Loft Conversions - The building regulations Chris Wigley MD London Building Control Ltd www.londonbuildingcontrol.co.uk.

Slides:



Advertisements
Similar presentations
Doors and Windows.
Advertisements

DOORS AND WINDOWS.
Building Safety and Accommodation Requirements u Compliance with safety and health standards under the Buildings Ordinance u Enlisting the service of.
THE HIGHLAND COUNCIL BUILDING STANDARDS SERVICE
Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
Stairs, Windows, Doors, and Roofs
Ensuring Fire Compliance An Action Plan Clive Reilly Checkmate Fire Solutions.
DESIGN OF A HOUSE A Presentation by: Ar. Anuja Gopal
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. INTRODUCTION HOW DOES A CONTAINER BECOME HOUSE? DESIGN EXAMPLES A NEW HOME IN 12 STEPS TECHNICAL SPECIFICATIONS.
Fire-Resistive Construction (2nd part)
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
Lesson 7. Major factors which affect pricing of doors  Frames  Doors  Hardware.
Timber Framed Structures
Julian Vollans – The Noberne Group September 20 th 2012 DOORSETS + 3 RD PARTY ACCREDITATION = THE SAFE SOLUTION.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Housing Policy – Meeting the needs of all of the community. Michael Kirby Chief Planning Officer Lancashire County Council.
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Part B – Fire Safety Technical Seminar by Sussex Building Control West Sussex Fire & Rescue Service.
ACCESSIBILITY: A CODE COMPLIANCE AND EXISTING CONDITIONS ASSESSMENT AND SURVEY OF THE LIMERICK TOWN HALL MAIN STREET LIMERICK, ME ttl-Architects LLC 28.
STAIRCASE.
IRC 2009 Habitable Attics.
Pre-qualification Structural Learning – Brief Introduction to MOE, FRC & MOA 29 March 2003 Aims  Recall your memory : how to review your scheme according.
Dan Donovan Liverpool City Council A brief presentation on fire safety in residential housing East Midlands Housing Seminar 4th November 2010.
HEAT LOSS If the conservatory is not heated from the main heating system or it has an external quality door fitted i.e. double glazed patio or similar.
Amendment to GPDO Householder Permitted Development.
FIRE DETECTION FOR DWELLINGS A Short History of Developments in the Use of Smoke Alarms in the UK, Related to Ongoing European Developments Jason Perrins.
“People feel better in Colt conditions” | “People feel better in Colt conditions” | Colt International Ltd Smoke curtains.
Retirement Home Regulated under the Retirement Home Act, 2010.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
Julian Vollans DipFD – Noberne Doors Ltd 26 th March 2013 FIRE DOORSETS & 3 RD PARTY ACCREDITATION.
BUILDING CODE OF AUSTRALIA POLICY Bruce Howie September 2010.
DOORS AND WINDOWS.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Building Codes and Interior Design
Fire Safety For IOSH North of Scotland Branch Nick Broom.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
Hunter McWhorter Mark Menard Steven Hammock. Inspectors never fail to check the required emergency-egress window from a sleeping room. At least one window.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Neil Cooper Fire Safety Residential Implementing the Changes.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Title The Future of Fire Risk Management Practical Fire Risk Assessment & the Future.
Remember Have a working smoke alarm Part 4. James, Jessica, Big Dragon and Tiny Dragon are playing in the bedroom.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
Call us : / AMAATRA HOMES NOIDA EXTENSION.
Amendments to the Town and Country Planning (General Permitted Development) Order 2008.
Fire Door Constructions. About Noberne Doors Ltd o John Wilson – Sales Manager for Noberne Doors Ltd o Noberne Doors Ltd –Manufacture bespoke High Performance.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Building Construction
Repairing Standard Scottish Government Guidance PROVISION FOR DETECTING AND WARNING OF FIRES.
Dream Flower Akademia – Flats in Cochin. Floor Plans.
New Energy Centre at Megawatt Park 15 April 2014.
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION..
Fire Safety in Healthcare Services Conference
BOMBA BRIEFING QUESTIONAIRE FOR 30 AUGUST 2017
Fire Resistance Questions
CEN 180: Civil Engineering Drawing II
Architectural Design Styles of Houses.
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Compliance & fire stopping – where it ends in a Community dwelling
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
INFORMATION ABOUT: EUROPEAN FIRE CLASSIFICATION.
Building standards Mr. Da Silva.
LIFT,ESCALATOR AND MOVING WALKS
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
Presentation transcript:

Loft Conversions - The building regulations Chris Wigley MD London Building Control Ltd

Scheme 1: Bungalow with Loft Conversion

Option 1A: Means of escape from first floor windows Option 1A: Means of escape from first floor windows Means of escape windows to all first floor habitable rooms (minimum 450mm wide, with opening of 0.33m2) Means of escape windows to all first floor habitable rooms (minimum 450mm wide, with opening of 0.33m2) Interlinked mains SD to halls/landings Interlinked mains SD to halls/landings Option 1B: Protected route Option 1B: Protected route with enclosed staircase leading to final exit with enclosed staircase leading to final exit FD20 doorsets to habitable rooms including kitchens and rooms with boilers FD20 doorsets to habitable rooms including kitchens and rooms with boilers Interlinked mains SD to halls/landings Interlinked mains SD to halls/landings

