After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Unit 2 Learning the Basics
December 2009 Movement & Activity Recommendations: 1.Promote & Increase Stair Usage 2.Promote Bicycle Commuting 3.Promote Walking Great Places to Work.
By: Vanessa Victor Scott Yoshida Travis Hills Lucas Sprague.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Chapter 10: Negotiating Intersections
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Midtown Alliance Capital Improvements Program
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
February 19, 2015 Design Guidelines to Accommodate Pedestrians and Bicyclists at Interchanges Draft ITE Recommended Practice: Meghan Mitman, AICP Senior.
Hawthorne & 16th Brian Marcum Chloe Ritter Collin Roughton.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Traffic Lights Road Signs Road Markings. Do Now… True or False  A stop sign is shaped like a triangle.  A broken yellow line means that you can pass.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Signs Signals and Pavement Markings
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Traffic Signals & ITS to Encourage Walking & Cycling
Lompoc Walkability Assessment September 24, 2009.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Complete Streets Training Module 4b – Designing for All Users.

Montana Driver Education and Training Traffic Control Devices and
Alabama Driver Manual Chapter 5
MD 30 (Hanover Pike) at Mt. Gilead Road
Saving the King Street Bicycle Boulevard
NASHVILLE, TN Brandon Taylor, P.E.
Bicycle Lanes for the City of Boston
STREETS, PEDESTRIANS AND BICYCLES
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Town Center Streetscape Project
North Lamar Boulevard Project
Drive Right Chapter 2 Unit 1
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Signs, Signals, Markings & Speed Limits
Pedestrian & Bicyclist Crash Analysis
Nolanville Main Street Sidewalk & Bicycle Connectivity
CHAPTER 3 Signs, Signals, and Pavement Markings
FHWA Bicycle and Pedestrian Program
Citrus Park Drive Extension
Signs, Signals and Roadway Markings
City of Wilmington Bike Plan Update
Developing a Pedestrian -Bicycle Safety Action Plan
SIGNS, SIGNALS, and MARKINGS
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Protected Bicycle Lanes Finally Pedal Their Way to KC…
lesson 2.3 ROADWAY MARKINGS
Design Standards.
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Glossary of regularly used cycling terms
Drive Right chapter 2 Thursday, June 27, 2019 lesson 2.1 TRAFFIC SIGNS
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Module 6 A 21st Century Transportation Network
Presentation transcript:

After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide

Issue 1: No connectivity for EB cyclists 5th St W Peachtree St One Way Issue 1: No safe and legal connectivity for eastbound cyclists Eastbound cyclists who wish to use the bicycle lanes along 5th St must ride against traffic on W Peachtree St for ½ block (either on the sidewalk or in the travel lanes) If we could rebuild the intersection, a contraflow bicycle lane would likely be installed, but funding for such a project is unavailable 5th St

Contra-Flow Raised Cycle Track Solution: Contra-Flow Raised Cycle Track Uses existing capacity on the wide sidewalk to accommodate southbound cyclists Very intuitive movement; most are already making same move Does not require moving curb or disturbing street trees, traffic signal mast arms or any street furniture Provides new ramps at either end of cycle track to separate cyclists from pedestrians

Signal Actuation & Detection Solution: Signal Actuation & Detection Will provide new push button accessible to eastbound cyclists waiting on new ramp to cross West Peachtree Street No need for new bicycle signal head as signal head already exists from driveway that was removed Actuates existing phase for 5th Street; does not conflict with westbound motor vehicle movement

Issue 2: Unsafe left turn for NB/WB cyclists 5th St W Peachtree St Issue 2: Northbound to westbound left turn conflicts Because of intersection offset cyclists traveling westbound on 5th St must wait for green signal and very quickly traverse intersection, crossing four travel lanes all at once, while watching for right-turning vehicles Northbound cyclists on W Peachtree St wishing to turn left must cross these four lanes while traffic is moving alongside them; carefully judging the gaps between vehicles Many elect to ride northbound on sidewalk and cross as a pedestrian 5th St

Two-stage Turn Queue Box Solution: Two-stage Turn Queue Box Cyclists traveling west on 5th St and north on W Peachtree St will use a new left-turn queue box to the right of the existing bike lane Curb will be moved five feet to the east Crossing will be marked in green paint and advanced warning signage will be installed on eastbound 5th St More experienced cyclists will still be able to make traditional left turn

