME CONSTRUCTION
Objectives of Elemental Estimation 1.To reveal the distribution of costs among the constituent element of the project. 2.To relate the cost of any constituent.
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
$18, Salem - 29BHBS SE -Travel Trailer.
Civil Engineering & Architecture 2.3 Residential Design.
Division 08-Openings ARCH 330 Fall Master Format OPENINGS Operation and Maintenance of Openings Schedules for Openings
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Renovation Update Meeting: November 11, Phasing Plan: Currently working in Phase 5, Façade 6, and Crystal Palace.
Structural Insulated Panel System Chapter 15. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Chapter 4: Air Leakage Control: Materials and Techniques
FRP Door and Frame System. FRP Door and Frame System What is FRP? Tie rod assembly Aluminum closer reinforcement (same for panic/lock reinforcement) Aluminum.
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
King James Cost Estimation
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Introduction of the Building Sector in DPR Korea 9 th March, 2008.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Insulation and Infiltration
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Towson University Construction & Professional Development Introduction –Ryan’s history from high school to present day. What is Modular Construction? What.
Finishing the Building
Common Components of a Traditional Wood Framed Building
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Wall Framing Grimsby Secondary School Technology Dept.
HI Construction. Starting Out Building standards are set by: 1)State Agency 2)Federal Agency 3)Local Agency.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
 Overview of Interior Finishes  Types  Examples.
Fire-Resistant Materials & Assemblies Part 2 Chapter 5.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
APPLICATIONS OF TECHNOLOGY
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
CONSTRUCTION Housing
Common Components of a Traditional Wood Framed Building
Children’s Section of the Library Entrance lobby from Main Street looking east.
Common Components of a Traditional Wood Framed Building
APPLICATIONS OF TECHNOLOGY
Introducing the Dakota 28483D
Major Steps In Building a SFR
* 07/16/96 Site Development Plan * ##.
CONSTRUCTION Housing
Common Components of a Traditional Wood Framed Building
New White Lake Township Library
CONSTRUCTION Housing
Common Components of a Traditional Wood Framed Building
© OnCourse Learning.
FARR’S BUILDING APARTMENTS
Common Components of a Traditional Wood Framed Building
Building construction and Gear
The Edge Extreme Makeover.
Presentation transcript:

Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications next two slides.

GENERAL SPECIFICATIONS - CALL DON EISMAN AT FOR COMPLETE INFORMATION, PRICING AND STATE SEALS AVALIBLE. Frame: Perimeter Type with detachable hitch and axles. Wall and floor framing: Wood with 2 x 6 walls. Roof Framing: Trusses to support 40# Live Load. Insulation: R-19 floor, R-19 walls, R-38 roof. Floor: 1/8 vinyl composition tile over plywood. Walls: Painted Gypsum. Roof:.045 E.P.D.M. membrane over sheathing. Exterior siding and Mansard: Steel Rib Type. Ceiling System: Suspended grid type with fissured design and 2 x 4 pattern. Exterior Doors: Glass and aluminum main entrance. Steel rear exit. Interior Doors: Legacy oak Solid core with steel jambs. Windows: Insulated glass, aluminum storefront type. Electrical: 200 AMP single phase. Raceway: EMT conduit. Lights: Diffused lay in type plus egress and emergency illuminating. Devices: Hospital grade. Rough In junction boxes included for fire alarm and smoke detectors. Plumbing: Fixtures per floor plan. Copper supply lines. PVC waste lines. HVAC: Roof mounted system shipped loose for field installation. Ductwork: Designed Fiberglass. Base Cabinets: Merrilat with high pressure plastic laminate tops.