Stansted Transformation Programme Overview

Slides:



Advertisements
Similar presentations
Delivering for the passenger A Vision for London Luton.
Advertisements

Business Aviation: Operations and Service Quality by Provider Organisations Macao, September 2013 Captain Scott Macpherson.
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Airport Design Consult ADC Delhi International Airport Existing International Terminal T2 Re-modelling Proposed planExisting plan.
Project title: HEATHROW, WHAT AN AIRPORT! Author(s) of the project: Simona Petrescu Sept.2013.
Cheyenne Regional Airport New Airport Terminal Project December 1, 2011.
DRO AIRPORT TERMINAL EXPANSION Alliance Presentation – April 2013.
Wimbledon Station - a station fit for Chris Chowns (Principal Transport Planner) Nick Greenwood (Transport Planning Manager) LB of Merton Transport.
New Orleans March 2009 More Cost Effective Management of Airport Shuttle & Parking Services.
Airport Systems Planning & Design / RdN AIRPORT PASSENGER BUILDINGS: EFFICIENCY THRU SHARED USE  Dr. Richard de Neufville  Professor of Engineering Systems.
SOUTH TERMINAL UPDATE May 20, Date Agenda Introduction (Phillip N. Brown) Recent Passenger Trends (Dr. Sean Snaith) North Terminal Complex Capacity.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 “Cisco Unified Airport Operations” Your business, Our technology, OUR.
TRANSPORT John Stavropoulos. Overview Scope Main Transport Policies Transport Arrangements – HOD’s & AHOD’s Transport Arrangements – Other Members of.
Ballina Byron Gateway Airport Presentation November 2012.
Chris Jones, Public Affairs & Marketing Manager Clark County Department of Aviation Oct. 8, 2012 McCarran International Airport – Gateway to Las Vegas.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Sunnyside stands for education $88 million bond M&O override.
Lecture 7: Airport Financial Management
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Kelowna International Airport 2010 Development Program September 17, 2007.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
The LFS Private Terminal One chance to make a first impression.
Transport Update Chris Carter Transport Strategy Manager.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
Airport Overview. History Key Dates 1  on April 1st, 1932, the Civil Airport of Cluj is established  in 1944, the airport is destroyed during the World.
Lecture 6: Airport Financial Management
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
An inside look at Airport Design
Tampa International, Peter O. Knight, Plant City and Tampa Executive Airports Aviation Authority Welcome AGTA Members Spring 2014.
COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private.
ACI Biometrics Task Force Status Report ACI Bio TF Meeting 2 Geneva, Switzerland April 21, 2005.
Is it easier to travel Nowadays? Air travelling Form 9.
September, 2015 YQ Fulfilment. YQ Preposition a global network of specialist airport meet & assist service partners 1.
AGTA Spring Conference 2011 LOOK INTO THE FUTURE-- PLANNING FOR THE NEXT 5-YEARS AT OAK Joan Zatopek, Senior Aviation Project Manager Aviation Planning.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
Real Property Policy Update Planning and Development Committee August 4, 2015.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
Terminal B Redevelopment Lease George Bush Intercontinental Airport/Houston.
Milano-Malpensa Airport
PRODUCT INTRODUCTION Club Continental is located on the ground floor of the Terminal 1, intended for both departing or arriving passengers to/from all.
Development of airport - important factors
Part1: Vocabulary preparation
Aeronautical Facilities
PIERRE ABIGNANO Projects Director.
Door to Door Travel Model
WELCOME TO SWISSPORT.
Terminals and Transport Interchanges
Honor Flight Volunteers
Planning for a New Airport in Thessaloniki, Greece
Air Canada is the flag carrier and largest airline of Canada by fleet size and passengers carried.
Transportation Research Board
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
McKinney Airport Master Plan Update April 3, 2018
McKinney Airport Master Plan Update June
Capacity of T2 and the satellite – a comparison
McKinney Airport Master Plan Update May 1, 2018
Design of Components of Airport Passenger Buildings
Flexible Hours - circa £36,000
Flexible Hours - circa £36,000
Flexible Hours - circa £36,000
Flexible Hours - circa £36,000
Special Assistance Consultative Committee March 8th 2018 Start – 10:00
IMPORTANT NOTICE Travel Partners,   Amman, April 3,  As of April 7, 2019, Royal Jordanian will move its operations to/from Istanbul, from Istanbul.
GREAT HALL INITIATIVE.
NOME Leadership Summit
Project/program update
Presentation transcript:

Stansted Transformation Programme Overview Presentation to STACC 26 April 2017 Use Dec Design day assumptions

Departure Transformation Stansted transformation programme Our transformation programme is focussed on 3 key areas that will deliver capacity, future-proof the operation and offer improved levels of service/products Arrivals Building The Arrivals Terminal is positioned between the current main terminal and the Radisson Blu hotel. This dedicated building for all arriving passengers will provide immigration, baggage reclaim, customs and baggage off load. The building is designed over 3 levels with a gross floor area of approximately 35,000 m2. Departure Transformation The existing terminal will be transformed to a dedicated departure only building providing: Shore line check-in with increased number of desks Secondary security screening area Expanded Departure Lounge including additional seating Extended baggage facilities Extended Remote Bussing Gate Facility * Bold – we will shortly be engaging with UEG on this scheme Airside Upgrade to airside infrastructure to support an increase in peak hour movements and to support parking for based aircraft.

car parking 4 car parking schemes will create circa 8,000 additional spaces across the site Meet and Greet Staff Short Stay Multi 4 car parking schemes across airport site Includes both customer car parking and additional employee parking Range of products served including Short Stay and Meet and Greet capacity

The transformation programme will be split into phases Programme of works The transformation programme will be split into phases Phase One (2017/18) Additional check-in desks Additional Departure Lounge seating New aircraft stands Additional customer and employee car parking (complete by 2022 subject to necessary approvals) Significant capacity enhancements across airport: Construction of the Arrivals Building Existing terminal building transformed into departures-only facility with: - Additional Check-in capacity - Second Security Screening Area - Reconfigured Departure Lounge Additional airside improvements will support more efficient use of the single runway. This work will commence following the completion of phase one. The Committee will be engaged at the appropriate points during these works

Hampton by Hilton due to open Summer 2017 Hotel update Hampton by Hilton due to open Summer 2017 Developed by Urban&Civic Construction partner McAleer & Rushe Hampton by Hilton brand – largest in Europe 357 beds 8 storey hotel Linked to terminal via covered walkway Due to open to public July 2017

Questions