(Bicycle) Signal Head Solution: (Bicycle) Signal Head Traditional small signal head will be installed facing the new queue box (no need for special bicycle signal) Will be activated by new push button accessible to westbound cyclists waiting in queue box Actuates existing phase for 5th St; conflicts with westbound motor vehicle movement May implement leading bicycle phase to allow cyclists to “claim” the intersection

Site Two: 14th St at Juniper St Area Overview North Midtown Piedmont Park Newly installed westbound conventional bike lane along 14th St; ends at Juniper St Plans for southbound bicycle lane on Juniper St Within heart of Midtown business district Piedmont Park immediately to the east Downtown

Issue: Unsafe left turn for WB/SB cyclists Issue: westbound to southbound left turn conflicts Bicycle lane will continue to the south along Juniper St; requiring a left turn Traffic signal has separate through and left-turn phases; requiring left turning cyclists to cross moving through-lane to turn left with green arrow, or Merge from bicycle lane across travel lane before intersection

Two-stage Turn Queue Box Solution: Two-stage Turn Queue Box Cyclists traveling west on 14th Street will use a new left-turn queue box past the intersection Crossing will be activated by new push button accessible to southbound cyclists waiting in queue box Actuates existing phase for driveway (motor vehicles and pedestrians) Westbound through cyclists will move into the travel lane in advance of intersection More experienced cyclists will still be able to make traditional left-turn through merging in advance of the intersection

Site Three: Juniper St b/w North & 14th Area Overview Downtown Midtown Streetscape project along Juniper Street between North Avenue and 14th Street Southbound multi-lane roadway; part of one-way couplet Intersects with a Core Bicycle Connection and three Secondary Bicycle Connections Piedmont Park

Issue 1: Appeal to interested but concerned Issue: Create a design that attracts new cyclists (especially the “interested but concerned” contingent) Currently a four-lane southbound one-way street through a primarily residential high-density neighborhood Off-peak on-street parking on both sides of street Plans for a streetscape project include adding a southbound bicycle lane using AASHTO and MUTCD standard design tools Juniper St

Buffered Bike Lane/Cycle Track Solution: Buffered Bike Lane or Cycle Track Currently proposed as a buffered bike lane with a two-foot striped buffer Discussing conversion to a one-way protected cycle track or raised cycle track; providing more protection for cyclists Have used NACTO design guide in discussions All options would provide additional horizontal or vertical separation between cyclists and nearest travel lane (vs. convention bike lane) Plan to analyze the tradeoffs of both options (comfort vs. maintenance vs. cost)

Issue 2: Entering bike lane/cycle track Juniper St Issue: Cyclists approaching Juniper St will need to turn left across travel lanes to enter new buffered bike lane or cycle track Design currently has no special accommodations for left-turning cyclists (even at Core and Secondary Bicycle Connections) Results in disconnected network 5th St

Bike Boxes Solution: Bike Boxes In discussions with designer regarding addition of bike boxes; especially at intersections with Core and Secondary Bicycle Connections Would provide protected storage area for left-turning cyclists approaching red signal (which is usually the case) Have used NACTO design guide in discussions

NACTO Guide Elements Used Example City of Atlanta Projects Bike Boxes Buffered Bike Lanes Colored Bike Facilities Intersection Crossing Markings Raised Cycle Tracks (Bicycle) Signal Heads and Actuation Two Stage Turn Queue Boxes Other City of Atlanta Projects Contra-Flow Bike Lanes Conventional Bike Lanes Two-way Cycle Tracks Shared Lane Markings

Urban Bikeway Design Guide Phase II A second of phase of the bike guide is currently under development and will look more closely at materials, more state-of-the-practice designs, and updates based on this quickly evolving field.

Q & A Joshuah D. Mello, AICP As a closing note, I encourage states, cities, and towns around the United States to use, embrace, and adopt this resource in their efforts to promote sustainable transportation in their continued effort to make cycling a mainstream form of commuter transportation in cities across America. Joshuah D. Mello, AICP Assistant Director for Transportation Planning City of Atlanta, Office of Planning jdmello@atlantaga.gov 404-330-6785