Presented By: Bill Winslow Program Manager, Bernards Presented to the Citizens Oversight Committee November 29, 2011 Presented by Bill Winslow Program.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
/ /17 32/ / /
Reflection nurulquran.com.
Worksheets.
Addition and Subtraction Equations
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
Summative Math Test Algebra (28%) Geometry (29%)
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District December 2, 2008 EDUCATE ENGAGE.
HUGHES STADIUM ANALYSIS
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 20, 2009 EDUCATE ENGAGE EMPOWER 1.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Student Center Project Manifesting a Vibrant Learning and Campus Life Experience.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
SUNY Fredonia Summer 2014 Projects
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
Blissfield Community Schools Strategic Plan Facilities Team.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
VOORBLAD.
Town Hall September 9, 2010 Welcome I. Fall 2010 Overview II. Construction Projects III. Building for Tomorrow.
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
Back To School 2012/13 Parent Advisory September 18, 2012 September 18, 2012.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Equal or Not. Equal or Not
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Construction Update September 2014 Madison Elementary School District.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 19, 2009 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
May 10, 2010 Citizens’ Oversight Committee Presentation to the Presented By: Bill Winslow Bernards’ Program Manager.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
November 4, 2010 Citizens’ Oversight Committee Presentation to the Presented By: Bill Winslow Program Manager, Bernards.
Facilities Improvements and Bond Construction Update Facilities Advisory Committee Long Beach Community College District Septmeber 24, 2009 EDUCATE  ENGAGE.
October 26, 2009 Citizens’ Oversight Committee Presentation to the Presented By: Kelvin Okino Bernards’ Program Director.
1 Fall Convocation Presented by Henry D. Shannon, Ph.D August 11,
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
Agriculture and Industrial Technology Complex Capital Planning and Development Project Highlight.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Ventura Community College District
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Capital Outlay Workshop
Presentation transcript:

Presented By: Bill Winslow Program Manager, Bernards Presented to the Citizens Oversight Committee November 29, 2011 Presented by Bill Winslow Program Manager, Bernards The Measure L Construction Program

Summary Completed Projects Chino Campus Fontana Campus Rancho Cucamonga Campus Schedule Financials Questions An estimated 350,000 square feet of new facilities and a multitude of completed site improvement projects have made a significant contribution towards improving the physical learning environment. 2 November 29, 2011 COC Presentation

Completed Projects Renovate/Paint Auto Tech Lab Infrastructure/Campus Theme Environmental Impact Report Renovate Athletics Office Scoreboards Snack Bar Track & Field Timer Stadium Flag Pole Rad Tech Retrofit San Antonio Comm. Hosp./CNA Master Plan (Chino) Vocational Education – Phase I Wargin Hall – Phase I Visitors Restroom/ADA Access Science Complex Site work Theater Fire Alarm Bookstore Loading Dock North Parking Lot Irrigation North Parking Lot Landscaping ATL Landscaping Nature Preserve Fence Central Plant Phase IA Central Plant Phase IB College Drive Softball Field Ralph M. Lewis Center (Fontana) Wilson/College Dr.ive Intersection Marie Kane Center for Student Services/ Administration Theatre – Phase I North Parking Lot Science Complex Don Berz Excellence Building College Drive Landscaping Maintenance Yard Drainage Agricultural Demonstration Area Skills Road Extension Fire Lane/Science Site Lighting New Marquee Physical, Health, and Life Science Health and Life Science Re-Roof Main Instructional Building (Chino) New Elevator Tower Parking Lot 12 Health Sciences Bldg. (Chino) Community Center Bldg. (Chino) Library Lawn Landscaping (Fontana) Physical Science Complex Roof Replacement Language Arts/Social Science Energy Project Parking Lot Upgrades (Fontana) Chino Health Science Parking Lot Data and Telecom Cabling Sports Center Visual and Performing Arts Complex Landscape Addition Math Success Center & Physical Science Renovations Physical Education Facility Gymnasium Renovation Aviary Landscape Central Plant Build Out – Phase 1C – Hot Water Upgrades Student Services/Administration East Doors Fire Alarm Upgrades 3 COC Presentation November 29, 2011 (Partial Listing)

District Campuses 4 COC Presentation November 29, 2011

Chino Campus Projects in Planning Library/Learning Resource Center 5 COC Presentation November 29, 2011 Future Location

