EYETS septa status Septa activities TE/ABT Thierry Masson

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Refurbished Booster RF John Reid October 24, 2012.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
SEPTA and spares follow-up J. Borburgh for SEpta section.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
ELENA installation progress F. Butin / ELENA collaboration.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
Report Technical Director Storage-Ring-Installation Completed
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
SMH16 eddy current septum
PS / Booster septa control
TS2 preparatory meeting
Operating the septa beyond their design specs
CT Hardware Overview and Issues
TE-MSC activities in SPS during LS2
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
Dielectric Oil Installations
ELENA installation and commissioning status
K. Foraz on behalf of OSS members
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
Planning and Installation
EC Activities Status for the LIU
n_TOF “Draft” plans for YETS and LS2
TE-ABT Activities for LS2
prepared by R.A.Barlow 30/056/2016
Possible causes for SPS ZS2 misalignment
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
SPS EN-CV Planning LS (initial draft)
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
Renovation of the 45-year old PS magnets
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EYETS 2016-2017 septa status Septa activities TE/ABT Thierry Masson 14/02/2017 EYETS 2016-2017 Septa status

CPS General maintenance Removal SMH42.3 done 8/02/2017 leak detected on SMH42.3 (removed from PS 8/2/2017) SMH42.2 (2 years run) to be refurbishment asap spare coil available (last one), ready to be chrome plated (external company) new coil has to be ordered (EN/MME) Exchange of SEH23 done, under vacuum, HV connected SMB to be re-installed after MU exchange Exchange of water filters (PS, PSB & Leir) done SEH 3M station maintenance done SMH26 First new interlock control system installed (TE-ABT-EC) Tests started today (Marco and Antoine) Exchange BESMH planned 6/03/2017 Installation SMH42.1 planned 14/03/2017 14/02/2017 EYETS 2016-2017 Septa status

CPS General maintenance LEIR extraction septum SMH40 Magnet removed from beam line for bake out (13-02-2017) Return conductors damaged Refurbishment planned in septa workshop (b.867) this week. Bake out septa wk.10 (PS), wk.12 (PSB), wk.11&12 (LEIR) according to TE/VSC 14/02/2017 EYETS 2016-2017 Septa status

Thanks to Robert, Christophe and Cédric MSE Crash Programme MSE Refurbishment (2 weeks) Magnets remove from tank in bunker 867-R-Q66 Diagnostic Length of springs Thickness of insulation spacers Check of compression added in the assembly procedure. New insulation installed Insertion of magnets in the tank Alignment in clean room 867-R-F47 Vacuum testing by TE-ABT-SE 30 000 Pulses (100 000 pulses usual): no insulation displacement observed Thanks to Robert, Christophe and Cédric 14/02/2017 EYETS 2016-2017 Septa status

SPS General maintenance MSE exchange in LSS4 (30-01-2017) MSE refurbished installed in LSS4 this morning Vacuum leak test planned this afternoon TE-VSC 14/02/2017 EYETS 2016-2017 Septa status

SPS General maintenance Cleaning water filters (x21) done Bake out (200°C) water filters ongoing To be done ZS 3M station maintenance activities Refill demineralized water from 13th March (EN-CV) Testing girders movement, flow interlocks, WinCC Need demineralized water ZS Anode/Cathode movement check (pot. cleaning) 14/02/2017 EYETS 2016-2017 Septa status

Summary EYETS progressing as planned, except: SMH40, refurbishment of return conductors started 1 MSE refurbished and installed in 2 weeks. Water filter bake out (200°C) SPS ready by the end of this week. Refurbishment of SMH42.2 started, ready by May. 14/02/2017 EYETS 2016-2017 Septa status