DESIGN AND CONSTRUCTION OF AREA 7 CEDAR HILLS REGIONAL LANDFILL – Lessons Learned from Economic Conditions Mizanur Rahman, Ph.D., PE, PMP Senior Engineer.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Addition and Subtraction Equations
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
PP Test Review Sections 6-1 to 6-6
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Progressive Aerobic Cardiovascular Endurance Run
1..
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
LN-251 SimINERTIAL Performance
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
PSSA Preparation.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

DESIGN AND CONSTRUCTION OF AREA 7 CEDAR HILLS REGIONAL LANDFILL – Lessons Learned from Economic Conditions Mizanur Rahman, Ph.D., PE, PMP Senior Engineer and Project Manager King County Solid Waste Division 4/15/2011

Presentation Outline Overview of Cedar Hills Regional Landfill Area 7 Development Summary Pre-Design and Design Process Bidding Process Construction (Phase 1 and Phase 2) Lessons Learned Wrap-up/Questions 4/15/2011

Population served - 1.3 million; Landfill area: 920 acres of land Southeast King County Landfill operations began: Early 1960’s 850,000 tons/year; approx 1.13 MCY of airspace consumed/year Design capacity: 50-60 million tons Capacity consumed: 33 million tons as of 2010 Estimated closure date : 2024 4/15/2011

CEDAR HILLS REGIONAL LANDFILL SITE MAP 4/15/2011

Area 7 Development Overview Area Developed: 18.6 acres Design and CM budget: $2.9 million ; Construction: $10.01 million; King County Project Management : $254K Construction Contingency: $1.54 million Design Began: February 2006 and Construction Completed: March 2010 Construction completed in 2 phases: 2008 and 2009-10 4/15/2011

Area 7 Phase 1 Construction 4/15/2011

Area 7 Phase 2 Construction 4/15/2011

Area 7 Commissioned 4/15/2011

Area 7 Grand Opening 4/15/2011

Area 7 Development Timeline   2006 2007 2008 2009 2010 1 2 3 4 5 6 7 8 9 10 11 12 Pre-design (Initial Plan) Pre-Design (Actual) Detailed Design (Initial Plan) Detailed Design (Phase 1 & Phase 2) Bidding (Initial Plan ) Bidding (Phase 1 & Phase 2) Construction (Initial Plan) Construction (Phase 1 & Phase 2) Planned Actual 4/15/2011

King County Area 7 Development Budget Prepared in 2005 Based on escalating costs from 2003 bids Engineer’s cost estimates were based on the average unit bid price of Area 6 development projects. Cost estimates were prepared at 90% level only. 4/15/2011

Area 7 Phase 1 -2008 Construction Bid Summary Area 7 Partial Excavation (Schedule B)- 12 bid items 5 bids submitted Engineer’s Estimate : $2,044,244 (Excl. Tax and Contingency) Lowest Bidder: $2,375,842 Highest Bidder: $3,470,454 Contract Awarded for : $2,811,156 (37.52% higher than Engineer's Estimate) (Contract awarded to the bidder with lowest combined bid total for all schedules) 4/15/2011

Phase 1 Construction Bid Items (Quote Comparison) Major Bid Items % of Total Estimate Engineer's Unit Rate $/CY Bidder's Average Rate ($/CY) % change over Engineer's Rate Excavation and Haul to Main Stockpile 34.97% $2.00 $3.65 82.60% Processing for Select Fill Materials 23.70% $4.27 $4.00 -6.32% Select Fill Haul and Place in Area 5 Stockpile 9.24% $2.25 $4.35 93.33% Screen 2" to 6" rock and place in Main Stockpile 8.88% $4.99 24.75% Crush 6" Over, Screen and place in Main Stockpile 8.33% $6.00 $8.90 48.33% 4/15/2011

2009 Area 7 Phase 2 Design Modifications Initial Engineer’s Estimate: $9.68 millions Revised Engineers Estimate: $8.42 million Design Modified @90% design level for the following items: Reduce Drainage Layer Material (DLM) thickness from 24”to 18” Owner excavate as much of the Area as possible Eliminate the Contaminated Stormwater (CSW) Lagoon modifications Revise the Area 7 temporary in-cell CSW lagoon Use 60 mil HDPE geomembrane liner in lieu of 80 mil HDPE liner Remove 22” landfill gas (LFG) sub-header from the bid package 4/15/2011

2009 Area 7 Phase 2 Construction Area 7 Phase 2 Construction included: Remaining Excavation (394,000 cy) Liner System Construction Leachate collection Initial Landfill Gas Collection Stormwater management system Contaminated Stormwater lagoon Expansion 4/15/2011

