The DBD: Outline and Scope

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Introduction to Integrated Library Systems
After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Proposals Technical Writing. Proposals O different guises O document written by a person, business, or agency who wishes to perform a job or solve a problem.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
PREPARING REPORTS CoB Center for Professional Communication.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
7 August, 2006Gakujyutsu Sousei Monthly Meeting1 The Detector Chapter of The Detector Concept Report 学術創成定例月会議 8月7日 宮本彰也.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Summary of HEP SW workshop Ian Bird MB 15 th April 2014.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Some Issues on Detector (and MDI) R&D EURO-GDE Meeting DESY May
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
CMS Luminosity Status Report
Installation Global System
Concluding remarks E. Migneco
LCWS11 AWG9 PARALLEL SESSION SUMMARY
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Strategy Ties Behnke
Implementation Strategy July 2002
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Flooding Walkdown Guidance
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
Beam Dump outline work plan (UK perspective)
LCLS Linac Technical Design Review Charge
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
WG 2.B Integrated River Basin Management
Requests of Future HEP e+/e-Facilities
Grant writing Session II.
TECHNICAL REPORT.
V SuperB Workshop ENS May 9-11, 2007
Bridging the ITSM Information Gap
Presentation transcript:

The DBD: Outline and Scope Y. Sugimoto July 8, 2010 @DESY

RD’s guideline Draft of the guideline was distributed in May This document contains descriptions on Readers of DBD Outline of DBD Page limit Items to be included We have discussed on this document at ILD EB meetings and PEB meetings

Readers Guideline ourselves and accelerator colleagues to be confident that physics aims can be obtained, particle physicists active in other facilities, who are experienced, discerning and possibly supportive when convinced, physicists in different fields, who may be cooperative or critical, government or funding agency people who may not read details but request experts to examine. Our comment Target is not clear It is impossible to satisfy all readers by one document  Executive summary is necessary Answer from RD Main target should be the particle physicists doing other experiments Organization of volumes will be discussed including the executive summary volume and the physics volume

Outline of DBD Guideline Our comment The submitted LOI’s are good starting bases for the detailed baseline design, describing overall features of the proposed detector concepts Each LOI has physics motivation, basic strategy of the design, component description, status of component R&D, physics performance for the benchmark reactions, time schedule and rough cost estimation Some options are left to be decided after more complete R&D and performance tests The detailed baseline design needs to be advanced from the LOI to a more solid level including pre-engineering detailed designs of integration and stability requirements to convince the feasibility and performance of the detector Our comment Charge is very broad, without any details This leaves a lot of freedom to the concept groups, but also makes it harder to see the real reason for DBD Integration aspects of the detector are major difference from LOI, and should be stressed

Page limit Guideline Our comment The length should not be too long, maybe 100~150 pages Our comment Its impossible to describe “detailed” baseline design, and options for the case of ILD in such a short report There should be no page limit

Items to be included Guideline My comment Physics motivation and basic design strategy to reach the goal Detector concept and baseline design The description of each component including its feasibility and observed performance Mechanical construction including support structure (*) Installation scheme into the IR and with the accelerator Push-pull mechanism and performance, Physics simulation on the benchmark reactions Cost estimation (*) Better to have it as precisely as possible, but how detailed it should/can be needs to be discussed My comment Estimation of construction period of the detector should be made, as well as estimation of cost

Our conclusion?? There should be Executive Summary Volume which government or funding agency people can read and understand to some extent Physics case of ILC should be described in Physics Volume coordinated by physics common task group. It could include updated results of fast simulations. (This volume may be prepared earlier (spring 2012) to be used as an input to EU strategy decision(?)) ILD Volume Target readers are high-energy physicist, some of whom could be asked by governments to review the document It should convince HEP colleagues of the feasibility and performance of the detector Major difference from LOI would be the engineering aspects: integration, cabling, power supply, cooling, cryogenic for solenoid, etc, and performance at high energy (1TeV) In order to describe the detailed design of the baseline and options, there should be no page limit (balance between accelerator TDR should be considered)