Insertable B Layer Cooling System

Slides:



Advertisements
Similar presentations
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Advertisements

Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
N O R T H A M E R I C A C O M M E R C I A L TDP
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Operations Kendall Reeves. Past Year Commissioned new SDX1 cooling loop after removing foam insert inadvertently left inside (Denis and Joel) Commissioned.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
Michele Battistin Elena Perez Rodriguez 10 November 2010
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
FORMS OF HEAT TRANSFER. CONDUCTION CONVECTION.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Dr. Owen Clarkin School of Mechanical & Manufacturing Engineering Summary of Energy Topics Chapter 1: Thermodynamics / Energy Introduction Chapter 2: Systems.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
S A Griffiths CM42 June 2015 Electrical & Control.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
delivered with the compressor
IBBelle: Status & Plans
ATLAS ITk Baby-DEMO update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
HVAC EQUIPMENT: COOLING SOURCES (see Chapter 16)
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Detector Cooling Project WP2 CO2 activities status report
ATLAS Thermosiphon Readiness Review 17th March 2016
SPS cryogenic proximity equipment and SM18 validation
Update on the IBL vacuum flex transfer lines
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS Thermosiphon Electrical Distribution and Run Modes
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Update on the IBL vacuum flex transfer lines
EN-CV: P8 systems and Detector Cooling
Cryogenic cavern in Asian site
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Overarching Commissioning Plan
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Insertable B Layer Cooling System Services Jan Godlewski Bart Verlaat J.Godlewski PH-DT-PO IBL 15 May 2012

Power supply Water cooling Compressed air Vacuum IBL flushing J.Godlewski PH-DT-PO IBL 15 May 2012

Power supply Total need of power for IBL cooling station has been estimated to 20 kW This include: Chiller compressor Heaters Electrical and control system components We will ask for UPS for IBL cooling system Statement from Wieslaw Iwanski: Atlas has enough reserve in existing UPS to feed the 20 kW pump of the IBL cooling system. However, there is no actually possibility to connect such a circuit to existing UPS distribution as all available breakers in UPS switchboards in USA15 are already in use. Atlas will therefore order and install during the LS1 a new switchboard fed from the UPS network in USA15 to address this situation. It’s assumed that this switchboard will provide a standard monitoring of all breakers i.e. ‘on/off’  and ‘electrical fault’ sensors without possibility to turn on/off breakers by external systems J.Godlewski PH-DT-PO IBL 15 May 2012

Nitrogen flushing from gas room in USA15 J.Godlewski PH-DT-PO IBL 15 May 2012

IBL nitrogen flushing IBL will be flushed with nitrogen using existing system in USA15 gas room PH/DT Gas group will take care about additional equipment and modification in the ID flushing rack Goal is to reach dew point in IBL volume below -60 C ATLAS TC will install copper pipe between ID rack in USA15 gas room and IBL volume 8 mm OD copper pipe J.Godlewski PH-DT-PO IBL 15 May 2012

Mixed water for the chiller Chiller for IBL cooling station will have water cooled condenser Amount of water is around 20 l/min Close to proposed cooling unit location there exist piping for primary, mixed and chilled water Necessary amount of water will be taken from mixed or primary water circuit Water cooled condenser Chiller J.Godlewski PH-DT-PO IBL 15 May 2012

Vacuum and compressed air Vacuum pump for vacuum insulated transfer lines will be installed in UX15 on HS level 7. Compressed air for CO2 cooling units will be delivered from evaporative system air compressors situated in USA15 CV room. J.Godlewski PH-DT-PO IBL 15 May 2012