Fontana Campus 6 COC Presentation November 29, 2011 Aerial View September 2011

Fontana Campus 7 COC Presentation November 29, 2011 Academic Building Projects Completed in 2011 New 30,400 sq. ft. building includes: laboratories, lecture rooms, dance/yoga room, art studio, library, and bookstore

Fontana Campus 8 COC Presentation November 29, 2011 Academic Building Projects Completed in 2011

Rancho Cucamonga Campus Aerial View September COC Presentation November 29, 2011

Rancho Cucamonga Campus Projects Under Construction 10 COC Presentation November 29, 2011 Greenhouse Estimated Completion: December 2011 Installation of a prefabricated greenhouse structure at the Science Complex

Rancho Cucamonga Campus Projects Completed in COC Presentation November 29, 2011 Business Education Renovation Interior and exterior renovation of the existing Business Education building includes energy and accessibility upgrades

Rancho Cucamonga Campus Projects Completed in COC Presentation November 29, 2011 Michael Alexander Campus Center New 16,454 sq. ft. two-story building includes: staff and student dining rooms, coffee bar, kitchen and server, health services, student government, Extended Opportunity Programs & Services, and career services

Rancho Cucamonga Campus Projects Completed in COC Presentation November 29, 2011 Michael Alexander Campus Center

Rancho Cucamonga Campus Projects in Pre-Bid Central Plant Build Out – Phase 1C – TES Tank Installation of thermal energy storage tank and six new boilers at Central Plant Health Science Pathway Addition of a concrete pathway from Health Sciences to the Michael Alexander Campus Center North Parking Lot Drainage Addition of drainage systems at Parking Lot 4 14 COC Presentation November 29, 2011 Projects in Design Physical Education Athletics – Parking Lot and Flagpole Parking lot resurfacing and striping with new flagpole Community Trail Landscaping Landscaping and irrigation

Rancho Cucamonga Campus Projects in Planning Language/Liberal Arts and Letters Library Remodel/Expansion Wargin Hall Remodel Vocational and Student Service Support Remodel 15 COC Presentation November 29, 2011

Construction Cost Summary Completed Projects Project (valued over $1.0 Million) % Comp. Original Contract Approved Change Order Revised Contract% of CO Visual and Performing Arts Complex100%$22,145,000$2,211,142$24,356, % Community Center/Health Science Buildings (Chino) 100%$18,488,837$391,120$18,879, % Sports Center100%$8,560,543$508,104$9,068, % Academic Building (Fontana)100%$7,305,036$404,232$7,709, % Michael Alexander Campus Center100%$6,686,215$122,117$6,808, % Gym Renovation100%$4,694,000$465,507$5,159, % Business Education Renovation 100%$3,115,168$69,565$3,224, % Physical Science and Math Success Center Renovation 100%$2,988,289$175,109$3,163, % Language Arts/Social Science Energy Project 100%$2,700,000$103,828$2,803, % Parking Lot Upgrades (Fontana)100%$1,089,000$42,618$1,131, % 16 COC Presentation November 29, 2011

Summary of Funds COC Presentation 17 November 29, 2011 Fund SourceAmount Percentage of Total Original Measure L Bond$229,830, % Bond Refinance Proceeds$2,300, % Accrued Bond Interest$14,469, % Other Funds$128,412, % Total Program Funds$375,011, % Fund SourceAmount Percentage of Total Original Measure L Bond$229,830, % Bond Refinance Proceeds$2,300, % Accrued Bond Interest$14,469, % Total Measure L Bond Funds$246,599, % Program Funds (Includes Rancho Cucamonga, Fontana, and Chino Campuses) Measure L Bond Funds (Includes Rancho Cucamonga, Fontana, and Chino Campuses)

Remaining Funds COC Presentation 18 November 29, 2011 Program Funds (Includes Rancho Cucamonga, Fontana, and Chino Campuses) Measure L Bond Funds (Includes Rancho Cucamonga, Fontana, and Chino Campuses) Total Program Funds$375,011, % Committed (Expensed or Encumbered) $291,221, % Allocated to Projects$82,106, % Remaining Balance$1,683, % Total Measure L Bond Funds $246,599, % Committed (Expensed or Encumbered) $217,099, % Allocated to Projects$27,816, % Remaining Balance$1,683, %

Questions? 19