EGTEI proposals for the review of the Gothenburg Protocol

Slides:



Advertisements
Similar presentations
Guidebook Progress, & Maintenance Plan Chris Dore.
Advertisements

CLRTP PMEG Third meeting, 13 & 14 March 2006, Dessau.
The Industrial Emissions Directive (IED) 2010/75/EU
Oct-2012 – Aug-2014 Budget Status (*) Tempus IDEA– 3’rd Year Budget Planning Travel cost Mobility WP4 is still an on going activity Next mobility program.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
1 EGTEI – 22 November 2011 Nadine ALLEMAND – EGTEI secretariat VOC monitoring issues in the Gothenburg Annex.
1 Emission data needs for international reporting and assessments Joint UNECE and EIONET workshop on emission inventories and projections 6-8 May 2002,
Introductory speech Jérôme BOUTANG Executive Director Centre Interprofessionnel Technique d’Etudes de la Pollution Atmosphérique Interprofessional Technical.
Development of the co-operation within the convention on long-range transboundary air pollution– St Petersburg April 2012 CITEPA – 7, Cité Paradis.
1 Towards an improved policy on industrial emissions - Impacts on the waste management industry - Marianne Wenning European Commission, DG ENV.C.4 FEAD.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
Work of EGTEI/TFTEI on Black Carbon in the framework of LRTAP Presented by the Co-Chair of Task Force on Techno-Economic Issues Tiziano PIGNATELLI (ENEA)
Feedback from the C&I Expert Panel Jeroen Kuenen & Carlo Trozzi Co-chairs of the Expert Panel on Combustion & Industry Stockholm, 3 May 2011.
Brussels, 1-2 September 2004 Improving Air Quality in the enlarged EU: Workshop on Plans and Programmes of Air Quality and National Emission Ceilings Directives.
C&I feedback to TFEIP Expert Panel meeting 14 May 2013 Jeroen Kuenen, Carlo Trozzi.
Review of practice of ELVs and other conditions setting in EU member states for non-Annex I installations Valts Vilnītis.
An Update on Activities Under the Convention SB Meeting Sept 2010 EB Meeting Dec 2010 WGSR MeetingApril 2011 Chris Dore.
Expert Group on Techno-Economic Issues (EGTEI) – Paris 04/ Expert Group on Techno-Economic Issues (EGTEI) E xpert G roup on T echno- E conomic I.
International Collaboration between Road Agencies Gregers Hildebrand, Danish Road Directorate.
1 EGTEI – 22 November 2011 Nadine ALLEMAND – EGTEI secretariat Update of the Guidance Document of the Gothenburg Protocol with information on Black Carbon.
Impact of the EGTEI proposed ELVs on Emission Scenarios UNECE Convention on Long-range Transboundary Air Pollution Modelling analysis performed by the.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
“Flexibility mechanisms” TFIEP - Stockholm, Sweden 2-3 May 2010 Andre Zuber European Commission Environment Directorate-General.
EGTEI – Expert Group on Techno-economic Issues History and organization Presented by Tициано ПИНЬЯТЕЛЛИ Co-Chairman of EGTEI ENEA (Italian Agency for New.
“Development of the Co-operation within the Convention on Long Range Transboundary Air Pollution” Karin Kindbom IVL Swedish Environmental Research.
JOINT PROJECT of Belarus, Kazakhstan and the Russian Federation Facilitating the implementation and ratification of the protocols of the Convention on.
1 Review of the Integrated Pollution Prevention and Control (IPPC) and National Emission Ceilings (NEC) Directives Marianne Wenning DG ENV, Head of Unit,
GAINS emission projections for the EU Clean Air Policy Package Work in Zbigniew Klimont Task Force on.
EGTEI – Expert Group on Techno-economic Issues Methodology for data collection Presented by Nadine Allemand EGTEI secretariat Workshop to promote ratification.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
UNECE Workshop St. Petersburg, 26 – 28 October 2009Katja Kraus, Germany1 The Heavy Metals Protocol Status and Latest Developments Katja Kraus Federal Environmental.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
Information update: EB 26 decisions (December 2008) on emissions Review/revision of the Protocols Information update: EB 26 decisions (December 2008) on.
European Union emission inventory report 1990–2011 under the UNECE Convention on Long-range Transboundary Air Pollution (LRTAP) EU LRTAP inventory team.
1 CLRTAP Gothenburg Protocol Technical Annexes IV, V, VI, VIII, X, XI EU provisional analysis of major, moderate and minor source categories WGSR 49, Geneva.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
EVALUATION HELPDESK Quality assessment of Evaluation Plans Evaluation Network Meeting 5-6 November 2015.
Fine particles: the views of the WG on Strategies and Review Richard Ballaman Chairman of WGSR Swiss Agency for the Environment, Forests and Landscape.
The current legal situation
1 EGTEI Expert Group on Techno-Economic Issues Latest news TFIAM Gothenburg 8-9 December 2005.
1 EGTEI – Expert Group on Techno-economic Issues Revision of the Annexes and Guidance Documents of the Gothenburg Protocol Presented by Jean – Guy BARTAIRE.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
WLTP Phase 2 Durability Task Force Update
Convention on Long-range Trans-boundary Air Pollution
Techno-Economic Issues
Annual Progress Report 2010 Annual Work Plan 2011
Streamlining of Industrial Emissions Reporting
TFEIP Workplan Chris Dore.
Experiences from EU Accession Countries
Support to National Helpdesks
Adaptation process of UN Regulation No. 132
Large Combustion Plant Indicators
Time table for revision of the NECD
EMEP/CORINAIR Atmospheric Emission Inventory Guidebook
J. Cofala Z. Klimont CIAM/IIASA
IPPC Review Stakeholder Hearing
United Nations Voluntary Fund on Disability (UNVFD)
Energy Statistics Compilers Manual
Passenger Mobility Statistics 11 October 2018
Activity on WFD and agriculture
DG Environment, Unit D.2 Marine Environment and Water Industry
EGTEI: Mandate & Outputs expected for 2003
Expectations of WGSR from EGTEI
News from the Convention
Adult Education Survey Anonymisation Point 6
The New Biogeographic Process General info – December 2011
Data specifications for IED Annex II Module 4
Quality of current PM emission inventories
Presentation transcript:

