Work Plan for IEEE m Standard & IMT-Advanced Submission

Slides:



Advertisements
Similar presentations
1 IEEE m-09/ Work Plan for IEEE m Standard & IMT-Advanced Submission.
Advertisements

1 IEEE m-07/001r Work Plan for IEEE m Standard & IMT-Advanced Submission.
1 IEEE m-09/0019r Work Plan for IEEE m Standard & IMT-Advanced Submission.
Proposal for IMT-Advanced Development Work Plan for m Document Number: IEEE C /030 Date Submitted: Source: Jose Puthenkulam
Proposed TGm Plans for Upcoming Sessions & Work Plan Updates IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1646.
Proposed Feature Rapporteur Group Timelines and Call for contributions IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0762r2.
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Updates Required for the m Work Plan IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:
Project Planning Committee (PPC): Next revision project
Session # Maintenance Task Group Opening and Agenda
MM RG Report Document Number: IEEE C802.16n-11/0083 Date Submitted:
Discussion of Explicit vs. Implicit PC-A-MAP IE Assignment (15.2.3)
ITU-R Liaison Group Report - Session #75 Opening Plenary
Suggestion to update Work Plan for IEEE m Standard
Session # NRR Committee Closing Report
Session # Maintenance Task Group Opening Slides
ITU-R Liaison Group Report - Session #73 Opening Plenary
Project Planning Committee (PPC): Report
IEEE Presentation Submission Template (Rev. 9) Document Number:
HO DG Meeting Minutes Document Number: IEEE S802.16m-09/0752
Project Planning Committee Opening Report
UL Control Ad-hoc group discussion summary
Session # Maintenance Task Group Closing Plenary Report
Project Planning Committee Opening Report (Session #77)
IEEE Working Group on Mobile Broadband Wireless Access
ITU-R Liaison Group Report - Session #62 Opening Plenary
Title: LE TG Closing Report for Session #61
IEEE MEDIA INDEPENDENT HANDOVER
Title: LE TG Report for the opening plenary – Session #57
Title: LE TG Report for the opening plenary – Session #59
Title: LE TG Agenda for Session #53
Title: LE TG Report for the opening plenary – Session #58
Title: LE TG Closing Report for Session #56
Title: LE TG Closing Report for Session #56
Title: LE TG report for the opening plenary – Session #66
Suggestion to Retaining ALL 16m Features
Session # n GRIDMAN TG Closing Report
Session # n GRIDMAN TG Closing Report
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Closing Plenary Report
Session # Maintenance Task Group Closing Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
Overview and definitions adhoc report
Title: LE TG Agenda for Session #62
Session # GRIDMAN Opening Report
ITU-R Liaison Group Report - Session #80 Closing Plenary
Title: LE TG Closing Report for Session #63
Session # Maintenance Task Group Closing Plenary Report
ITU-R Liaison Group Report - Session #52 Closing Plenary
IETF 16ng Working Group Update
Session # Maintenance Task Group Opening and Agenda
Session # n GRIDMAN TG Closing Report
ITU-R Liaison Group Report - Session #52 Opening Plenary
Title: LE TG Agenda for Session #52
Session # Maintenance Task Group Closing Plenary Report
Project Planning Adhoc: WG Opening Plenary Report
Title: LE TG Closing Report for Session #61
ITU-R Liaison Group Report - Session #61 Opening Plenary
Session # NRR Committee Closing Report
Session # Maintenance Task Group Closing Plenary Report
Treasurer’s Report Document Number: IEEE /0059
Session # NRR Ad Hoc Committee Report
Presentation transcript:

Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission 2009-04-06 IEEE 802.16m-09/0019 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission

Updated TGm Work Plan IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE 802.16m-09/0019 Date Submitted: 2009-04-06 Source: Jose Puthenkulam Voice: +1-5032646121 Intel Corporation E-mail: jose.p.puthenkulam@intel.com (TGm Work Plan Adhoc Chair) Venue: Vancouver, BC, Canada Base Contribution: IEEE 802.16m Work Plan document (IEEE 802.16m-07/001r2) Purpose: Updated Work plan and timeline for TGm development Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.

Documents to be Developed in TGm 2009-03-12 IEEE 802.16m-07/001r2 Documents to be Developed in TGm TGm will develop the following documents as part of 802.16m standardization process: System Requirements Document (SRD) A set of possible deployment scenarios and applications of the 802.16m standard. A set of performance targets and features that 802.16m compliantsystems shall meet or exceed. Evaluation Methodology Document (EMD) A complete set of parameters, models, and methodologies for the link-level and system-level simulations that allow fair evaluation/comparison of various technical proposals. Channels Models: A set of spatial channel model parameters are specified to characterize particular features of MIMO radio channels to be used for simulating technical proposals for the future 802.16m standard. System Description Document (SDD) Architecture and design of the 802.16m air interface amendment Captures the core technical concepts behind the features included in the amendment Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology Document 802.16m amendment 802.16 IMT-Advanced Proposal

TGm Timelines 3 2009-03-12 System Requirements Evaluation Methodology 2007 2008 2009 2010 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 IEEE 802.16 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec IEEE 802.16m System Requirements Sep ’07* Jan’08* Evaluation Methodology Amendment Ready for IMT-Adv evaluation System Description Nov ’07 Jan 09* IMT Advanced Proposal ITU based Updates Jan ’09 Sept ’09* Final Proposal Refinements 802.16m AmendmentŦ Nov ’08 May ’09 Nov ’09 May ’10 Working Doc Letter Ballot Sponsor Ballot Jun ’08 ITU-R IMT Advanced IMT.TECH Circular Letter Jun ’08 ITU based Updates Oct ’08 IMT.EVAL Jan’09 Oct ’09 Proposal Submission IMT.RADIO Jun ’10 Proposal Evaluation & Consensus Building Develop Recommendation ITU-R WP5D Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 3 *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). Ŧ 802.16m amendment is dependent on the 802.16Rev2 Project completion

Proposed Process for staging 802.16m Amendment feature development PHY/MAC features required for IMT-Advanced for a working system P802.16m draft AWD SB WG LB Feature inclusion vote 50% 75% 75% 50% Amendment Feature development: -Feature developed as a RG contribution to TGm -Finally included only as a complete proposal, not a partial one -Develop as a self contained clause/subclause unless it is essential -Do not put place holders in Amendment till the feature is ready. (SDD will still have all features) -RGs should track Amendment development for consistency -WG LB or SB recirculation scope should allow feature inclusion Feature 1 Feature 2 Feature N Feature N+1 RG RG RG Feature WG Letter Ballot Next Project (New PAR) RG AWD = Amendment Working Doc RG = Rapporteur Group LB = Letter Ballot SB= Sponsor Ballot

Feature RG process for the Amendment Feature Rapporteur Groups (RG) will develop contributions for adoption by TGm as per Process (in previous slide) RGs will be authorized/re-authorized at each TGm session TGm will provide final deadlines for completion of RG work. RG must start with a work plan based on TGm final deadlines. RGs must report progress at every TGm session RG final output contribution must be complete by TGm deadlines for adoption into the AWD/Draft RGs may meet during TGm sessions RGs can arrange teleconferences with 7 day advance notice RGs conduct straw polls for decision making RGs are open to all participants