Introduction to ECC PT1 February 2011.

Slides:



Advertisements
Similar presentations
World Meteorological Organisation Use of Radio Spectrum for Meteorology: Weather, Water and Climate Monitoring and Prediction Jean-Michel Rainer.
Advertisements

World Meteorological Organisation Use of Radio Frequency bands for meteorological systems Jean-Michel Rainer.
INTRODUCTION TO ECC PT1 July Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
European preparations for WRC Stella Lyubchenko CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
Introduction to ECC PT1 November An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings)
On-Going Activities in the CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Interactive Workshop.
WRC-12 Preparation CPG Chairman /
10 th International Electronic Communications Regulators Conference 8 th May 2015 Future of mobile: 4G and Beyond Eric Fournier Chairman, Electronic Communications.
INTRODUCTION TO ECC PT1 June Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
INTRODUCTION TO ECC PT1 February Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first.
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
LONG TERM VISION FOR THE UHF BROADCASTING BAND FORECAST 2014, Shaping future broadcasting EBU, Geneva 5-6 November 2014 Session 1 – How will the UHF band.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
WRC–12 Industry Debrief 23 April 2012 Joint Task Group Domestic preparatory process.
National and International Regulatory Forces. 3 International Telecommunication Union United Nations specialized agency Based in Geneva, Switzerland.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
Third Generation Developments RADIOCOMMUNICATIONS AGENCY A presentation for the Mobile Services Committee RA2/PTN Radiocommunications Agency.
INTRODUCTION TO ECC PT1 January Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
Key results of World Radiocommunication Conference (WRC-07) DOCUMENT #:GSC13-GRSC6-12 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:GRSC 8 CONTACT(S):Kevin.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
INTRODUCTION TO ECC PT1 April ECC PT1 is the lead group on mobile in CEPT ECC PT1 is responsible for mobile broadband issues in CEPT CEPT preparation.
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
Abbreviations APT - Asia-Pacific Telecommunity ASMG - Arab Spectrum Management Group ATU – African Telecommunications Union BEM – Block Edge Mask BWA –
ECC: what we do The ECC: Brings together representatives from CEPT members (48) Develops common policies and regulations A focal point for information.
CEPT Conference Preparatory Group
1210 MHz of harmonised spectrum (ECC framework)
ITU-R activities on WRC-19 AI 1.12
broadband applications, in accordance with Resolution 233 (WRC-12)
SADC WRC-15 Preparatory Meeting
Importance of international harmonisation
Challenges and opportunities for CEPT
Activities in CEPT-ECC potentially relevant for UIC
SADC WRC-15 Preparatory Meeting
Session 1 The ECC in practice, its structure, its working process
Session 2 European Regulatory Environment (just a part!)
Thomas Weilacher Chairman ECC Working Group FM
Session 3: Major topics on Spectrum
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
CEPT ECC Vice Chairman Jaime Afonso
Broadband PPDR frequency situation in Europe
WiFi Alliance 18th October 2016 Spectrum for WiFi – ECC Actions
Frequency Regulation – Global Update for Automotive Radars
5G and IMT Identification - Views from CEPT-
Importance of international harmonisation
Alexander Kühn Chairman ECC CPG19
European Regulatory Environment (just a part!)
doc.: IEEE <doc#>
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
Doriana Guiducci, European Communications Office
European 5G regulatory developments
Introduction to ECC PT1 August 2018.
Thomas Weilacher Chairman ECC Working Group FM
CEPT ECC Vice Chairman Jaime Afonso
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Draft ICAO Position for ITU WRC-19
François Rancy Director, ITU Radiocommunication Bureau
Sergio Buonomo Counselor ITU-R Study Group 5
September 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Millimeter wave frequency allocation.
Status report from ITU-R WP 5A on ITS activities
Activities of ARIB on IMT Standards
Possible Future Agenda Items
Presentation transcript:

Introduction to ECC PT1 February 2011

An introduction to ECC PT1 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) ECC PT1 developed major UMTS/IMT-2000 ECC deliverables implemented by most CEPT countries ECC PT1 has been an active contributor to ITU-R TG 8/1, WP8F, WP5D and JTG 5-6 on IMT 1997 2000 2010 TG1 produced first ERC Decisions and developed responses to the first EC Mandates on UMTS ERC PT1 held its 1st meeting in Mainz, Germany ECC PT1 has held more than 35 meetings and continue addressing IMT matters An introduction to ECC PT1

An introduction to ECC PT1 ECC PT1 Chairmen Mr. Pasi Toivonen FICORA ERC TG1: August 1997 – October 2000 Mr. Peter Scheele BNetzA ECC PT1: October 2003 – October 2009 1997 2000 2010 Mr. Jim Connolly ComReg ERC/ECC PT1: October 2000 – October 2003 Mr. Didier Chauveau ANFR ECC PT1: October 2009 – present time An introduction to ECC PT1

Contributions – Deliverables GSM, DECT IMT-2000/UMTS CEPT administrations 20+ ECC deliverables Industry ECC PT1 International organizations 10+ CEPT Reports In average meeting: 77 participants with ~60 % representing industry 50 input documents An introduction to ECC PT1

