Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Chapter 7: Project Cost Management
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Earned Value Project Management: a powerful tool for software projects
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Cost Management
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Project Management Methodology Project monitoring and control.
Chapter 13: Progress and Performance Measurement and Evaluation
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
1. Earned Value Analysis (EVA) Earned value is a measure of progress enables us to assess the “percent of completeness” of a project using quantitative.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Project Cost Management
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Project Management Earned Value Management Demonstration
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management – PTM712S
Chapter 7: Project Cost Management
Performance Measurement Baseline Contract Price (Project Price)
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
Earned Value Management & Oracle Primavera P6
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
5. Cost resources & PLAN DURATION
5. Project PLAN & cost estimation
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Connoizor Enabling Performance for Businesses through Software Website: Contact: Earned Value Management - An Overview Author: Shailaja Kesary, PMP

Introduction Earned Value Management (EVM) is a technique used to track Progress and Status of a Project & forecast the likely future performance of the Project. EVM technique integrates the Scope, Schedule and Cost. Good Planning coupled with effective use of the EVM Technique will reduce a large amount of issues arising out of Schedule and Cost Overruns. EVM technique answers a lot of questions to the stakeholders in a project related to the performance of the project. EVM technique can be used to show past performance of the project, current Performance of the Project and predict the future performance of the project by use of Statistical techniques. Connoizor Enabling Performance for Businesses through Software

Basic Elements of EVM Basic elements of the EVM Technique are the Planned Value (PV), Earned Value (EV) & Actual Cost (AC). They are also referred to as Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Actual Cost of Work Performed (ACWP). All the three elements are captured on a regular basis as of a reporting date. PV or BCWS is the Cost of the Work Scheduled/Planned as of a Date. EV or BCWP is the Cost of the Work Completed/Performed as of a Date. AC or ACWP is the Actual Cost taken to Complete the Work as of a Date. Connoizor Enabling Performance for Businesses through Software

Calculation of the Basic Elements All these three basic elements can be derived from the Work Break Down Structure by associating the costs to each of the tasks. These values can be easily extracted from Scheduling Software like Microsoft Project Plan. It is too tedious to calculate these elements manually especially if the project has a lot of tasks. Our suggestion is to use the Scheduling Software to get these details. For theory on how these elements are calculated, please refer the following publications for detailed explanation. PMI Practice Standard for EVM – NASA EVM Guidelines – Wikipedia Connoizor Enabling Performance for Businesses through Software

Schedule Variance (SV) Schedule Variance can be calculated using the below formula –Schedule Variance (SV) = Earned Value (EV) – Planned Value (PV) OR –Schedule Variance (SV) = BCWP – BCWS Schedule Variance indicates how much ahead or behind schedule the project is. The formula mentioned above gives the variance in terms of Cost which will indicate how much cost of work is yet to be completed as per schedule or how much cost of work has been completed over and above the scheduled cost. Positive Variance indicates we are ahead of Schedule Negative Variance indicates we are behind Schedule Connoizor Enabling Performance for Businesses through Software

Schedule Variance % (SV %) Schedule Variance % can be calculated using the below formula. –SV % = Schedule Variance (SV) / Earned Value (EV) OR –SV % = SV / BCWP Schedule Variance % indicates how much ahead or behind schedule the project is in terms of percentage. The formula mentioned above gives the variance in terms of percentage which will indicate how much percentage of work is yet to be completed as per schedule or how much percentage of work has been completed over and above the scheduled cost. Positive Variance % indicates % ahead of Schedule Negative Variance % indicates % behind Schedule Connoizor Enabling Performance for Businesses through Software

Schedule Performance Indicator (SPI) Schedule Performance Indicator can be calculated using the below formula. –SPI = Earned Value (EV) / Planned Value (PV) OR –SPI = BCWP / BCWS Schedule Performance Indicator is an Index showing the efficiency of the Time utilized on the Project. The formula mentioned above gives the efficiency of the project team in utilizing the time allocated for the project. SPI Value above 1 indicates project team is very efficient in utilizing the time allocated to the project. SPI Value below 1 indicates project team is less efficient in utilizing the time allocated to the project. Connoizor Enabling Performance for Businesses through Software

