Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITU-R Liaison Group Report - Session #80 Closing Plenary

Similar presentations


Presentation on theme: "ITU-R Liaison Group Report - Session #80 Closing Plenary"— Presentation transcript:

1 ITU-R Liaison Group Report - Session #80 Closing Plenary
IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date Submitted: Source: Hajime Kanzaki Voice: Hitachi, Ltd. Venue: IEEE Session #80, WG Closing Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Closing Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 ITU-R Liaison Group Report - Session #80 Closing Plenary
Hajime Kanzaki Acting Chair, ITU-R Liaison Group IEEE WG Session #80 San Diego, CA, USA, July 2012

3 Agenda for the Week Introduction, approval of the agenda
Review and follow workplan of IEEE Gdoc Work Items: 3-1) Review ITU-R status 3-2) Develop and finalize M Meeting Y+1 contribution 3-3) Draft the liaison statement to WATO 3-4) Draft Certification and reference and transposition statement for M Review inputs/liaisons, and prepare responses and any other output documents to external organizations as necessary Update workplan Approve all outgoing documents Other business

4 Outcomes of Session #80 Per Workplan Beyond Workplan
Develop and finalize M Meeting Y+1 contribution Gdoc - Draft contribution ITU-R WP 5D-Update of WirelessMAN- Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+1) -> Already submitted to Draft the liaison statement to WATO Gdoc - Draft Statement to WATO members regarding Meeting Y+1 Contribution of WirelessMAN-Advanced toward Rec. ITU-R M Draft Certification and reference and transposition statement for M Gcon - Draft certification of references and transposition statement for M Beyond Workplan Other contribution Gcon - Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M (Meeting X) Update workplan Gdoc - IEEE ITU-R Liaison Group Workplan

5 Review Results (1/3) On ITU-R documents IEEE 802.16-12-0407-00
Report from ITU-R WP5A on acceptance of IEEE contribution 41E (CRS2) -> Noted IEEE IMT-2000 OFDMA TDD WMAN submission toward Rev. 11 of Rec ITU-R M (Meeting X+2) [as ITU-R 5D/65] -> Noted IEEE Update of WirelessMAN-Advanced Radio Interface of Rec. M.2012 (Meeting Y) [as ITU-R 5D/64] -> Noted IEEE Liaison on "Working document towards a preliminary draft new Report ITU-R (LMS.CRS2)" [as 5A/41] -> Noted IEEE Planning for Development of IMT-Advanced Parameter Set for ITU-R JTG > Refer to workplan

6 Review Results (2/3) On ITU-R documents IEEE 802.18-12-0053-00
working document to a Preliminary DRAFT REVISION OF RECOMMENDATION ITU-R M > Noted IEEE WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT REVISION OF REPORT ITU-R M > Noted IEEE Working document towards a PDN Report ITU-R SM.[SMART_GRID] - Smart grid power management systems -> Noted IEEE LIAISON TO ITU-R STUDY GROUP 1 REGARDING G.wnb, -> Noted IEEE Cover_Letter_WP_5A_M.2116_M > Refer to workplan

7 Review Results (3/3) On IMT-2000 Administrative Statement
IEEE Gcon Draft certification of references and transposition statement for M > Approved (No action) IEEE Gcon Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M (Meeting X) -> Approved

8 Motion 1 To approve the following documents subject to editorial corrections. Draft contribution ITU-R WP 5D-Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+1) Proposed Contribution to ITU-R WP 5D - Update of Subclause 5.6 of Rec. ITU-R M (Meeting X) Moved: Hajime Kanzaki Seconded: Hyungjeong Kang Results (For/Against/Abstain): 12/0/0

9 Motion 2 To approve the following documents and authorize the WG Chair to forward them to its recipients subject to any editorial corrections. Gdoc - Draft Statement to WATO members regarding Meeting Y+1 Contribution of WirelessMAN-Advanced toward Rec. ITU- R M Moved: Hajime Kanzaki Seconded: Tim Godfrey Results (For/Against/Abstain): 12/0/0


Download ppt "ITU-R Liaison Group Report - Session #80 Closing Plenary"

Similar presentations


Ads by Google