Factory Integration Update to IRC April 23, 2012 Gopal Rao / Factory Integration - 20121 Gopal Rao, Peter Csatary, Richard Oechsner, Reiner Missale, Leo.

Slides:



Advertisements
Similar presentations
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
Advertisements

ITRS Winter Conference 2006 The Ambassador Hotel Hsin Chu Taiwan 1 ITRS IRC/ITWG Meetings HsinChu December 4, 2006 UPDATED Linda Wilson
ITRS Summer Conference 2010 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2010 Hans-Peter.
ESH ITWG April 7, 2006 Vaals, Netherlands Summary of Environmental, Health and Safety Chapter ITRS 2006.
ITRS Test TWG Don Edenfeld April 20 th, 2004 Spring Workshop - Stressa, Italy.
4 December 2002, ITRS 2002 Update Conference 2002 ITRS Factory Integration ITWG Michio Honma, NEC Jeff Pettinato, Intel.
ITRS Winter Conference 2011 Incheon, Korea 1 Work in Progress: Not for Distribution 2012 ITRS Litho One Pager April 24, 2012 Mark Neisser – SEMATECH Mauro.
The International Technology Roadmap for Semiconductors
ITRS Winter Conference 2008 USA 1 Work in Progress: Not for Distribution ESH ITWG Jim Jewett Environmental, Safety and Health Chapter ITRS 2009 Hans-Peter.
2001 ITRS Factory Integration ITWG
Work in progress Do not publish or distribute ITRS Factory Integration (FI) Update Public Conference Gopal Rao Factory Integration Chair July 2011 San.
DRAFT - NOT FOR PUBLICATION 14 July 2004 – ITRS Summer Conference ITRS 2004 Environmental, Safety and Health Chapter ITRS Conference, San Francisco, CA.
Summer Public Conference ORTC 2010 Update Messages
ITRS Factory Integation TWG
Winter Public Conference ORTC 2010 Update
1 DRAFT - NOT FOR PUBLICATION April 5-7, 2006, Maastricht ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006 Lothar Pfitzner, ,
2008 ITRS Public Conference San Francisco, USA 1 DRAFT – DO NOT PUBLISH ITRS Factory Integration Shige Kobayashi, Tom Jefferson July 2008 San Francisco,
ITRS Factory Integation TWG
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
ITRS Factory Integration (FI) Update
Overall Roadmap Technology Characteristics (ORTC) 2012
Accelerating Manufacturing Productivity Copyright ©2009 SEMATECH, Inc. SEMATECH, and the SEMATECH logo are registered servicemarks of SEMATECH, Inc. International.
Customer success stories: Empower people-centric IT.
THE CORE PROJECT Jose Jimenez (project manager). What is the Core platform?
Statistical Metadata Driven eForms Oleg Volguine Assistant Director Technology Services Division Australian Bureau of Statistics.
ITRS Factory Integration Presentation
E-standards Expert Group Meeting #2 20th June, 2012.
Implementing a Regional CMMS (Computerized Maintenance Management System) Jerrard Whitten, GISP GIS/IT Manager.
Technical Jonathan Wood.
CTS Strategic Roadmap Walkthrough, v1.2 Dan Mercer.
HP Quality Center Overview.
T h e Y i e l d M a n a g e m e n t C o m p a n y Service Business Rich Ruiz Director, Global Provisioning GSS Service Supply Chain Mgmt.
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
Agile Manufacturing Industries From Mechatronics to Collaborative Supply Chains Industrial Technologies Aarhus, 19 June Dr. Massimo Mattucci Session.
Federal Data Center Consolidation Initiative Karen Petraska August 17, 2011.
Building Sustainable MIS Infrastuctures
Technology Capabilities. Market Research + Tech Capabilities Datamatics has in-house capabilities to deliver Technical expertise. Our clients rely on.
Chapter 10 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Change Measurement Workbench Introduction January 2012.
Moving IT/BI From Reactive to Proactive in Process Performance Improvement From Reactive to Proactive:
ITRS Factory Integration Difficult Challenges Last Updated: 30 May 2003.
ITRS 2000 Update Work In Progress - Do Not Publish! 1 ITRS/ORTC Table Update Technology Node, DRAM Chip Size, and Logic Chip Size Update, Based on the.
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
Improve the HTML Form Entry Module Google Summer of Code 2011 João Portela Mentors: Darius Jazayeri Daniel Kayiwa.
UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Formal Progress Report 1 April
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EIS Progress Report Executive Steering Committee Meeting April 1, /6/20151.
Asset Management Solution 2012 April 2012© modClouds.com OverviewInventoryTeam TaskingClaim CenterBMS Monitoring.
ICT 25 Generic micro- and nano-electronic technologies Marc Boukerche DG CONNECT, A.4 Components.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
 ForwardVision is an Enterprise Resource Planning Application (ERP) designed to help small to medium-sized food producers manage the complexities of.
CHAPTER TEN OVERVIEW SECTION ENTERPRISE RESOURCE PLANNING
Segmap Solutions Mapping segments.
OCITF/OCWG Project Update
The Internet of Things (IoT) and Analytics
Computer Aided Software Engineering (CASE)
Michael Mast Senior Architect
Sonata Accelerated Upgrade Assessment
ITRS AMC Roadmap Project Plan : AMC Integrated Concept
Presented By: Daniel J. Brown, CQA
Japan PI&C Committee Liaison Report
SHARE Michael Chmura, SHARE Special Projects Leader
CHAPTER TEN OVERVIEW SECTION ENTERPRISE RESOURCE PLANNING
ITRS 2003 Factory Integration Chapter Backup Material
05 | Making the Cloud Transition
Technical Capabilities
ITRS 2001 Factory Integration Chapter Model Information
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Factory Integration Update to IRC April 23, 2012 Gopal Rao / Factory Integration Gopal Rao, Peter Csatary, Richard Oechsner, Reiner Missale, Leo Kenny, Dan Mcculley, Makato Yamamoto, Supika Mashiro, Michael Schilp, Markus Pfeffer, Boyd Finlay, Jonathan Chang, Andreas Neuber

