EP Experiments safety validation process Safety Permits

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Advertisements

Ghislain Roy Safety Unit Accelerators and Beams Department CERN.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Risk Assessment – An Essential Standard
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
From Research Prototype to Production
Adverse Event Management from the HSE perspective E. Cennini / DGS-SEE EDMS Id Adverse events Workshop Creating a common understanding.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 1. Some recent views ( ) 2 Linac tunnel
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
PH Department in context Safety Officers in PH Department
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Safety Documentation Formerly an exotic unknown, today part of the work!
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
The AWAKE Safety Documentation C. ALANZEAU (editor) & Stakeholders –
Forecasts for waste and radioactive material storage A. Funken, L. Kobzeva LIU-Ions Coordination Meeting, 27/04/2016.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Electrial Safety LS2 days November 2016 AP
Cryogenic safety organisation at CERN
LIU / HL-LHC Cost and Schedule Review
Crab Cavity Technical Coordination meeting:
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Some arrangements for personnel safety 1- Procedures for access
East Area Renovation Project Team meeting # 2 – EDMS News
Safety in the Neutrino Platform Hall
Maintaining Safety Standards
Managing the Project Lifecycle
Strategy for conformity of non-standard cryogenic equipment
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Safety Documentation EHN1
Maintaining Safety Standards
East Area Renovation Project team #6 Launch safety agreement
The ELENA Safety Documentation «time to prepare the safety clearance»
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Session II: System authority for ERTMS 4RP Trackside approval
Survey on “Chargés de Consignation” Follow-up
Thomas Otto, TE Department, CERN
HL-LHC Safety Assessment Process
Planetary Protection at ESA
Engineering Waiver Management
Installation Binder / IRR – an example
Receiving Inspection on incoming goods
PSS verification and validation
Radiation Protection Handbook
Safety in the East Area Renovation Project
Stuart Birch On behalf of Protection Systems Group
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Frank Power Ergonomist (Inspector) Health and Safety Authority
Presentation transcript:

EP Experiments safety validation process Safety Permits O. Beltramello – 04.10.2017

(EP DL on DSO request with agreement of the person institute) Nomination of EXSO (EP DL on DSO request with agreement of the person institute) Experiment Collaboration EP SO Description of the experiment Brief description of the installation steps Detailed description commissioning and operation (from safety point of view) We issue a list of risks related to the experiment operation and commissioning ISIEC Initial Safety Information (EP+EXSO + Experiment) HSE unit LSA Launch Safety Agreement (HSE) List of risks and applicable standards and norms Agreement from EP department Main safety milestones to be respected Expected Safety Permit (beam, cryogenics, etc…) Instructions for installation process (IMPACTS/ PPSPS) Safety File structure Required documentation (experiment safety organisation, shifts safety organisation, patrol procedures, safety procedures, expected training , etc…

(EXSO and Experiment + EP SO Implementation of safety measures (EXSO + EP-SO) Experiment risks assessments (HSE +EP+ BE-ICS + EXSO) Technical safety validation (HSE) (based on Experiment provided documentation – EXSO – EP SO ) Experiment Safety File (EXSO and Experiment + EP SO Technical safety inspections (electrical, valves, lifting equipment,..) (HSE) Final safety inspections (HSE + EP SO + EXSO ) HSE Safety Clearance (approved by HSE) It means : Experiment follows CERN safety regulation and norms But … this is not enough to be allowed to start

(EXSO and Experiment + EP SO Assessment of safety documentation Safety organization Safety procedures (EP-SO + HSE if required) Experiment Safety File (EXSO and Experiment + EP SO Specific training (EP + other DSOs + HSE) Safety File to be approved by Complex Manager and EP DL (EP DSO ) Patrol procedures (EP +BE) Patrollers training (EP + EXSO) Experiment readiness signature on beam permit (or safety permit) (EP DSO ) Based on : HSE safety clearance + final safety inspection OK + all relevant safety procedures released + training done and delivered + patroller trained + Safety File completed and released Then … EXSO and EP-SO ensures that: safety measures are implemented performs regular safety inspections - follow up on changes

SAFETY PERMITS The safety permit addresses: facility integrity operational safety (Sûreté de fonctionnement in French) occupational health and safety environmental issues It takes into account the activities and operations foreseen for a particular stage and their associated hazards. It is a signed document composed by a list of controls signed off by the corresponding responsible persons. It constitutes permission to carry forward. A “safety permit strategy” is required at an early stage in the project. This process should involve the stakeholders concerned (DSOs, EXSOs, PSOs, HSE correspondent, etc.) and be revised regularly.  

SAFETY PERMITS Examples of existing safety permits: Beam permit (e.g. CERN beam facilities ) Hardware permit (e.g. Injectors of the PS Complex) Powering permit (e.g. LHC) Laser permit (e.g. AWAKE, ASACUSA) RF permit (e.g. LIGHT) Source permit (e.g. GIF++) Cool-down permit (e.g. LHC, Protodune cryostat) Irradiation permit (e.g. MEDICIS ) The DSOs in charge (and HSE when applicable) shall define in collaboration with the relevant stakeholders the controls and documentation relevant for the phase concerned in the lifecycle of the facility. The controls shall be adapted to the risks generated by the activity The responsible signatory person of the list of controls should be clearly defined. It must be checked that there are no overlaps in the responsibility of checks.

SAFETY PERMITS Type of controls - Equipment safety clearance technical (e.g. tests of the interlocked systems) procedural (verification that safety procedures for access, patrols, are in force) organisational (training in place and followed by the persons concerned) or in-field (e.g. safety patrols). A safety permit can be suspended or cancelled.

An example …