Tam Valley School Modernization - Phase 1 Summer 2011.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Strawberry Point School Modernization Summer 2012.
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Revitalization Plan. Revitalization Plan Goals Increase homeowner value by continuing to Invest in both infrastructure and curb appeal.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Mill Valley Middle School Modernization Summer 2011.
Capital Projects Investments Levy Cycle Tom O’Brien – Facilities & Operations Director February 17, 2015.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
May 6, 2010 Irvine Unified School District HMC Architects.
Construction Update September 2014 Madison Elementary School District.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
LOCAL ASSISTANCE 5 – YEAR PLAN Facilities Department Mark Thissell.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Maintenance and Operations Report Summer Summer 2011 Custodial Update Budget Reductions: Reduced custodial staff by 1 full time equivalent Eliminated.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Building Description Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Riverside Community Schools Overview of Summer Maintenance Projects.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Finishing the Building
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
…….Another Man’s Treasure Vance Drive Apartments Transitional Housing.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Sinking Fund Millage Renewal Election- May 7, 2013.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
The IARC Complex Annual Upkeep Estimated Cost Window cleaningLabor costs for contractor to clean interior and exterior surfaces of glass at the OTE building.
Capital Improvement Program for September 9, 2014.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Facilities Focus Group
White Pigeon Community Schools
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Accessible Environment
2015 School Bond Construction Program
Capital Improvements Presentation
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
May 8, 2018 Bond Program.
The summer of 2018 and all the work that has taken place
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
Using Sketchup for Home Contracting
Charter Oak Unified School District
Facility Advisory Committee Meeting
Park Place Wesleyan Gala 2019
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

Tam Valley School Modernization - Phase 1 Summer 2011

Tam Valley Bond Election Project List Safety and Communication Replace outdated fire alarm system Replace outdated clock, bell and paging system American Disabilities Act compliance Food service kitchen compliance Building Systems and Renovation Repair or replace aging electrical system components Upgrade inefficient lighting systems including exterior lighting Upgrade computer wiring and infrastructure Repair or replace aging plumbing system components Repair or replace leaking or deteriorating roofs and skylights Paint interior and exterior of buildings Replace flooring Repair or replace windows, doors, hardware and signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Safety and Communication American Disabilities Act compliance Building Systems and Renovation Repair or replace signage Site Improvements Construct solar ready covered outdoor eating area Restore or resurface deteriorating concrete or blacktop Reconfigure parking lot to improve fire access and traffic flow Upgrade aging electrical and plumbing utility systems Tam Valley Phase 2 - Summer 2012 Project List

Before After Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, parking lot, playground striping

Windows, paint, roof, doors, lights, gutter, landscape, retaining walls, electrical service, remove one level of sun screen, maintenance path and asphalt Before After

Windows, paint, roof, doors, lights, gutter, landscape, ramp, server room HVAC, water fountain and railings Before After

Windows, paint, roof, doors, lights, gutter, landscape, and landings Before After 1960s Addition with storefront

Windows, paint, roof, doors, lights, gutter, and remove one level of sun screen Before After

Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, remove storage shed, new landings at doors Before After

Windows, paint, roof, doors, lights, gutter, remove one level of sun screen, ramp, railings, new landings at doors Before After

Windows, paint, lights, asphalt, and ramp surfaces Before After

Windows, paint, roof, doors, lights, gutter, ramp and railings Before After

Windows, paint, roof, doors, lights, and gutter Before After

Windows, paint, roof, doors, lights, gutter, landing at door Before After 1960s Addition with storefront

Windows, paint, roof, doors, lights, and gutter Before After

Paint, abrasive action floor covering, and non-wax floor covering Before After

Paint, abrasive action floor covering, new double door into MPR BeforeAfter

Paint, abrasive action floor covering, and non-wax floor covering Before After

Paint, non-wax floor covering, cubbies protector to assist seeing impaired Before After

Windows, door, paint, abrasive action floor covering, and non-wax floor covering Before After

Paint, abrasive action floor covering, and non-wax floor covering Before After

Windows, paint, doors, motorized blinds, new fire alarm speaker and bell systems Before After

New clock and bell system, wireless access points, and wall mounted short throw projectors Before After

Operable windows, ceiling paint, motorized shades, and touch up paint to cabinets Before After Non operable windows

Removed all wall mounted televisions and replaced with short throw projectors Before After Wall mounted televisions

Replaced all slipper rugs with abrasive actions carpets Before After

Phase 1 - windows, paint, roof, doors, gutter, and landings at doors. Phase 2 in summer 2012 will have a new walkway and ramps Before After

Phase 1 - windows, paint, roof, doors, gutter, and landings at doors, new bell system. Phase 2 in summer 2012 will have a new walkway and ramps BeforeAfter

Moved ball walls, slurry seal and restriped blacktop Before After

Paint, roof, doors, lights, gutter, landscape, larger landing under lunch table Before After

Windows, paint, roof, doors, lights, gutter, slurry seal and striping Before After

Paint, lights, ramp surfaces, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

Paint, lights, roofs, remove railing, new landing, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

Paint, lights, water fountain, railing, roofs, gutter, new fire alarm, clock and speaker systems, slurry seal and restriping blacktop Before After

Roof, operable skylights, and venting with curb detail Before After

Replace all scuppers with gutters, all gutters have screen covers Before After Scuppers

All new roofs on main building and modular wing Before After Patched roofs

New heater unit and ducts at Admin offices Before After

New roof, new windows, and new conduit for data, fire, bell and electrical upgrades Before After

Phase 1 - Paint, lights, door hardware. Phase 2 summer 2012, landscape changes BeforeAfter

Phase 1 - Remove dumpster enclosure, and new sidewalk. Phase 2 - Parking lot renovation Before After

Windows, paint, roof, doors, lights, gutter, landscape, ramp, stairs, and railings Before After

Phase 2 – Summer 2012 Phase 1 – Summer 2011