– Table edits for 2013 changes in progress Need clear 450mm transition dates (2014 or 2015) – Some confusion on our tables Changes being identified and discussed for updates in 2013 – Vision for each FI sub team under discussion FICS: Trend is toward managing large amounts of data and better decision support requiring extended computing capabilities, e.g. cloud based storage and mobile computing ESH: Joint effort on identify sustainability issues in manufacturing Prod Equip: Migration from reactive to predictive control and management Increased intelligence capability in tools (e.g. auto recovery, self diagnostic and self control capabilities, automated PM, metrology recipe creation integrated with NPI AMHS: Clarification of 450mm/300mm equivalency assumptions (FI team is not linked to 450mm program – 300mm to 450mm metrics need to be reconciled – E.g. Area of Si vs wafer number processed may generate different actions Facilities: Overall impact of 450mm transition and process equipment with new utility requirements (e.g. EUV, metrology..) – Possible summit with G450C team and FI/ESH/ERM TWGs in Summer Joint discussion on roadmap It will help if IRC can facilitate this Gopal Rao / Factory Integration FI Discussion the Spring F2F:

Marcus/Richard: Develop a comprehensive predictive control systems for FI Roadmap Dan/Reiner: FICS Actions Supika: Present Tool Vendor perspective on EDA requirements Boyd/Leo: FI/Stds teams mapping and interface – Richard/Supika: Physical interface for 450mm handling platform and modules Leo: What EHS regulations may impact FI All – Id specific line items in tables that need to change G450C interface meeting with FI/ITRS in Summer? Gopal/Jonathan: Define Quality Assurance capability for FI – Boyd: Factory Control plan All – Go Through your Tables/Potential Solutions/Chapter Write Up – Identify changes – Review in phone meetings – Ratification in Summer F2F meeting Gopal Rao / Factory Integration Actions