The Quench Detection-Wire-Feedthrough Plug-In of W7-X

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Electrical Power Systems
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
1 Cables A large portion of electrical signals are transmitted through solid electrical solid electrical conductors. A wire is a single conductor. A cable.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Frankfurt (Germany), 6-9 June 2011 Alex Geschiere Liandon member of Alliander Alex Geschiere – Netherlands – Session 1 – 1256 Superconducting cables A.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The integration of 420 m detectors into the LHC
Concept Design for LBNF Far detector (LAr single phase)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
DEVELOPMENT AND FABRICATION OF EXTENDED SPARK PLUG TYPE LEAK DETECTOR (ESPLD) FOR PFBR M.R. JEYAN INSTRUMENTATION DEVELOPMENT AND SERVICES DIVISION FAST.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
SIS 100 Vacuum chamber Recooler String system Components
Final Design Cryogenic and mechanical configurations
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
MQXC Nb-Ti 120mm 120T/m 2m models
Ti/SS transitions A.Basti INFN-PISA*
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
ob-fpc: Flexible printed circuits for the alice tracker
Challenges of vacuum chambers with adjustable gap for SC undulators
Goddard Space Flight Center
Heat shrink solder sleeving
Introduction to W7-X Coil Testing at CEA – Saclay, France
Design of Distribution Feedbox at LHC P7
Preparation of Components for the Mounting of
Engineering Project Cable Management.
Natural Sciences and Technology Grade 6
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Wiring the Light and Relay
Quench calculations of the CBM magnet
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

The Quench Detection-Wire-Feedthrough Plug-In of W7-X Max-Planck-Institut für Plasmaphysik, EURATOM Association The Quench Detection-Wire-Feedthrough Plug-In of W7-X Kerstin Rummel, Detlef Rademann, Olaf Volzke Max-Planck-Institut für Plasmaphysik, Euratom Association, Teilinstitut Greifswald, Wendelsteinstr. 1, D-17491 Greifswald, Germany Introduction and requirements Assembly A test installation at the OV with a full-size prototype of a QD-Plug-in including making and testing the connection of QDD-wires to QD-wires was successfully carried out to qualify the assembly procedure and train the assembly team. Special attention during this test was given to the support and handling of the 424 kg dome extension including QD-plug-in as well as the controlled overlap of MLI during alignment of the dome extension to the dome. Now the assembly at W7-X has been started. Two QD-Plug-ins for the first module 5 are pre-assembled. The installation of these QD-Plug-ins on the QD-domes is underway. For continuous on-line monitoring of the superconducting state 1624 Quench Detection-wires (QD-wires) are connected at the joints of the coils and the bus bars. The wires are bundled to 190 6-wire cables and 121 4-wire cables. The electrical potential of these wires must be fed through the Outer Vessel (OV) to the Quench Detection Units. Therefore, 10 QD-domes, i.e. two per module are provided on the OV. The QD-domes are differently located and oriented. Several constraints require a complex feedthrough system design: maximum allowed integral helium leak-rate of one QD-dome 10-8 mbar l/s. maximum heat load to the thermal shield of the OV 140 W electrical insulation of the electrical feedthroughs for a nominal voltage to ground of 6 kV DC and a related test voltage of 13 kV DC under conditions close to the Paschen minimum (Paschen test) Pre-assembly procedure of the QD-plug-in Assembly procedure of the QD-plug-in on the QD-dome Mounting the sockets in the lid Paschen test at 10kV and leak test of the sockets Mounting of plug-in-tube , radiation shied and base plate (fig. 11, 12) Wrapping of MLI around the plug-in-tube Inserting the QD-plug-in in the dome extension Leak-test of the flange connection between lid and dome extension Fixing the QD-plug-in on the supports of the