Oracle Six-Year Highway Plan Preconstruction Status Systems Cost Escalator October 23, 2007.

Slides:



Advertisements
Similar presentations
1 CASUS Authoring System 07/2010 E-Learning & E-Teaching Welcome to the CASUS Authoring System!
Advertisements

ACCESS MY TAX PORTAL VIA
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Page 1 Pay Inter-Company Vouchers by Hand Check By MIS Department.
NWCA OPC Coaches Tutorial Roster, Schedules, Weigh-Ins, Results, and Reports.
Page 1 Accounts Payable Voucher Entry By MIS Department.
1 Disable Pictures & Login. 2 Turn off Pop-up Blocker.
Slide 1 FastFacts Feature Presentation September 7, 2010 We are using audio during this session, so please dial in to our conference line… Phone number:
Step-by-step instructions for adding a 586 tag to an existing MARC record.
The Reinberger Childrens Library Center Step-by-step instructions for capturing a MARC record and adding a 658 Tag to a record.
Setting Up Groups in D2L Emily Evans, Center for Applied Linguistics January 2007 New Jersey Department of Education Developed by the Center for Applied.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Title Subtitle.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
List and Search Grants Chapter 2. List and Search Grants 2-2 Objectives Understand the option My Grants List Grant Screen Viewing a Grant Understand the.
Child Health Reporting System (CHRS) How to Submit VHSS Data
Michigan Electronic Grants System Plus
0 - 0.
Addition Facts
1 Reverse a Journal Find an existing journal and reverse it in either: A original period B a different period.
© Copyright 2004 United Parcel Service of America, Inc. UPS, the UPS brandmark, and the color brown are registered trademarks of United Parcel Service.
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
1 SLIDE Insurance Company Regulation Division Insurance Market Regulation Division Medical Professional Liability Insurance Claim Reports Online Claim.
Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
Setting up Articles Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic.
1 1Line Training Capacity Release - Phase II Awards and Recall/Reput.
Well-Being Icon Refer to Slide 2 for instructions on how to view the full-screen slideshow.Slide 2.
iStar How to Create an Amendment
Basic Colleague Navigation User Interface (UI)
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Barbara Zendejas, Melissa Omand and Manuela Lachica,
INTRODUCTORY MICROSOFT ACCESS Lesson 1 – Access Basics
Florida Internet Claims Filing System Power Point Presentation.
Working with Travel Allowances (Per Diem)
CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
OCFS Data Warehouse Basic Training
Media-X eWalk Walkthrough Install Training- Part Two Topic: Uploading Completed Walkthroughs Office of Institutional Education Programs 1.
David Walker Ottawa TMG Users Group 15 March 2014.
1 Public Service Commission On-line Test Order Form.
Updating the Ohio Educational Directory. Log in to OEDS by clicking on the Sign In button in the upper left corner of any ODE Web page (
1 Welcome to JCCAA Data base presentation Click box to see the DEMO 1.JCCAA Web Site 2. Member Login 3. My Acount 4. School DBA The end.
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
Addition 1’s to 20.
25 seconds left…...
February Reviewing and Approving an Expense Report Press F5 to begin the slide show. Slides will automatically advance.
Reference Guide Module 1: Getting Started August 2014.
So you want to create a PO Here’s how…. 1.Open RAPS and click the “Create” tab at the bottom of the screen.
We will resume in: 25 Minutes.
Contract Audit Follow-Up (CAFU) 3.5 Pre-Defined & Ad hoc Reports November 2009 ITCSO Training Academy.
Step 1: Enter your “21 Character Employee Id Or Alternate User Id” Step 2: Enter Personal Password & Click Login NOTE : (First use password is “21 Character.
Division of Housing & Community Development
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Year End Processing Financial Management 1Freedom Systems - Year End Processing Webinar WELCOME TO THE YEAR END PROCESSING WEBINAR WE WILL BE WITH YOU.
NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout.
WEBGRANTS.COMMUNITY.UTAH.GOV Division of Housing & Community Development.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Page 1 MASS RECLASS REQUISITIONS TO CHANGE ACCOUNTING Instructions on how to create the requisition to change the ACCS on awards affected by the MASS RECLASS.
GRANT CLOSE OUTS 1.LOG INTO TEAM 2.CLICK ON PROJECT MANAGEMENT 3.QUERY THE PROJECT NUMBER 4.SUBMIT QUERY (FIRST THING - VERIFY THE PROJECT BALANCE) 5.CLICK.
2015 Partnering Conference “Division of Program Management” September 8, 2015 Ron Rigney, PE & PLS Director, Division of Program Management 1.
Self Service Enrollment – Choose Your Benefits Medical Dental Vision Life 401(k) IRA 457 Health Savings Account.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Compile your monthly P-Card Packet 1,2,3 For in depth screenshots and details on Step 1 click here 1.Open your transactions for the Current Billing Cycle.
Procurement Desktop Defense (PD²) Creating an Indefinite Delivery Contract SPS Spotlight Series February 2014.
NextGen Purchasing Calendar Year End 1099 Process
Presentation transcript:

Oracle Six-Year Highway Plan Preconstruction Status Systems Cost Escalator October 23, 2007

As per SAFETEA-LU Federal Regulations the estimated costs of federally funded projects are to be shown in Year of Expenditure dollars.

This basically means that the current estimated cost of each project phase in todays dollars must be increased to cover the cost of inflation from the current date of the estimated cost to the estimated year that the project phase funding will be required.

As project activities take place and better detailed information is available, it is the responsibility of each project manager to keep the estimated project phases costs updated in the Oracle Six-Year Highway Plan (SYP) Preconstruction Status System. In order to provide a uniform standard process for updating cost estimates for the Kentucky SYP projects, a Cost Escalator process has been developed within the Oracle SYP Preconstruction Status System.