An introduction to ECC PT1 Participants An introduction to ECC PT1

An introduction to ECC PT1 Documents An introduction to ECC PT1

An introduction to ECC PT1 CEPT Members An introduction to ECC PT1

ECC PT1 Terms of Reference ECC PT1 is responsible for the overall system aspects of IMT, collaborating with WG Frequency Management on the IMT satellite elements. In particular, ECC PT1 is mandated to: Facilitate the development of IMT, both globally and at the CEPT level. Consider the designation and frequency arrangements for spectrum, identified for IMT in the Radio Regulations. Consider the sharing and compatibility issues in support of the work under item 2. Co-ordinate positions on IMT for input to relevant ITU groups including the ITU process for the development of IMT-Advanced. Contribute to or lead the preparation of responses to relevant EC Mandates related to IMT matters as appropriate. Liaise with ETSI and other relevant bodies dealing with standardisation; On request from CPG contribute to the preparation of CEPT positions for WRCs and other relevant fora. Seek, where appropriate, contributions and assistance from and work collaboratively with relevant ECC subordinate bodies and the Office. An introduction to ECC PT1

An introduction to ECC PT1 ECC PT1 Officials Chairman Mr. Didier Chauveau, ANFR, DPSAI Tel: +33 1 45 187704 E-mail: chauveau@anfr.fr Secretary Mr. Patrick Donohue, ANFR Tel: +33 1 45 187372 E-mail: donohue@anfr.fr Vice-chairman Mr. Jaime Afonso ANACOM, DGE Tel: +351 21 721 2240 E-mail: jaime.afonso@anacom.pt Vice-chairman Mr. Pasi Toivonen FICORA Tel: +358 9 6966 853 E-mail: pasi.toivonen@ficora.fi An introduction to ECC PT1

Place of ECC PT1 within ECC Steering Group (ThinkTank) ECC ECO WG FM Frequency Management WG SE Spectrum Engeneering WG NNA Numbering, Naming Addressing WG RA Regulatory Affairs CPG Conference Preparatory Group ECC PT1 IMT Matters FM44 SE7, SE24, SE40 WRC (ECPs) ETSI SRDoc 3GPP WiMAX Forum GSM A Industry UMTS Forum An introduction to ECC PT1

ECC PT1 co-operation with external entities APT Wireless Forum (AWF) CITEL European Commission ECC PT1 ECC An introduction to ECC PT1

ECC PT1 input to the CEPT preparation for WRCs ECC PT1 has contributed to the preparation of the European Common Proposals (ECPs) for the World Radiocommunication Conferences (WRCs) on the following Agenda Items: WRC-2000: 1.6.1 1.6.2 WRC-2003: 1.22 1.33 1.34 WRC-2007: 1.4 1.9 review of spectrum and regulatory issues for advanced mobile applications in the context of IMT‑2000, noting that there is an urgent need to provide more spectrum for the terrestrial component of such applications, and priority should be given to terrestrial mobile spectrum needs, and adjustments to the Table of Frequency Allocations as necessary identification of a global radio control channel to facilitate multimode terminal operation and worldwide roaming of IMT‑2000 to consider progress of ITU‑R studies concerning future development of IMT‑2000 and systems beyond IMT‑2000, in accordance with Resolution 228 (WRC‑2000) to review the results of studies in response to Resolution 539 (WRC‑2000) concerning threshold values for non‑GSO BSS (sound) in the band 2 630‑2 655 MHz, and to take actions as required to review and revise technical, operational and regulatory provisions, including provisional limits in relation to the operation of high altitude platform stations within IMT‑2000 in the bands referred to in No. 5.388, in response to Resolution 221 (WRC‑2000) to consider frequency-related matters for the future development of IMT‑2000 and systems beyond IMT‑2000 taking into account the results of ITU‑R studies in accordance with Resolution 228 (Rev.WRC‑03) to review the technical, operational and regulatory provisions applicable to the use of the band 2 500-2 690 MHz by space services in order to facilitate sharing with current and future terrestrial services without placing undue constraint on the services to which the band is allocated An introduction to ECC PT1

ECC PT1 is the CEPT entity contributing to ITU-R WP5D Since the establishment of the ITU-R WP5D “IMT Systems” (successor of ITU-R WP8F) in January 2008, ECC PT1 has been contributing to its work by presenting the CEPT positions on the issues on the agenda of WP5D, including: Update of ITU-R Recommendations and Reports following the decisions of WRC-07 Digital Dividend (790-862 MHz for Region 1) IMT-Advanced submission and evaluation process Cognitive Radio Femtocells (home base stations) An introduction to ECC PT1

ECC PT1 inputs on behalf of CEPT to ITU-R WP8F and WP5D An introduction to ECC PT1

ECC PT1 current Work Programme ECC PT1 is currently focusing, among others, on the following issues: Update of ECC Decision (06)01 New ECC Decision on the harmonised frequency arrangements for IMT systems operating in the 3400-3600 MHz and 3600-3800 MHz New ECC Recommendations on cross-border coordination: For the 800 MHz band for Mobile Fixed Communications Networks For the 2.6 GHz band for Mobile Fixed Communications Networks Update of ECC/REC/(08)02 on cross-border coordination for UMTS and LTE/WiMAX at 900/1800 MHz Lessons learned from practical implementation of Least Restrictive Technical Conditions (BEM) in the 2.6 GHz and 3.5 GHz bands Analysis in relation with the growth of Mobile Broadband traffic An introduction to ECC PT1

The most recent information: www.ero.dk/eccpt1 ECC PT1 webpage The most recent information: www.ero.dk/eccpt1 summary of the last meeting calendar of coming meetings useful reference documents active correspondence groups Work Programme and more… An introduction to ECC PT1

An introduction to ECC PT1 For further information on ECC PT1 please refer to the ECC PT1 contacts An introduction to ECC PT1