NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout.

Similar presentations


Presentation on theme: "NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout."— Presentation transcript:

1 NetLink II User Guide PCO Module 1

2 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout countdown MAIN SCREEN AT START UP 2

3 Enter the project number on the main search. For project name and number will populate below. Locate the Potential Change Orders module on the left gray bar. 3 ENTER PROJECT NUMBER

4 Potential Change Order information will be entered in three tabs shown at the top of the screen: 1.AE Estimate 2.Contractor Estimate 3.Pending Change Order 4 PCO MODULE

5 Here is an example of data entered on the AE Estimate tab. This information is completed by the AE or CM. 5 PCO MODULE

6 Here is an example of data entered on the Contractor Estimate tab. This information is completed by the AE or CM. 6 PCO MODULE

7 Here is an example of data entered on the Pending Change Order tab. This information is completed by the Contracts Administrator. 7 PCO MODULE

8 To enter a new PCO (and you have already clicked on an existing record) you will need to click on the Clear Potential CO red button at the bottom of the screen. This will clear all the previous Potential CO Information. 8 PCO MODULE AE ESTIMATE TAB

9 AE or CM enters the PCO date and the PCO number. Next click on the PCO type drop down menu and select the appropriate type. 9 PCO MODULE AE ESTIMATE TAB

10 Next click on the PCO reason drop down menu and select the appropriate reason. 10 PCO MODULE AE ESTIMATE TAB

11 Next click on the Cost Basis drop down menu and select the cost basis. 11 PCO MODULE AE ESTIMATE TAB

12 Next click on the Budget Category drop down menu and select the appropriate budget category. 12 PCO MODULE AE ESTIMATE TAB

13 Next enter the PCO estimate amount and the date the PCO was estimate. If it is anticipated that the change will revise the construction complete date the new date should be entered in the Revised Prj Completion section. 13 PCO MODULE AE ESTIMATE TAB

14 Now you will need to scroll down to the lower section of the page and complete the Keywords (will show in the search results at the top of the screen), the Description, and the Justification. All fields are required. 14 PCO MODULE AE ESTIMATE TAB

15 After the keywords, description and justification is entered click on the Save as New Potential CO. 15 PCO MODULE AE ESTIMATE TAB

16 If any changes are needed on the PCO click on any of the pencil icons and make the appropriate change. Once changed click on the Update Potential CO button. 16 PCO MODULE AE ESTIMATE TAB

17 If the PCO is a Change Directive (aka Field Work Order) you will be able to print the Change Directive (FWO) form here. 17 PCO MODULE AE ESTIMATE TAB

18 Move to the next tab to complete the Contractor Estimates. Once the Contractor has provided the AE with their pricing the information is entered here. Notice that the PCO No. highlighted on the AE Estimate tab carries over to this tab in the PCO Detail Information section. 18 PCO MODULE CONTRACTOR ESTIMATES

19 Click on the Contract drop down menu and select the appropriate contract. 19 PCO MODULE CONTRACTOR ESTIMATES

20 Next entered the amount the contractor has quoted for the PCO work and the date the contractor provided the quote. Then click the Save as New PCO Detail red button. 20 PCO MODULE CONTRACTOR ESTIMATES

21 If any changes are needed on the PCO click on any of the pencil icons and make the appropriate change. Once changed click on the Update PCO Detail red button. 21 PCO MODULE CONTRACTOR ESTIMATES

22 From this screen you can print the Change Order form (you may need to use the scroll bar on the right). Print the Change Order, attach appropriate back up documentation, sign the change order, and route to the contractor for signature. 22 PCO MODULE CONTRACTOR ESTIMATES

23 Once the contractor returns the signed change order the AE or CM will scan the change order and email it to the appropriate Contracts Administrator. The CA will complete the processing and return approved change orders to the Contractor, AE, CM (if applicable) and Project Manager. 23 PCO MODULE AE AND CONTRACT ESTIMATES COMPLETE

24 The following section is for Contracts Administrator use only. 24 PCO MODULE CONTRACTS ADMINISTRATORS

25 The PCO needs to be created prior to moving on to the Pending Change Order tab. First check the box in the PCO Detail Search Results section. Next hit the red Create a Pending CO button. 25 PCO MODULE

26 Once the red Create a Pending CO button is selected the system will move you to the Pending Change Order tab. Enter the dates here and hit the red Update Pending CO button. 26 PCO MODULE

27 Print the Change Order Routing Slip and route for signature. Once signed update the PM and DOP dates and hit the Apply Pending CO red button. 27 PCO MODULE

28 Entering the Funding. For local funded projects the PO number will populate, as well as the funding source for the Design and FOD fee. For state funded projects the PO number will be pending. 28 PCO MODULE

29 When complete hit the red Create Change Order button. If all goes well you will receive a dialog box stating that the change order has been applied. 29 PCO MODULE


Download ppt "NetLink II User Guide PCO Module 1. 1.Name and access level 2.The “Red Bar” 3.Project Modules 4.Project search options 5.Search entry field 6.Timeout."