AHU connection kit.

Slides:



Advertisements
Similar presentations
CMV Mini VRF SYSTEM R410a, 50Hz.
Advertisements

Water & Wastewater Pump Station Control Basic parts: Metering & current limiters Main switch chassis Telemetry & Control Pump controls Questions: -IP.
Installation of GMV ODU and IDU
TROUBLESHOOTING. 5WSS TROUBLESHOOTING ERROR CODEFAULTY INDICATION E1ROOM SENSOR CONTACT LOOSE E2INDOOR COIL SENSOR CONTACT LOOSE E3WATER OUTLET SENSOR.
Total HVAC Control from anywhere Easy control that can save a fortune
AC-SSC-1 Installation and operation manual
HVAC Commercial Ref.
Page 1 MDS Installation. Page 2 Contents  Introduction  Outdoor Unit Installation  Indoor Unit Installation  Refrigerant Pipe Work  Gas Charge 
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
Siemens Building TechnologiesRWD heatpump controllers Xavier Zabalegui/David Jefferson 1 January 2003 RWD Heat Pump controllers RWD Heat Pump Controllers.
Energy Management with the use of an Intelligent Building Management System.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
An intelligent VAV zoning system
Intro Building automation describes the advanced functionality provided by the control system of a building. A building automation system (BAS) is an.
MDS Smart Commander.
On/Off Temp Holiday Select Fan Air clean Operation Auto SwingRoom Temp Week Select SET/CLR Hour MIN Timer Program Set Fan Speed Jet Cool Cancel RESET E_Heater.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
MDS COMMISSIONING.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
MDS Monitoring Software. Page 2 Contents  Introduction  User Interface  Service Personnel Interface  System Requirement  Demonstration.
EEV-KIT General Information. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. What it EEV-KIT 2. What is.
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
Hydraulic Kit (pump and tank) Pictures from prototype.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
Schematic Diagrams & Circuits
For Multiple refrigeration system
EEV-KIT For Single refrigeration system. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. Single refrigeration.
Applied Systems News FWEC*A Rudolf BARET HEISSIG.
Hardware Training Product: ITMS2.
Serving Professional Cultivators Worldwide Since 2007 Made in USA.
Fan Coils Units Control
ERX-condensing units Strategic Marketing Dec-15 1.Concept 2.Product range 3.Combination table 4.Piping length 5.Control possibilities 6.Benefits.
MCQUAY DIGITAL SCROLL SYSTEM
Service Section Technical Training December 2005.
the compact air control solution
Electricity Notes 6 - Circuits Electric Circuit – _______________________________________ All electrical circuits have 4 parts: 1.____________________________________________________.
Page 1 MCQUAY DIGITAL SCROLL SYSTEM Installation.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
James McIntyre VRF Training Manager V5 Key Components.
Refer to Service Manual for details Fault codes. To retrieve fault codes from the remote controller Press the ‘CHECK’ button for approximately.
2013 CHIGO Product CHIGO CMV VRF Control System.
CHIGO HVAC Product Introduction.
UniTrane™ Terminals High Wall Fan Coil: W-Line Ducted Fan Coil: D-Line
CMV-NET Chigo VRF Network Centralized Control System
VRF Trouble Shooting 采用midea通用PPT模版, 参考《公司简介》PPT.
Fan Coil Controller FC/S 1.1
CHIGO VRF System Commissioning.
Wega & Wega Power chilled beams
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
VENTILATION OF AD TARGET Kick off meeting
5. Outdoor unit Installation
ABB i-bus® KNX Room Solutions
BUILDING HEATING AND COOLING
How SCADA Systems Work?.
7. Test operation.
CHIGO CMV VRF Selection Software 采用midea通用PPT模版,参考《公司简介》PPT.
Wire connection instruction
SIO-RTD RTD MODULE.
Fault codes.
Oddgeir Gudmundsson, Jan Eric Thorsen and Marek Brand
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
MDS Smart Commander.
The key to comfort and reduced fuel use for all heating and cooling
Building Management System − 1
VRF Compatibility Analysis
Total HVAC Control from anywhere Easy control that can save a fortune
Error codes for split systems
solution to hotel application MelcotelTM The new and unique solution to hotel application.
Presentation transcript:

AHU connection kit

1. What is AHU connection kit? Chigo AHU connection kit is an interface to allow 3rd party manufacturer’s AHU connecting to Chigo VRF outdoor units. Chigo VRF outdoor units can be used with this connection kit, creating an ideal solution when a unique AHU is required. One AHU need at least one AHU kit.

2. Kit configuration AHU connection kit consist of control part, EXV part, temperature sensors and wired controller. EXV part Controller AHU connection kit Control part Sensors and wires

3. System schematic Chigo VRF outdoor unit Chigo VRF indoor unit 3rd party AHU

4. System configuration Purchase in Supplied by Chigo the market Outdoor Chigo VRF AHU connection kit Control part PCB Power terminals Communication terminals EXV part Outlet pipe Inlet pipe EXV AHU 3rd party AHU Control system Wired R/C Centralize R/C Network control BMS Accessories wires Wires: 1 controller wire 3 temperature sensor wires Supplied by Chigo Purchase in the market

4. System configuration Power supply Power supply P/Q/E T1/T2/T2B Fan/pump G/L pipe Power supply

5. Wiring terminals Reserved fan, pump, water level switch control terminals for AHU. ON/OFF, alarm signal output. ON/OFF Power Fan Pump Alarm Outdoor Water level switch

6. Control Control : Using Chigo wired controller (XCMV-03) Set point can be fixed via standard wired controller. The cooling load is determined by the air return temperature and set point on the wired controller. T2b Ts T2 T1 Room Wired controller AHU connection Kit

7. Two AHU kit connect to one AHU/IDUs Piping System AHU kit IDU/AHU ODU AHU kit Distributor Distributor

Wiring Diagram Use a wire connect the AHU kit together (Customized) Connect CN7/CN8 to another CN7/CN8 Use one wired controller control two AHU kit AHU kit P QE P QE P QE ODU AHU kit IDU/AHU

All the sensors must be attached to the corresponding position Sensor Connection AHU kit T1 T2 T2B IDU/AHU T1 T2 T2B AHU kit All the sensors must be attached to the corresponding position

THANK YOU!