Managing Director (Bajaj Power Ventures Ltd)

Slides:



Advertisements
Similar presentations
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Advertisements

ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart Energy Efficiency in IPPC installations October 21, Vienna.
India Electricity – 2006 Session – II Renovation & Modernisation Presented by: M.R. Ganesan / GM / SSBG Bharat Heavy Electricals Ltd.
A novel IGCC system with steam injected H2/O2 cycle and CO2 recovery P M V Subbarao Professor Mechanical Engineering Department Low Quality Fuel but High.
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
PRESENTATION OF INDUSTRIAL TRAINING ON
SWOT Analysis of Supercritical & Ultra-Supercritical Power Plants Strengths: High Thermal Efficiency Environment Friendly Significant breakthroughs in.
1 Increasing Energy Access while mitigating climate change Case for Energy Efficiency PAUL KIRAI National Project Manager, GEF-KAM ENERGY PROJECT - Kenya.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
Reheat cycle.
DETAILS OF CALCULATIONS:
“Energy Efficiency Guide for Industry in Asia”
CASE STUDY ENERGY CONSERVATION OPPORTUNITIES at A Foundry at Bhiwadi (Rajasthan)
POWER PLANT.
POWER GENERATION TECHNOLOGIES
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Effect of Reheating and Feed Water Heating on Steam Generation P M V Subbarao Professor Mechanical Engineering Department Good to Turbine and Cycle…..
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
STUDY OF BOILER’S ACCESSORIES
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
OPTIMIZATION OF CONVENTIONAL THERMAL & IGCC POWER PLANT FOR GREEN MEGA POWER Dr. V K Sethi & J K Chandrashekar Director Adviser Director Adviser University.
Institute of Energy Systems Prof. Dr.-Ing. A. Kather Dipl.-Ing. Sören Ehlers Jan Mletzko, M.Sc. Comparison of natural gas combined cycle power plants with.
Page 1 May 08 Energy – Fossil Power Generation 700°C Steam Turbine for highest efficiency Energy – Fossil Power Generation 700°C Steam Turbine – Challenges.
AIM :- TO STUDY ABOUT STEAM POWER PLANT
Analysis of Rankine Cycle with FWHs P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Engineering solution to Pure Thoughts..…..
STEAM POWER PLANTS.
World Leaders in Combustion Management Solutions PID Control (P)roportional (I)ntegral Internal Stat PID (D)erivative Further.
Cost Impacts of Cycling Coal-Fired Power Plants
A Seminar On Suratgarh Super Thermal Power Station (Raj.)
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
A Presentation On Summer Training At SURATGARH SUPER THERMAL POWER STATION (6×250MW)
A Govt of India Undertaking Bharat Heavy Electricals Limited Program on 3CC27 th Aug 2012.
Thermal Power Station.
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
Prof. D.N. Reddy Director Centre for Energy Technology and Principal University College of Engineering Osmania University Hyderabad – 7. THEME PAPER ON.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
S.K.Thapa General Manager BHEL, Kolkata EFFICIENT CYCLE IN POWER GENERATION AN INDIAN PERSPECTIVE.
Introduction And Thermal Power Plant
Upgrading and retrofit efficiency improvements for coal-fired power plants Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Gas Turbine Power Plant
Lesson 7 Steam Power Plant.
POWER PLANT ENGINEERING( )
Electricity Generation: Coal v/s N-Gas - Basic Economics
Objectives Evaluate the performance of gas power cycles for which the working fluid remains a gas throughout the entire cycle. Analyze vapor power.
Monika Topel, Björn Laumert kth, royal institute of technology
Thermodynamics Cycles.
UMCP Learning Objectives
Electricity Generation: coal v/s n-gas - Basic Economics
Lecture Objectives: Answer question related to Project 1 assignment
Simple Thermal Power Plant
Gas Power Plant - Layout and Operation
POWER PLANT THERMAL POWER STATION.
THERMAL POWER PLANT.
20th India Power Forum 2017 “Sustainability of Power Business – Paradigm Shift for 24x7 Power for All” Session I: Power Generation Scenario by 2022 :
TO PRESENTATION ON SUPERCRITICAL BOILER
Carnotization of Rankine Cycle
Furnace Heat Transfer & Steam Generation
Energy Intensive User Group Generation Maintenance Update
Electrical Engineering Fifth Semester
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
2015 EPRI Heat Rate Conference
Generation of Most Eligible Steam for Rankine Cycle
Generation of Most Eligible Steam for Rankine Cycle
Presentation transcript:

Managing Director (Bajaj Power Ventures Ltd) 20th India Power Forum 22nd Nov’2017 Sustainability of Power Business; Paradigm Shift for 24x7 Power For All Business case of Decommissioning Thermal Power Plants and their Replacement with Efficient and Cleaner Units By R. S. Sharma Managing Director (Bajaj Power Ventures Ltd) (Former CMD, NTPC)

Installed capacity of country as on 31st Oct’2017 Sr. No. Sector Capacity in MW % age Share 1 Total Thermal 219414.51 66.26% Coal 193426.50 58.41% Gas 25150.38 7.60% Oil 837.63 0.25% 2 Hydro (Renewable) 44765.42 13.52% 3 Nuclear 6780.00 2.05% 4 RES** (MNRE) 60157.66 18.17% Total 331117.58 100%

Details of coal based thermal power capacities Range No of Units MW % Upto 110 MW 107 8241.5 4.3 >110 MW & <200 MW 61 8252 200/ 210/ 250/270MW 228 50680 26.3 >270 MW & <490 MW 42 12900 6.7 490 MW to 800 MW 193 112300 58.4 Total 631 192373.5* 100 * The figures are based on Aug’2017 data