Scheme 2: Two Storey house with Loft Conversion

Option 2A: A protected route Option 2A: A protected route with enclosed staircase leading to final exit with enclosed staircase leading to final exit FD20 doorsets to habitable rooms including kitchens and rooms with boilers FD20 doorsets to habitable rooms including kitchens and rooms with boilers Interlinked mains SD to halls/landings Interlinked mains SD to halls/landings Two Storey house with Loft Conversion (Lounge open to stairs) Two Storey house with Loft Conversion (Lounge open to stairs) As Option 2A: Re-instate a protected route As Option 2A: Re-instate a protected route Form route using 30 minute FR construction (FD20 doorsets) or fire-curtains Form route using 30 minute FR construction (FD20 doorsets) or fire-curtains Option 2B: Sprinklers Option 2B: Sprinklers Sprinklers to Ground Floor rooms Sprinklers to Ground Floor rooms FD20 doorsets/construction to separate the Ground Floor from the First Floor FD20 doorsets/construction to separate the Ground Floor from the First Floor MOE from a First Floor room to a place of safety MOE from a First Floor room to a place of safety First Floor doors to be FD20 or upgraded using envirograf or similar First Floor doors to be FD20 or upgraded using envirograf or similar New doors to the loft to be FD20 New doors to the loft to be FD20

Scheme 3: Three Storey house with Loft Conversion

Option 3A: Protected route and smoke detection throughout Option 3A: Protected route and smoke detection throughout Protected route to final exit Protected route to final exit FD20 doorsets throughout FD20 doorsets throughout SD throughout (HD in kitchen) SD throughout (HD in kitchen) No open plan arrangements allowed No open plan arrangements allowed

Scheme 4: Two Storey building (flats) with Loft Conversion Option 4A: Independent access Option 4A: Independent access Treat as Two Storey house with Loft Conversion (Scheme A) Treat as Two Storey house with Loft Conversion (Scheme A) Option 4B: Creation of maisonette Option 4B: Creation of maisonette Protected internal stairs to a flat exit Protected internal stairs to a flat exit FD20 doorsets throughout FD20 doorsets throughout SD throughout (HD in kitchen) SD throughout (HD in kitchen)

Scheme 5: Three Storey building (flats) with Loft Conversion Option 5A: Independent access Option 5A: Independent access Treat as Three Storey house with Loft Conversion (Scheme C) Treat as Three Storey house with Loft Conversion (Scheme C) Option 5B: Creation of maisonette at a high level (over 7.5m above Ground Level) Option 5B: Creation of maisonette at a high level (over 7.5m above Ground Level) Protected internal stairs to a flat exit Protected internal stairs to a flat exit SD & FD20 doorsets throughout SD & FD20 doorsets throughout Secondary escape route/stairs required, or a fire engineered solution Secondary escape route/stairs required, or a fire engineered solution

Guidance based upon LABC Technical Guidance Note This guidance is intended for two storey houses that are converted to form 3 storeys. The new 3rd storey floor area should not exceed 50m². Existing hardboard or other lightweight (hollow-core) doors are not considered adequate to provide a reasonable level of fire protection to a stair enclosure and should therefore be replaced with FD 20 doors.

Option 1: Upgrading existing doors (minimum 32mm thick) Detection throughout: smoke detectors should be provided in all habitable rooms, at every storey level (including any half landing levels adjacent to habitable rooms) with a HD in the kitchen. All alarms should be mains powered with battery backup, and interlinked. BS 5839:6 recommends optical detectors in circulation areas with ionization detectors for living/dining rooms. Either type is acceptable in bedrooms. Detection throughout: smoke detectors should be provided in all habitable rooms, at every storey level (including any half landing levels adjacent to habitable rooms) with a HD in the kitchen. All alarms should be mains powered with battery backup, and interlinked. BS 5839:6 recommends optical detectors in circulation areas with ionization detectors for living/dining rooms. Either type is acceptable in bedrooms. There should be at least one window at first floor level of a size that would permit emergency egress to either a rear garden of sufficient depth (i.e. at least as deep as the rear elevation s height) or from the front elevation, leading to a place of safety (i.e. not over light wells) There should be at least one window at first floor level of a size that would permit emergency egress to either a rear garden of sufficient depth (i.e. at least as deep as the rear elevation s height) or from the front elevation, leading to a place of safety (i.e. not over light wells) The door should be attached to the door frame with steel hinges, not be visibly warped, fit well into its frame and there should be no visible defects particularly in the panels. The door should be attached to the door frame with steel hinges, not be visibly warped, fit well into its frame and there should be no visible defects particularly in the panels. Any existing glazing to doors or fanlights should be replaced by wired glass or similar fire resistant glazing to provide adequate resistance for integrity and stability. Any existing glazing to doors or fanlights should be replaced by wired glass or similar fire resistant glazing to provide adequate resistance for integrity and stability. There should be no significant defects to adjacent walls or around door ­ frames forming the stair enclosure. There should be no significant defects to adjacent walls or around door ­ frames forming the stair enclosure.