To Complete Schedule Performance Indicator -TSPI To Complete Schedule Performance Indicator can be calculated using the below formula. –TSPI = (Total Budget – EV)/(Total Budget - PV) OR –TSPI = (Total Budget – BCWP)/(Total Budget - BCWS) To Complete Schedule Performance Indicator is an Index showing the efficiency at which the remaining Time on the Project should be Utilized. The formula mentioned above gives the efficiency at which the project team should utilize the remaining time allocated for the project. TSPI Value above 1 indicates project team can be lenient in utilizing the remaining time allocated to the project. TSPI Value below 1 indicates project team needs to work harder in utilizing the remaining time allocated to the project. Connoizor Enabling Performance for Businesses through Software

Cost Variance (CV) Cost Variance can be calculated using the below formula –Cost Variance (CV) = Earned Value (EV) – Actual Cost (AC) OR –Cost Variance (CV) = BCWP – ACWP Cost Variance indicates how much over or under budget the project is. The formula mentioned above gives the variance in terms of Cost which will indicate how less or more cost has been spent to complete the work as of date. Positive Variance indicates we are under budget Negative Variance indicates we are over budget Connoizor Enabling Performance for Businesses through Software

Cost Variance % (CV%) Cost Variance % can be calculated using the below formula. –CV % = Cost Variance (SV) / Earned Value (EV) OR –CV % = CV / BCWP Cost Variance % indicates how much over or under budget the project is in terms of percentage. The formula mentioned above gives the variance in terms of percentage which will indicate how much less or more money has been used to complete the work as planned in terms of percentage. Positive Variance % indicates % under Budget Negative Variance % indicates % over Budget Connoizor Enabling Performance for Businesses through Software

Cost Performance Indicator (CPI) Cost Performance Indicator can be calculated using the below formula. –CPI = Earned Value (EV) / Actual Cost (AC) OR –CPI = BCWP / ACWP Cost Performance Indicator is an Index showing the efficiency of the utilization of the resources on the Project. The formula mentioned above gives the efficiency of the utilization of the project resources allocated to the project. CPI Value above 1 indicates efficiency in utilizing the resources allocated to the project is good. SPI Value below 1 indicates efficiency in utilizing the resources allocated to the project is not good. Connoizor Enabling Performance for Businesses through Software

To Complete Cost Performance Indicator - TCPI To Complete Cost Performance Indicator can be calculated using the below formula. –TCPI = (Total Budget – EV)/(Total Budget - AC) OR –TCPI = (Total Budget – BCWP)/(Total Budget - ACWP) To Complete Cost Performance Indicator is an Index showing the efficiency at which the resources on the Project should be Utilized for the remainder of the Project. The formula mentioned above gives the efficiency at which the project team should be utilized for the remainder of the project. TCPI Value above 1 indicates utilization of the project team for the remainder of the project can be lenient. TCPI Value below 1 indicates utilization of the resources for the remainder of the project should be stringent. Connoizor Enabling Performance for Businesses through Software

Budget At Completion (BAC) Budget At Completion (BAC) is the Total Budget allocated to the Project. Budget At Completion (BAC) is generally plotted over time. Say like periods of reporting (Weekly, Monthly, etc). BAC is used to compute the EAC (Estimate at Completion) BAC is also used to compute the TCPI and TSPI. Connoizor Enabling Performance for Businesses through Software

Estimate To Complete (ETC) Estimate to Complete (ETC) is the Estimated Cost required to complete the remainder of the Project. Estimate to Complete (ETC) is calculated and applied when the past estimating assumptions become invalid and a need for fresh estimates arises. ETC is used to compute the EAC (Estimate at Completion) Connoizor Enabling Performance for Businesses through Software

Estimate At Completion (EAC) Estimate At Completion (BAC) is the Estimated Cost of the Project at the end of the Project. There are three methods of calculation of the EAC. –Variances are typical – This method is used when the variances at the current stage are typical and are not expected to occur in the future. –Past Estimating Assumptions are not valid – This method is used when the past estimating assumptions are not valid and fresh estimates are applied to the project. –Variances will be present in the future – This method is used when the assumption is that the current variances will be continue to be present in the future. The formula for calculation of the three methods are as below. 1.AC + (BAC - EV) 2.AC + ETC (Estimate to Complete) 3.AC + (BAC - EV) / CPI Connoizor Enabling Performance for Businesses through Software

Variance At Completion (VAC) Variance At Completion (VAC) is the Variance on the Total Budget at the end of the Project. Connoizor Enabling Performance for Businesses through Software