SKADS Controller’s Meeting Timeline Annual Financial Report

Slides:



Advertisements
Similar presentations
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
Advertisements

Key issues in project reporting Jakub Rutkowski Project Annual meeting , Hannover.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
This work is part of EQUITY ACTION which has received funding from the European Union, in the framework of the Health Programme.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EUROPEAN WORKPLACE AND ALCOHOL EWA PROJECT Main elements of coordination, administration and reporting WP1 Lidia Segura and Eva Moreno Program on Substance.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Administrative Session 15th March, 2007, Grand.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Monica Pantea, MANETPCC meeting in Groningen 2006 Time Schedule of the EURONS Annual Report End of reporting period Deadline of submission.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
INFSO-RI ETICS Periodic Review – Administrative and Financial requirements Karin Burghauser, CERN Project Admin.
Planning and Budget Process Aggrey Tisa Sabuni Under Secretary Ministry of Finance and Economic Planning Government of Southern Sudan.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Adult Education Block Grant Webinar October 23, 2015
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
INFSO-RI Enabling Grids for E-sciencE Severine Bergerot EGEE-2: Period 1 reporting instructions.
Adult Education Block Grant Webinar November 6, 2015
Monica Pantea, MANETPCC meeting in Frankfurt 2007 The annual reports 2005 and 2006.
Year 1 Progress Report & Cost Statements submitted to EC - 17 March 2004  Receipt acknowledged by EC but no other feedback  24% of total €1.8m budget.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
EURISOL DS: European Isotope Separation On-Line Radioactive Ion Beam Facility Design Study Project financial status R. Battistella, PSI June 2006.
Training for Leaders Receiving General Student Service Funds (GSSF) Part 1 Student Services Finance Committee Overview.
INTERREG III B CADSES Neighbourhood Programme Administrative and Financial Aspects of Hydrocare Project Dr. Janka Strakova Project contact.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Budget & Finance. OUTLINESOUTLINES Part 1 : The Eden project in figures Part 2 : Financial relations within the 6th FP 2 1. Roles in the financial process.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 st Consortium Management Team Meeting University of Belgrade 27 th -28 th November 2014 WP8 - Management Progress Presentation (month 1- 12) Prof. dr.
AMICI WP1 – Management, coordination and dissemination
SLHC – PP Budget April 3rd, 2008 CERN April 2, 2008 M.C.
BENCH-CAN Internal evaluation 2nd semester
Third PMC meeting University of Priština, Kosovska Mitrovica
By Lillian Irene Stormo, HiB
EC project periodic and continuous reporting
Institute of Informatics & Telecommunications
Annual Report Instructions
H2020 – Financial Reporting
Kick-off meeting of the project UMBRELLA
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Reporting 25 April 2018.
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Economic Development Department Annual Financial Statements 2011/12
IARS FINANCIAL PRESENTATION FOR
SMART & CARING GRANT APPLICATION WORKSHOP
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
Commission Regulation (EC)
HOW TO USE THE NEW GLOBAL GRANT REPORT
Financial and Administrative presentation on PARTICULATES project
European Statistical System Network on Culture (ESSnet Culture)
Reports Welcome to the Finance video on reporting.
Department of Higher Education and Training
New Special Education Teacher Webinar Series
Presentation transcript:

SKADS Controller’s Meeting Timeline Annual Financial Report Status Update 22nd March 2007

SKADS Controller Meeting SKADS Management 1st Annual Report Mid Term Review Annual Financial Report Advance Payments 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting 1ST Annual Report Progress & Activity Report contributions arrived on time Most C-forms where filled in OK Problems with requested EC contribution Problem with conversion rate boxes Some stamps were missing Report was finished and submitted in final version early September First Comments took long, approval early December Compliments to all the DS managers who did a good job in delivering the reports Consistency with mmonth and JoR was sometimes missing We had a few unstamped C-forms There was misunderstanding w.r.t. box where the requested EC contribution had to be filled in and the conversion rate boxes. 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting 1st Annual Report Conclusions SKADS performed well in the compilation of the report Review of Technical reports must be improved in view of the MTR Early discussions of “problems” with Brussels will speed up process No delivery of “best effort” report but “first-time-right’ 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting MID Term Review 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Deliverables for MTR 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Mid Term Review Management team may ask for intermediate reports w.r.t. deliverables not due prior to 1 July 2007 16 November 2018 SKADS Controller Meeting

