CHANNEL DISTRICT ACTION TEAM

Slides:



Advertisements
Similar presentations
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
Advertisements

Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
The Schwan Regional Amateur Sports Center Results of Bids and Recommendation to Award Contracts for Construction February 10, 2015 City Council Meeting.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
January 6. January 7 January 8 January 9 January 10.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
The Caxton Building. The Caxton Building, located at 812 Huron Road, was built in the early years of the 20th Century and is a landmark among the downtown.
Comparison Problems.
Benefits of Precast Concrete Sound Walls over Alternative Products Case Study June 4, 2010.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
St. Ambrose University Main Campus Planned Institutional District Application December 15, 2011.
Safe! The Renovation of a Century-old Warehouse into a Californian Ballpark Project done by Kieran Neary and Ricky Coombs.
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Project Status Project Phasing Questions 2 As of Today Project released for Bid February 7, 2011 Notice of Bid sent to 80+ Contractors on February 2,
Hit Tracker Power Projection Jim Edmonds 1-year report: 2008 Projections, using 2007 data.
Wood Construction CTC-375.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Construction Report August 18, Projects Site Improvements Track replacement and turf Generators.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
SunSatFriThursWedTuesMon January
Bond Oversight Committee Meeting Fourth Quarter 2015 January 26, 2016.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
ARCH 330 Fall 2008 Third Set Rough Carpentry Wall, Floor & Roof Systems.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
1 Redevelopment Budget Director of Redevelopment Steve Pinkerton Director of Redevelopment Steve Pinkerton.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
Economic Research Associates (ERA) Report February 17, 2004 Mark Lewis, City Manager.
FORSYTH COUNTY SCHOOLS CAPITAL PROGRAM LOCATION CONSTRUCTION PROJECT
Signage Upgrade Project 2016
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
FORSYTH COUNTY SCHOOLS CAPITAL PROGRAM LOCATION CONSTRUCTION PROJECT
Project Headlands, Phases 1 and 2
Design of a Commercial Shopping Center
Design of a Commercial Shopping Center
Multistory Office Building
Construction Report March 25, 2010.
Residential Neighborhood Program
FORSYTH COUNTY SCHOOLS CAPITAL PROGRAM
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
HHS Freshman Academy Update
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
College Council Meeting September 7, 2018
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
IFJ Town Hall Meeting May 23, 2017.
Field Photos
New White Lake Township Library
Project: 250 West Street, Columbus, Ohio
Wall and Ceiling Construction
STEEL PLATES.
Avera St. Luke’s Therapy Addition January 2012 Update
Pet Partners Team Evaluation Here.
Presentation transcript:

CHANNEL DISTRICT ACTION TEAM May 3, 2005 City Council Update

STOCKTON EVENTS CENTER Significant progress has been made on all segments of the Events Center: Off-Site Improvements Arena Baseball Stadium

OFF-SITE IMPROVEMENTS Fremont Street ( photo taken April 4) Widening has now been completed. The parking structure (on left) is on schedule for opening In the fall

OFF-SITE IMPROVEMENTS North of Fremont Parking lot on April 4. Lot was completed by end of April and now provides 187 parking spaces

OFF-SITE IMPROVEMENTS Parking lot north of the Baseball Stadium on April 13th and April 20th. The lot is now complete and provides 180 parking spaces

ARENA View of arena from the ball field on February 4

ARENA The Arena has gone from approximately 40% complete in February to approximately 50% complete in April. Progress has included: Erection of roof structural steel Installation of HVAC units Installation of risers

Erection of Roof Trusses – in early February ARENA Erection of Roof Trusses – in early February

followed by the installation of the risers ARENA Precast Rakers were installed beginning in early April… followed by the installation of the risers

ARENA The roof structural steel has been erected and installation of the HVAC units has begun

ARENA View of the arena from City Hall in April. The arena is approximately 50% complete

BALLPARK Concourses on March 29

BALLPARK Metal Stud Framing at Home Plate Concourse in February and Exterior Wall in March

BALLPARK Main and Auxiliary Scoreboards in March