Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Winter Island Park Public Meeting #2 Salem, Massachusetts.

Slides:



Advertisements
Similar presentations
OLDE TOWN ARVADA TOD Community Meeting November 13, 2013 Olde Town TOD.
Advertisements

Alternative University Appraisal System Dzulkifli Abdul Razak Universiti Sains Malaysia.
Forest Street Corridor DESIGNWORKSHOP Forest Street Corridor.
PROJECT KICK-OFF Jason Collins, Ph.D., P.E., AICP October 14, 2008.
Waterbury Branch Line Improvements opportunities to support sustainable development Tom Maziarz, Chief of Planning Connecticut Department of Transportation.
Group Project Environmental Fluid Mechanics Research and Comparison to Engineering Practice Written research report (6 pages) Written research report (6.
June 23, 2007 Alternatives Brainstorming Workshop Brisbane Baylands Specific Plan EIR.
May 12, 2007 Community Visioning Workshop Brisbane Baylands Specific Plan EIR.
STRONGER State Review Process Presentation to the EPA May 2005 Lori Wrotenbery.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
REGIONAL FORUM FOR BEVERLY, DANVERS AND SALEM DECEMBER 8, 2010 North Shore Regional Strategic Planning Project.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
C I T Y O F S A L E M Neighborhood South Salem March 18, 2008 PRESERVATION DISTRICT STUDY.
Sustainable Emerald Coast Advisory Committee Susan Poplin, Florida Department of Community Affairs November, 2006.
What is a Master Plan? It will create a future vision for the campus.
Integrating LID Into the Development Planning Process.
Availability of suitable space for expansion Lack of flexibility in allowed uses.
Land Use Study for the Community of Winchester July 9, 2012.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Construction Report December 8, Projects Track replacement and turf In Progress Walking tracks: Redesign Water wells January 2010 Bleachers January.
Construction Report January 19, Projects Track replacement and turf In Progress Walking tracks: Recommendation Water wells March 2010 Bleachers.
Schematic design presentation School of Business South Hall Renovation.
City of Rye Community Reconstruction Program Committee Meeting #2 Tuesday, July 8, :00 PM, Rye City Hall.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Jan. 21-3:00PM | ROOM 1E-113.
Planning and Design in Rockford: South Main Street Corridor Overview 315 North Main Street · Rockford IL
Proposal to Rhode Island Department of Transportation A Fresh Beginning The Blackstone River & Canal Navigation & Transportation System July 2009 Presented.
South Lake Union Urban Design Framework Report to the Seattle Design Commission September 17, 2009.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Teacher: Becky Albrecht
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
PGAV UMKC Academic Commons Draft Program. PGAV Planning Objectives Respond to UMKC Vision, Core Values and Strategic Goals Respond to the Master Plan.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
Ames Area Long Range Transportation Plan Issues / Visioning Workshop Originally helpd …November 3, 2009 Welcome!
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Phase I – Public outreach Project DeRenne Project Advisory Committee: The Project DeRenne Project Advisory Committee will facilitate amiable strategic.
December ESIP 2.0 Progress Steering Committee has been discussing the best way to move forward Learned from socio-economic indicator effort at NH.
Nicodemus National Historic Site Visitor Center Site Selection Study and Environmental Analysis.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
Mendota / Lebanon Hills Greenway Project Introduction November 2012 Mendota / Lebanon Hills Greenway Project Introduction November 2012.
Maricopa Association of Governments (MAG) February 5, 2003.
Prepared by: Alex Fisch Planning Services Division.
Scaling Green Infrastructure JANUARY 27, 2016 – CITY OF PORTLAND AS PRESENTED TO THE OAPA CONFERENCE - OCTOBER 16, 2015.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
TND Overlays 1, 2 & 3 (a form-based zoning code) A method of regulating development to achieve a specific form. Form-based codes create a predictable public.
本课内容导读: 一、传统戏曲的表现内容 二、传统戏曲的特点 三、现代戏曲出现了哪些新变化 一、传统戏曲的表现内容 传统戏曲的表现内容大体来说可以分 为三类,通过下面三个戏曲片段的欣赏, 我们共同总结一下是哪三类。
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
Bill Valocchi, AICP Brownfields 2004 Division of PlanningSeptember 20-22, 2004 Saint Louis, Missouri.
PLANNING COMMISSION March 9, 2016 Update and Design Workshop MACE RANCH INNOVATION CENTER PROJECT.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
Town of Chapel Hill | 405 Martin Luther King Jr. Blvd. | Greenways Commission Presentation “Planning ahead for better days” October.
Buena Park General Plan Update Overview Presentation.
California Department of Education
Population Health Facility
Campus Master Plan.
St. Louis District Biological Opinion RRAT
Construction Report March 25, 2010.
Guelph Safe City Committee
ALTERNATIVES Santa Clara County Parks & Recreation Department and California State Parks.
الوحدة 20 مهارات التواصل مع الآخرين
Ask yourself questions like: How many players will there be?
Context Sensitive Solutions in Massachusetts: “Communities First”
Engineering for Professional training
Presentation transcript:

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Winter Island Park Public Meeting #2 Salem, Massachusetts Draft Master Plan Alternatives

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Progress to Date Site context Site analysis Site conditions Site uses Site structures Historical resources Regulations/Permitting Programming (Must, May, Must Not Occur) Criteria for Choice

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Site Context Marblehead Dominion Power Station The Willows Salem Center

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL The evolution of Winter Island... Date: 1940

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Current Conditions….

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Current Conditions

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Goals for the future Adequate parking for daily use Adequate bathhouse use Provide space for events Accommodate boat launch use Environmentally sensitive approach Enhance historic buildings Provide accessibility to all areas Provide adequate sitting/viewing areas Establish an organized park setting Create a safe park environment Financially sustainable Provide year round interest Year round management Provide education Enhance connection to water Flexible open space Phased approach

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Common Elements Precedent Images

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative A

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative A

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative A

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Phasing Concepts: Early Steps Alternative A

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative A Precedent Images

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative B

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative B Precedent Images

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative B

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative B

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Vision for the Future Alternative B

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Phasing Concepts: Early Steps Alternative B c

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Discussion: Comments and Ideas for the Future

Salem Winter Island Master Plan The Cecil Group FXM Associates Susan St. Pierre Bio Engineering PAL Schedule