QD-dome (fig. 13, 14) Mounting of QD-connectors (fig. 15) Paschen test of each single connector at 5 kV Installation of screen and strain relief at the connector Thermal connection of base plate to the thermal shield of OV Inserting the QD-plug-in in the dome extension Leak-test of the flange connections Design of the Quench Detection-Wire-Feedthrough Plug-in (QD-plug-in) Fig. 1. QD-domes of module 1: Inner diameter: 800 mm Average height: 500 mm Thermal Shield (70 K) Outer vessel MLI 31 (32) x QDD-cable Thermal Connection connector Inside cryostat 31 (32) x assembled socket Outside cryostat Dome extension QD-dome Radiation shield Plug-in-tube 4 ( 6) Lid Base plate QD-cable tray QD-cable Strain relief Flange connection Bronze sheet Copper plate Electrical feedthroughs in the lid Nineteen 6-wire cables and twelve 4-wire cables respectively thirteen 4-wire per dome For commonly used weldable ceramic feedthroughs with 1 or 2 pins there is not enough available space on the lid several commercial types of multi-pin feedthroughs were tested 7- and 4-pin female sockets from the company LEMO were chosen (fig. 3) Fig. 13. QD-Plug-in installed on the QD-dome Fig. 14. View on the lid Fig. 11. Pre-assembled QD-plug-in without dome extension Fig. 3. Electrical socket Fig. 4. Cross section of a socket Fig. 5. Sockets in the lid (view from vacuum side) Design of QD-plug-in allows the replacement of O-rings Sockets were assembled with 1.4 m long QDD-cables by the Lemo To obtain the high voltage characteristics at different pressures the soldered pins to the wires are potted in Stycast (fig. 4) Not connected seventh pin is connected to one of the other pins After mounting the sockets in the lid Paschen tests and leak-tests are performed (fig. 5) Fig. 12. QD-plug-in wrapped with MLI Fig. 15. Installation of QD connectors Electrical connectors Fig. 2. QD-Plug-in Electrical tests Small, reliable, applicable for 4 and 6-wire cables and easy to install Consists of three pieces made of G10 and hoses of polyethylene (fig. 6) Hoses of PE protect the wires against too strong bending at the edge of G10 For the 4-wire cables two holes in the center piece will be closed by epoxy Parts will be glued together and put over the wires (fig. 7-9) Soldering point will be placed in the middle of the separator Thermal losses Filling Stycast in the seventh hole in the center (fig. 10) Grooves in the center piece guarantee the flow of Stycast to the other holes The level of Stycast in all seven holes and between the separator and sleeve rise uniformly Numerous connectors were mechanically overstressed by bending the wires and then thermal cycled. All qualification samples have been passed successfully the Paschen test at 13 KV. To proof the electrical characteristic small chambers were designed to make a Paschen-test for each single QD-connector (fig. 16) They makes it possible to perform high voltage test under different air and Helium pressures on-site. Test voltage of 5 kV, allowed leakage current 5 µA During the Paschen test the work on the W7-X must be stopped simultaneous tests of much as possible QD-connectors are required simultaneous tests of the QD connectors of one electrical circuit for both QD-Plug-ins Only 7 tests compared to 64 tests with one chamber The design of the QD-plug-in (fig. 2) was mainly driven by the thermal losses to the thermal shield of the cryostat. Thermal radiation: depends on the surfaces, emissivity and the temperature distribution along the plug-in-tube. 30 W Thermal conduction: depends on the cross section of conductor and shield of the 1.4 long QD-wires and on the 600 mm long stainless steel tube. 202 W Copper of the conductor was replaced by constantan Copper of the shield was replaced by stainless steel Thermal contact to the base plate is minimized by using thermal insulated strain reliefs 134 W groove groove center piece separator sleeve Fig. 8. Assembly of QD-connector Fig. 9. Soldering of wires Fig. 16. Chamber for Paschen test Fig. 7. QD-connector Fig. 10. Filling of Stycast Fig. 6. Parts of QD-connector MT-22, Marseille, France, September 2011