EGTEI proposals for the review of the Gothenburg Protocol 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

EGTEI proposals for the review of the Gothenburg Protocol According to EB decisions in December 2005, EGTEI is mandated to contribute to the review of the annexes IV, V and VIII (SO2 emissions, NOX emissions and mobile sources) To accomplish this task, EGTEI will submit to the next WGS&R a declaration of intentions 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Identified priorities Large combustion plants (annexes IV and V): Comparison of ELVs in the Protocol annexes and the last LCP directive (2001/80/CE) A check of correct transposition of the LCP directive is proposed. 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Identified priorities Cement and Claus plants (respectively annex V and IV): EGTEI has carried out studies on these two activity sectors and background documents have been elaborated. Achievable ELVs and related costs will be identified. 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Identified priorities Mobile sources (annex VIII) Road traffic: Analysis of road traffic emissions and abatement technologies is already carried out by the EU Commission. Off road vehicles: An update of the ELVs tables (completion according to last EU directives) is proposed. 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Identified priorities Titanium dioxide, stationary engines and metal industries (annexes IV and V) These sectors are not currently covered by EGTEI, since titanium dioxide and stationary engines were not identified as priority sectors to be addressed by EGTEI. An enquiry will be carried out among national experts in EGTEI to collect ELVs implemented in their respective countries, in the above sectors. The enquiry might not be exhaustive, although useful information could be provided. Emerging technologies are still under discussion (evolving of existing technologies vs time). 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Current Activities in EGTEI (2006) Survey on small combustion boilers carried out by Italy LCP: testing of the EGTEI proposal on LCP, larger than 500 MW, is currently investigated, in Sweden, new member of EGTEI, in cooperation with Norway, Finland and Denmark. Similar test on LCP could be carried out in NL but budget restrictions have to be overcome, yet. Possible extention of the wood combustion analysis to other Northern EU Contries 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept

Other issues in chapter V The following issues identified in chapter V cannot be addressed by EGTEI since they are out the area of its expertise: Sufficiency of ELVs in hot-spot areas Remaining questions 8 Month project started in December 03 With the subcontractors CITEPA for VOC sectors and ITA Wien for the workshop concept