1 Strawberry Point School Modernization Summer 2012

2 New entry, landscape, trench drain, and playground striping Before After Landscape and playground striping

3 New ducts, paint, and playground striping Before After Leaking roof top ducts, playground striping

4 Raised tree canopy for better site lines, new waiting area, new entry gate, new waiting area for pick up Before After Entry gate, and landscape

5 New light poles, entry portico, locking gates, new flagpole, new paint, new display board, new sidewalk Before After Main entry, rolling gate, flagpole

6 New paving and paint Before After Decomposed granite

7 New portico, paving, fence, locking gate, and flagpole Before After Main entry

8 New paint, paving, fence, locking gate, and portico Before After Entry

9 New integrated entry matts, new paint interior and exterior Before After Entry matts

10 New playground striping, paint, flagpole and entry Before After Playground, and entry

11 Raised tree canopy, expanded planter area, new black top patching, new playground striping Before After Landscape and blacktop

12 New covered walkway, new paint, new playground striping Before After Classrooms, playground striping

13 New mechanical venting, new lighted exit signage Before After Passive venting in hallway

14 New carpet with abrasive action inserts at entry doors Before After Portable classrooms carpet

15 New carpet with rubber transition strips Before After Old carpet and metal transition strips

16 New paint, and cubbies Before After Coat hooks

17 Sheet metal flashing to have continuous rain protection at portable classrooms Before After Gaps between overhangs at portables\

18 New covered walkway, railings, and paint Before After Walkway from main building to portable classrooms

19 New covered walkway, ADA compliant water fountain and paint Before After Walkway from main building to portable classrooms and restrooms

20 New fence, gate and paint Before After Kindergarten area

21 New paint, fence, asphalt, playground striping, walkways and sandbox Before After Kindergarten play area

22 New paint, fence, asphalt, playground striping, walkways and sandbox Before After Windows, Paint, Roof, Doors, Lights, Gutter, Landscape, Ramp, Stairs, RailingsKindergarten play area

23 Converted to new custodial closet Before After Closet

24 New tiles Before After Water damaged ceiling tiles

25 New projector, screen, speakers, and clock Before After Typical classroom