Existing design heat rate Vs normative heat rate comparison Range Present Design Turbine Heat rate K Cal/ KWH Operating GSHR with 4.5% margin (boiler eff 86%) Normative GSHR Difference in K Cal/ KWH Operating thermal eff % Upto 60 MW 2309 2805 2900 95 29.65 110 MW 2175 2643 2750 107 31.3 200/ 210/250 MW 1960-1980 2382 – 2406 2450-2500 44 – 68 34.4 500/600 MW Sub Critical 1940-1950 2357 – 2369 2375-2425 6 – 18 35.5 660 MW Super critical 1830-1860 2224 – 2260 2258 0 - 34 38.1 800 MW Super Critical 1777 -1829 2086 – 2148 Boiler eff 89% ---- >40

Latest available design heat rate Vs normative heat rate comparison Range Latest Design Turbine Heat rate K Cal/ KWH Operating GSHR with 4.5% margin (boiler eff 86%) Normative GSHR Difference in K Cal/ KWH Operating Thermal efficiency % 110 MW 1960 2382 2750 368 36.1 200/ 210/250 MW 1875 2278 2450 172 37.7 500/600 MW Sub Critical 1860 2260 2375 115 38.1 660 MW Super critical 1818 2209 2258 49 38.9 Ultra Super critical 1760 2066 Boiler eff. 89% ----

Margin of Improvement of thermal efficiency Range Operating GSHR with 4.5% margin (boiler eff 86%) Latest calculated GSHR with 4.5% margin (boiler eff 86%) Scope of Improvement K Cal/KWH Scope of improvement in thermal efficiency % 110 MW 2643 2382 261 3.6 200/ 210/250 MW 2382 – 2406 2278 128 2.0 500/600 MW Sub Critical 2357 – 2369 2260 109 1.8 660 MW Super critical 2224 – 2260 2209 51 0.9

Comparison of coal based thermal efficiency Note: From 2012 to 2014 the average efficiency has improved to above 30% Ref: Ecofys report-2014.

Potential of improvements in plant efficiency in APEC countries Category Area of improvement Net efficiency gain (% points) Combustion system Pulveriser and feeder upgrades 0.30 Air heater repair or upgrade 0.25 Soot blower improvements 0.35 Excess air I&C 0.20 Steam cycle Feed water heater repairs 0.40 Heat transfer tube upgrades 0.60 Steam turbine blades, sealings 0.50 Cycle isolation Condenser repairs O&M O&M training Computerized maintenance and management systems and reliability centred maintenance. Included in combustion and steam cycle gains. Efficient operation realised over the long term. Distributed control systems Combined total 3.50 Ref: (Boncimino and others, 2005) IEA , Nov’2015

efficiency improvement in existing capacities Decommissioning Vs efficiency improvement in existing capacities

Case-1: With super critical parameters and unit size 660 MW (replacement of 3 units of 200/210 MW) Description UOM Present New Percentage improvement THR kcal/kWh 2050 1818 11.32 Boiler efficiency % 85 86 1.17 GSHR 2520 2209 12.35 Aux Power Consump 9 6.75 25 NSHR 2770 2369 14.46 Comparison of cost of generation Description UOM Present New Difference FC Rs 0.66 2.30 (1.64) VC 2.25 1.92 0.33 Total Cost 2.91 4.22 (1.31) Note: The cost of generation will substantially increase. If unit runs in subcritical parameters, the generation cost shall further increase.

Case-2: Expected benefits by improving a 210 MW unit Description UOM Pre R&M After R&M (target) Percentage improvement THR kcal/kWh 2050 1875 8.54 Boiler efficiency % 85 86 1.17 GSHR 2520 2278 9.60 Aux Power Consump 9 8.5 5.55 NSHR 2770 2490 10.09 Presently efficient turbines are available with 1875 THR without change in boiler’s steam parameters. This results in reduction of Net SHR by by about 280 counts. Cost of generation Description UOM Present New Difference FC Rs 0.66 0.93 (0.27) VC 2.25 2.02 0.23 Total Cost 2.91 2.95 (0.04) The renovation cost per MW with turbine R&M taken as Rs 1 Crore/MW. With this the total cost of generation is expected to rise by Rs 0.04/KWH

Actionable points for improving thermal efficiency of plant HP, IP and LP turbine retrofits, using modern 3-D blading, new control valves. Installation of new control systems (need changing every 10 years). New burner management systems. Air Pre Heater improvements (sealing, additional sectors). Upgrading of mills to reach rated/ increase capacity. ESP improvements to reduce energy use and improved collection efficiency. High pressure feed water heater‘s improvements. Condenser improvements.

Conclusion Selective decommissioning is OK. Non reheat design units those have completed useful life be decommissioned. No decommissioning of 200 MW sets unless the same is non reheat with lower main steam parameters. 26% of installed capacity (50680 MW) consists of 200/210/250/270 MW. More than 50% of these are older units which are operating at higher heat rate. For efficiency improvement 200 MW sets stand to be major candidates and target THR should be 1875. For fixing of bottom line of thermal efficiency parameters of units a national level debate may be organized on achievable thermal efficiency of coal based plant based on national/ international data benchmarking. National average plant efficiency to be targeted above 37% from present level of 32-33% Continue. . . .

No capacity addition in place of decommissioned capacities requires to be undertaken. Rather efforts to be primarily focused on increasing the PLF from existing 60% to 80%/ 85%. This, by itself, will marginally improve the operating efficiency of thermal power plants and also unleash enough more MWs within current installed capacity to offset any demand of fresh capacity addition for at least next 5 yrs. Any new capacity addition in future be considered only within 100 kms distance of pit head/ costal locations. ------------------

Thank you