The Cost Escalator process will use the estimated cost of each project phase in todays dollars and the estimated year that the project funding will be required to calculate the escalated cost for each corresponding project phase.

The calculated escalated project phase cost is based on a 4% inflation factor per year for Planning, Design, Utility, and Construction phases of the project and a 5% inflation factor per year for the Right-of-Way phase of the project.

The inflation factors are consistent with inflation factors that are being used in preparing Financial Plans for KYTC Mega projects. As projected inflation values change, the Cost Escalator process will provide the KYTC with the means to quickly update the cost in todays dollars to reflect the escalated project cost in the projected year of funding authorization.

The following information is a brief explanation and instructions on how to use the Oracle SYP Preconstruction Status Systems Cost Escalator process:

To access the SYP Precon Cost Escalator, on the main menu bar under Function click on Milestone Update. 1.

On the Milestone Update screen enter the District Number and the Item Number that you want to update, and then click on the Query button located at the lower left corner of the update screen. 2. Enter District Number Enter Item Number Note: Item Number + % will retrieve all subprojects in the base item number series. (i.e. 115%) After entering district number and item number, click on query button to retrieve projects.

After checking that the correct project was queried, click on the Cost Escalator button. The screen will change to the Preconstruction Cost Escalator screen. 3. To access the cost escalator process

Again, please check to make sure that the correct specified District and Item Number was queried before proceeding. Click on the Cost Escalator button. The screen will change to the Preconstruction Cost Escalator data input screen containing the specified projects phases information and the data input fields for the Cost Escalator updates. 4a. Note: Check to make sure correct project has been queried. Click on cost escalator button to access cost escalator data input screen.

The only data input fields on this screen is the Current Cost in Todays Dollars and Projected Year of Auth. For the initial process of starting the cost escalator process, the dollar amounts shown in the current Precon estimated costs were used to populate the Current Cost in Todays Dollars data field. 4b.

The amount shown in the Current Cost in Todays Dollars data field should be updated to reflect the current cost in todays dollars based upon the current project estimates, and the amount should not include inflation costs. The Year of Current Cost is an automatic insertion of the current calendar date year when the Current Cost in Todays Dollars is changed or Projected Year of Auth is updated Enter the estimated cost in todays dollars based upon the current project estimates and the amount should not include inflation costs. 2. The Year of Current Cost is an automatic insertion of the current calendar date year when the Current Cost in Todays Dollars or the Projected Year of Auth is changed.

After updating the amount shown in the Current Cost in Todays Dollars data field, insert the estimated projected year that reflects when the funding will be required for the corresponding phase of the project into the Projected Year of Auth data field. 6. Insert the projected year of authorization

To preview the calculation for Year of Expenditure Escalated Cost click on the Cal button on the right side of the screen. 7.

The calculated amount is shown in the Year of Expenditure Escal. Cost data field. Please note: The current cost in todays dollars, the projected year of auth, and the calculated value of the escalated cost is not saved until you click on the Save button. 8. Calculated Amount Remember to click SAVE

Continue the data input for the Current Cost in Todays Dollars and the Projected Year of Auth for the remaining phases of the project. 9.

Again, each time you enter data you can preview the escalated cost by clicking on the Cal button. Please note: The estimated costs under Current Precon Figures have not changed to the Year of Expenditure Escal. Cost and will not change until the updated information is saved. 10. Click here to preview escalated costs

After you have entered the Current Cost in Todays Dollars and the Projected Year of Auth, make sure that you click the Save button to save the current costs and projected year of authorization. 11. Remember to Save

The Current Precon Figures estimated cost is automatically updated to correspond with the values of the Year of Expenditure Escal. Cost when the updates are saved. However, the Current Cost in Todays Dollars is not changed. The Current Cost in Todays Dollars will be available on project reports, along with the date that the current cost was updated. 12. Costs update when you click Save. These data fields are cleared once you click Save.

Please note that when you click on the Save button, the information in the Reason for Cost Update data field will be updated to read Phase cost updated to reflect current cost in todays dollars. During our initial process of utilization of the Cost Escalator process we are going to insert this standard statement as a reason for cost updates. However, after the initial process is completed, we will remove the automatic insertion of the standard statement and will again require that the individual user of the cost escalator process provide the reason for updates to the current cost of the project phases. 13. Fields are automatically populated with the standard statement when you click Save.

Please note the SIXYEAR FIGURES button at the lower left of the input screen. If you need to see the type of funds, estimated cost, and scheduled fiscal year in the Six-Year Highway Plan click on the SIXYEAR FIGURES button. This is just a quick reference to the Six-Year Highway Plan information. Please note: Six-Year Highway Plan figures are not available for Breakout projects. 14. Click here to view Six-Year Highway Plan information.

Click on the Authorization button to return to the view to see current Precon Data information.15. Click here to go back to current Precon Data info.

Please note the statement at the bottom of the Cost Escalator screen, COST ESCALATOR PROCESS NOT APPLICABLE FOR PHASES WITH STAGE EQUAL TO AUTHORIZED OR AWARDED. 16. If you have not already saved your updates, and if you want to Exit the screen without saving any of your changes, click on the EXIT W/O SAVING button. 17. Click here if you dont want to save any of your changes.

If you have saved your updates and when you are ready to exit the Cost Escalator screen, click on the EXIT button. An information box containing Changes have been saved will appear on the screen and just click on the OK button, and you will return to the Milestone Update screen. 18.

Upon returning to the Milestone Update screen, you can query a different project to make updates or you can click on the exit button to return to the main Oracle SYP menu screen. 19. Click here to return to the main Oracle SYP menu screen.

Oracle SYP Main Menu Screen20.