Option 2: Upgrading existing doors (less than 32mm thick) Detection throughout: smoke detectors should be provided in all habitable rooms, at every storey level (including any half landing levels adjacent to habitable rooms) with a HD in the kitchen. All alarms should be mains powered with battery backup, and interlinked. BS 5839:6 recommends optical detectors in circulation areas with ionization detectors for living/dining rooms. Either type is acceptable in bedrooms. Detection throughout: smoke detectors should be provided in all habitable rooms, at every storey level (including any half landing levels adjacent to habitable rooms) with a HD in the kitchen. All alarms should be mains powered with battery backup, and interlinked. BS 5839:6 recommends optical detectors in circulation areas with ionization detectors for living/dining rooms. Either type is acceptable in bedrooms. There should be at least one window at first floor level of a size that would permit emergency egress to either a rear garden of sufficient depth (i.e. at least as deep as the rear elevation s height) or from the front elevation, leading to a place of safety (i.e. not over light wells) There should be at least one window at first floor level of a size that would permit emergency egress to either a rear garden of sufficient depth (i.e. at least as deep as the rear elevation s height) or from the front elevation, leading to a place of safety (i.e. not over light wells) The door should be attached to the door frame with steel hinges, not be visibly warped, fit well into its frame and there should be no visible defects particularly in the panels. The door should be attached to the door frame with steel hinges, not be visibly warped, fit well into its frame and there should be no visible defects particularly in the panels. Any existing glazing to doors or fanlights should be replaced by wired glass or similar fire resistant glazing to provide adequate resistance for integrity and stability. Any existing glazing to doors or fanlights should be replaced by wired glass or similar fire resistant glazing to provide adequate resistance for integrity and stability. There should be no significant defects to adjacent walls or around door ­frames forming the stair enclosure. There should be no significant defects to adjacent walls or around door ­frames forming the stair enclosure. A proprietary solution should be sought to upgrade the door; this may include the application of fire resistant materials to the panels and stiles on the room side of the door. Such doors can be provided with a certificate from a specialist supplier confirming their upgraded suitability. A proprietary solution should be sought to upgrade the door; this may include the application of fire resistant materials to the panels and stiles on the room side of the door. Such doors can be provided with a certificate from a specialist supplier confirming their upgraded suitability. Alternatively the door can be upgraded, on the room side, by infilling the panel with a fire resistant board and applying a similar board glued and screwed over the entire door. Alternatively the door can be upgraded, on the room side, by infilling the panel with a fire resistant board and applying a similar board glued and screwed over the entire door.

General Notes for all Options G1).Smoke Detectors can use a wireless link (if certification is provided). G1).Smoke Detectors can use a wireless link (if certification is provided). G2).FD20 doorsets (not FD30 doors) are usually required in Loft Conversions; smoke seals are not required. Intumescent strips are also not usually required as fire doors are manufactured to provide 20 minutes FR without these strips -intumescent strips are used to increase FR to 30 minutes, when this is required. 50mm thick doorstops are also not usually required within dwellings as it is now accepted practice to allow smoke to seep out and set off the detectors in the halls/landings. G2).FD20 doorsets (not FD30 doors) are usually required in Loft Conversions; smoke seals are not required. Intumescent strips are also not usually required as fire doors are manufactured to provide 20 minutes FR without these strips -intumescent strips are used to increase FR to 30 minutes, when this is required. 50mm thick doorstops are also not usually required within dwellings as it is now accepted practice to allow smoke to seep out and set off the detectors in the halls/landings. G3).In a house, the top floor may have an open plan arrangement (ie. no door onto the stairs). However this is not permitted in maisonettes (where an inner protected hall is needed). G3).In a house, the top floor may have an open plan arrangement (ie. no door onto the stairs). However this is not permitted in maisonettes (where an inner protected hall is needed). G4).Each scheme will need an individual survey to ensure there are no unusual site conditions. G4).Each scheme will need an individual survey to ensure there are no unusual site conditions. G5).Steels supporting floors/walls will need 30 minutes FR. Protection from the underside is sufficient; the plasterboard needs to be at least 12.5mm thick fireline board or similar – otherwise steels can be painted with intumescent paint. G5).Steels supporting floors/walls will need 30 minutes FR. Protection from the underside is sufficient; the plasterboard needs to be at least 12.5mm thick fireline board or similar – otherwise steels can be painted with intumescent paint. G6).Where an older house/flat has low headroom, the new Loft Room floor may be under 4.5m above the adjacent Ground Level. The provision then is only for SD s in halls/landings and an adequate MOE window from each new habitable room. G6).Where an older house/flat has low headroom, the new Loft Room floor may be under 4.5m above the adjacent Ground Level. The provision then is only for SD s in halls/landings and an adequate MOE window from each new habitable room.

Thank you from London Building Control ….. a new approach to Building Control