2009 Area 7 Phase 2 Construction (contd.) Total 62 bid items 10 bids submitted Engineers Estimate: $8.38 million Lowest Bidder’s Quote: $5.55 million Highest Bidder’s Quote: $8.09 million Contract Awarded for : $5.62 million (32.94% Lower than Engineer's) (Contract awarded to the bidder with lowest combined bid total for all schedules) 4/15/2011

% Change over Engineer's Rate Materials Price Variation (Engineer’s Estimated Rate Vs. Bidder’s Rate) Bid Item Description % of Total Cost Engineer's Unit Price Bidders Avg. Rate % Change over Engineer's Rate Geotextile - Type 3 3.92% $2.91 $2.27 -21.95% 60 mil Textured HDPE Geomembrane 7.25% $5.38 $5.43 1.01% Geosynthetic Clay Liner (GCL) 5.90% $4.38 $5.74 31.02% HDPE pipes (6" to 24") 10.26% $26.67-$101.63 $20.36-$85.67 -16% to -40% 4/15/2011

Price Variation for Major Construction Items (Engineer’s Estimate Vs Price Variation for Major Construction Items (Engineer’s Estimate Vs. Bidder’s Rate) Item Description % of Total Cost Estimate Engineer's Unit Rate ($) Bidder's Avg. Rate ($) % Change over Engineer's Rate Crushed Surfacing Base Course 1.93% $22.76 $18.19 -20.06% Excavation and Haul 18.60% $3.28 $2.94 -10.43% Drainage Layer Material 22.43% $31.16 $25.01 -19.73% Select Fill Processing 3.17% $7.00 $7.47 6.75% LFG Connection 2.99% $5,470 $1,936 -64.60% LFG Sub-Header Riser Bank 4.78% $23,734 $3,092 -86.97% Grass Lined Ditches 0.77% $11.52 $6.68 -41.98% Asphalt Lined Ditch - Area 7 Perimeter 0.80% $27.58 $18.37 -33.41% 4/15/2011

Critical Bid Item for Phase 2 Construction Drainage Layer Material (DLM): 22.43% of the total quote Quote for DLM by Bidder (Contract Awarded): 39% lower than the engineers estimated rate The DLM bid item was not critically evaluated with respect to its specifications and market price An ambiguity in the DLM specification existed and was overlooked Differences in interpreting the DLM specification led to a claim by the Contractor 4/15/2011

Lessons Learned Changes in Economic Conditions had impacts on: Construction services pricing; Bid materials pricing; Competition; Quality control; and Schedule delay 4/15/2011

Lessons Learned (Contd.) Alternative engineering cost estimating technique is necessary and should include: Baseline (30% design level) cost estimate based on historical cost data of similar projects Update baseline cost estimate with design progression at (60%, 90%, and 100% level) Verify and update the cost estimate with market conditions 4/15/2011

Lessons Learned (Contd.) Benefits of alternative engineering cost estimating technique : Additional costs for design modification to meet the budget goals could have avoided/mitigated at earlier stage Critical bid items should be estimated more accurately Gap between final cost estimate and the budget could be minimized at earlier stage of the design plan. 4/15/2011

Lessons Learned (Contd.) Critical review of the bid items with high volume and high price tags during bid evaluation stage: Bid specifications of the critical bid items be evaluated for market conditions Bidder’s explanation on extremely low/high quoted items be sought at bid review session 4/15/2011

Lessons Learned (Contd.) Additional costs incurred for: Reworking design plans to comply with budget ($67,000) Preparing two bid packages ($175,000) Claim for DLM specifications Changes ($465,000) Support services for claim negotiation ($95,000) Extended construction management , ($ 70,000) and Extended county project management (Approx. $30,000). 4/15/2011

Conclusions Perform 30%-60%-90% design within budget limits Update cost estimate at 30%-60%-90% design level Prepare budgets based on escalating old cost data as well as market condition Engineer’s cost estimate should be updated and validated with market prices along with design progression Allow for design improvements during construction Use of mattress – an innovative technique for protecting DLM from soil clogging 4/15/2011

Area 7 Operations- Use of Mattress 4/15/2011

Questions??? Thank you! THANK YOU! mizanur.rahman@kingcounty.gov 4/15/2011

Area 7 Phase 2 Construction (Geomembrane Liner) Connection Between Area 6 and 7 Geomembrane Rolls Out on Area 7 4/15/2011 Extrusion Welding on Geomembrane Pipe Booting with Geomembrane

Manhole for Leachate Collection Initial Gas Pipeline Collector Installing Penetration Box 4/15/2011 Areas 5 and 7 Leachate Tie-in