Rexam Medical Packaging

Slides:



Advertisements
Similar presentations
Projects with Industry WVU Tech Sponsored by Energy Efficiency Program WV Division of Energy.
Advertisements

1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Fuel Cell Modeling Team Members: Albert Wong Faculty Advisor: Dr. Blekhman Department of Computer Science and Technology College of Engineering, Computer.
Transportation Services Annual Sustainability Update 06’-07’
1 San Jose State University Department of Electrical Engineering EE 166 Project Spring 2003 Phase Frequency Detector (PFD) Prof. David Parent Group Members:Marcella.
ELECTRONIC CAMSHAFT TEAM Senior Design Project 2006 Group Members: Scott Beauchemin Adam Hingorany Alex Abdou Colin McCormack Group Advisors: Professor.
Design Team #3 Work Order Tool with Voice Recognition Hai Bui Harry Himawan Chris Phillips.
Department of Electrical Engineering Thesis Proposal Title Students Name Registration No. Supervisor Name.
Aditya Pipersenia (Project Manager) Deepak Sebastian (Language Guru) Krishnan Rajeswar (System Integrator) Raymond Barker (System Architect) Rohit Ramesh.
Simple Machines. Simple machines: Reduce the effort (force multiplier)
2008 COST BENEFIT ANALYSIS Town of Loxahatchee Groves.
Return to Work Programs Frequently Asked Questions.
By June 2016, student attendance will increase from a current 77% to 85% based on PowerSchool data. Goal Manager – Robert Escamilla Key Process Manager.
Reducing Rehab Waiting Times A/Prof Stephen Wilson Royal North Shore Hospital.
TelCal Phasing Engine description Draft Robert Lucas
1 RoboComm: Rule-Based Scheduling for Communication Systems CSCI Research Project and Seminar Team #7 Instructor: Dr. Kwok-Bun Yue Mentor: Mr. Dilhar.
UW Hospital – Rehab Department February 15, 2000.
Exploring options. Out sourcing It is a process when you hire outside services to take part on to your project  Need more production  Speed up work.
Alison Gardner / Engineering Real Change EAUC Conference: 6 December 2006
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Communication and Organization Mythical Man Month CH. 6-7 Gabriel Douglas Mythical Man Month CH. 6-7 Gabriel Douglas.
Application for Morphological Image Processing Dan Campbell 12/13/06 University of Wisconsin – Madison Departments of Computer Engineering and Computer.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Indistar® Beginning the Process: The first few steps.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
PROJECT CYCLE MANAGEMENT Reporting. Management Management Unit Establish policy and strategy Steer project direction Minimize risks & fill gaps Coordinate.
Search and Rescue Team Status Nineteen members 6 SAR Tech Certified – 8 in Process 4 Call outs in 6 weeks  Member response 1 – 6 team members Monthly.
3D LED Cube Team Members: Angel Perez and Robert Regojo.
Overcrowding in the Workplace Recommendation Report: Remote Working.
Contact Us.
Windmill Energy Production
Fan Assembly Driven by Magnetic Fields
Instructions This is your story board. Using this template is optional. If you do choose to use this template, feel free to change font size, color,
UTILITIES MANAGEMENT.
Return on Investment of the Recruiting Process
Return on Investment of the Recruiting Process
Seminar On Energy Audit Submitted To: Submitted By:
Western Michigan University Central Power Plant
Design of Operations.
AASHTO Subcommittee on Construction Contract Administration Section
Thesis Proposal Title Student Name Registration No. Supervisor Name
Manik Bali and Lori Brown Annual Meeting Madison, Wisconsin
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Capacity Planning.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses

How can I Create a Contact Group in Windows Live Mail?
Authors/Collaborators
COLLEGE OF ENGINEERING (48-72pt)
Computation of Minimal Siphons for a Class of Generalized Petri Nets
Smarter, Better, Faster.
Thesis Proposal Title Student Name Registration No. Supervisor Name
PHF Staffing Decision Tree
Project Title This is a sample slide layout
Medications Utilities – Mass Void Medications
Authors/Collaborators
The Grip Department The Complete Guide to Film & Digital Production:
Leasing vs. Buying Computers for an Engineering Firm
Construction Engineering Department Construction Project with Resources Constraints By. M. Chelaka, D. Greenwood & E. Johansen, /9/2019.
OPERATION AQUATIC FREEDOM
University of Pittsburgh Medical Center (UPMC)
Evaluating and Improving a Manufacturing System Mock Preparation
Group Members First Names
University of Pittsburgh Medical Center (UPMC)
Firebase Vs. MongoDB: Choose the Best Database of 2019
Project Title This is a sample poster layout -
Meet Us
Contact Us
DISTRICT PRESIDENT’S INSPECTION RESPONSIBILITIES
Presentation transcript:

Rexam Medical Packaging Team Members: Robert Sitaru Leila I. Ponce de León Contact Person: Douglas G. Endres (Process Engineer - REXAM)

Objective & Measures Objective Performance Measures To improve the efficiency of the slitting department through better utilization of existing resources (machines and personnel) Performance Measures resource utilization (operators & helpers) machine output Robert Sitaru & Leila I. Ponce de León

Slitter Dept. Current Layout Robert Sitaru & Leila I. Ponce de León

Baseline Model Monthly Report: Total Production Rate = 1,217 ft/min Baseline Model: Total Production Rate = 1,222.7 ft/min (difference = 5.7 ft/min) Robert Sitaru & Leila I. Ponce de León

Baseline vs. Alternative 1 Baseline Model: Total Production Rate = 1,222.7 ft/min Alternative 1: Total Production Rate = 1,758.8 ft/min (43.8 % production gain) Robert Sitaru & Leila I. Ponce de León

Slitter Dept. Proposed Layout Robert Sitaru & Leila I. Ponce de León

Baseline vs. Alternative 2 Baseline Model: Total Production Rate = 1,222.7 ft/min Alternative 2: Total Production Rate = 1,202.9 ft/min Robert Sitaru & Leila I. Ponce de León

Conclusions Alternative 1 difficult to implement due to speed limitations imposed to the slitters. Alternative 2 is the best option: Add a general helper (floater). Each helper will attend two neighboring slitters. Have the extra helper start production on Slitter 32/38 or relocated in another area. Robert Sitaru & Leila I. Ponce de León