Conclusions on Project Status All design studies and tasks are making good progress Mid Term Review is major Milestone in 2007 2nd Annual Report is required for MTR Timing of 2nd Report is crucial 16 November 2018 SKADS Controller Meeting

Financial Annual Report Req EC/ 1st Advance Payment = 80 % 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Annual Report = Some Participants do not reach 70 % !!! It is not so easy to spent a lot of money in a short period of time in a way effective to the SKADS project ESPECIALLY WHEN EC RULES APPLY!!! 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Annual Report 2007 Annual Report is input to the Mid Term Review A delay of the Annual Report will delay the MTR!! This year AUDIT Certificates are required for All participants (except when 0 spending) We need a final report early september (1st Report was final in december 2006) 16 November 2018 SKADS Controller Meeting

Annual Report Official Timeline Official Timeline for Report 2007: 22nd March 2007: Controller meeting July 1, 2007: Request for Reports July 16, 2007: Prepare financial figures July 21, 2007: Report Task level July 26, 2007: Report DS level July 30, 2007: Provide Forms C, Justifications of Resources (Audit Certificate Required) August 10, 2007: Submit report to the EC 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Advance Payments Money is ready for transfer Payable starting next week Small contingency fund is created 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Start preparing for audit early Make sure auditor knows when audit is needed Audit for 2005/2006 figures can be done right now 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Contingency: the budgetary consequence: keeping 5 %, it is like 2% of the total budget propose to keep the funds to be able to act on unforeseen circumstances like the entering of a new consortium member unforeseen costs w.r.t. the Mid Term Review perform to 2009 properly and have SKADS 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting 16 November 2018 SKADS Controller Meeting

Annual Report Consistency Progress Report Activity & Progress Reporting DS-2 DS-3 DS-4 DS-5 DS-6 DS-7 DS-8 C-forms+ Justifications Participant - 1 Participant - 2 Participant - 3 Participant – x 16 November 2018 Administrative Reporting SKADS Controller Meeting

SKADS Controller Meeting Annual Report All Templates are available at the SKADS website: http://www.skads-eu.org/p/SKADS_documents.htm C-forms and Justification of Resources required for each participant, even in the case of zero spending!! Sent C-forms and Justification of Resources mid July by email to Project Office first Sent drafts of Audit Certificates as well 16 November 2018 SKADS Controller Meeting

Annual Reporting: Advice to Participants C-Form is decisive document w.r.t. EU-funding Justification of resources is link between C-form and Progress Report Make sure traceability is accurate: Receipts from travel expenses are available Make sure you can account for the time of resources Own accounting rules are leading 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Timesheets The project office does not require timesheets (however we appreciate receiving them for information purposes) Timesheets are for internal verification only. The auditors will need them! Timesheets are a new EC requirement w.r.t. time staff works on SKADS 16 November 2018 SKADS Controller Meeting

SKADS Controller Meeting Status Report Technical achievements - general remarks and highlights of technical progress achieved during the month. DS leaders should also contribute a summary of progress by the entire DS. Meetings attended - include contact with other Fifth Framework projects, and any conferences, workshops or project meetings attended. Issues - these may be technical, administrative or other problems foreseen. All issues raised will be put on the next PMC agenda. Red flags - these are major problems, internal or external, which if unresolved could halt the project. These will be the subject of an extraordinary PMC, and if still unresolved, will be passed on to the Commission. Plans for next month - these can be a brief note of the main goals. Update on Milestone planning 16 November 2018 SKADS Controller Meeting