NERC Update: Current Activities Ryan Quint, Ph.D., P.E.

Slides:



Advertisements
Similar presentations
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Advertisements

Model Validation in Western Interconnection
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Using Synchrophasors for Preventing Cascading Outages
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
The Model Validation Story 1. You’ve heard this story before August 10, 1996 Accurate and up-to-date models are needed for reliable and economic grid.
NASPI overview and update
RECENT WESTERN INTERSTATE ENERGY BOARD WORK ON RENEWABLE INTEGRATION WESTERN CLEAN ENERGY ADVOCATES JANUARY 8, 2015 BRIAN PARSONS, WESTERN GRID GROUP.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
MVWG Report to TSS February 2015 Stephanie Lu, MVWG Chair Seattle City Light.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
SMS Update NERC Synchronized Measurement Subcommittee (SMS) Ryan D. Quint, Ph.D., P.E. Staff Coordinator, NERC SMS, SAMS WECC JSIS Meeting September 22,
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Model Validation using PSS®E
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
MVWG Report to TSS May 2016 Jun Wen, MVWG Chair Southern California Edison.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
NERC Update Current Activities Ryan Quint, Ph.D., P.E. Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
2017 WECC JSIS Report March 21, 2017.
NERC: Essential Reliability Services
ISO-NE Synchrophasor Related Projects
Western Electricity Coordinating Council
The Model Validation Story
What’s new at GPA?.
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Song Wang, MVWG Chair PacifiCorp
Next Steps in Load Modeling
Reliability Assessment Committee Reliability Workshop Priorities
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
CMPLDWG Composite Model with Distributed Generation Approval
Western Electricity Coordinating Council
NERC-WECC Coordination
NASPI PMU Data Application Classification
Integration of Variable Generation Task Force (IVGTF)
Jonathan Young, SDWG Chair
Reliability Standards Development Plan
NERC LMTF Update Update on Key Topics
Andrew Christensen, SDWG Chair
NERC-WECC Coordination
NERC Reliability Standards Development Plan
Strategic Planning Process
Integration of Variable Generation Task Force (IVGTF)
2017 WECC JSIS Report March 21, 2017.
Jonathan Young SDWG Chair
Western Electricity Coordinating Council
Strategic Planning Process
WISP Follow on Reporting.
Reliability Assessment Committee Reliability Workshop Priorities
CMPLDWG Composite Model with Distributed Generation Approval
Project WECC-0100 Update Reliability Subcommittee
Standard Review Subcommittee Update
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
NASPI PMU Data Application Classification
Steve Rueckert – Director of Standards
Donald Davies Chief Senior Engineer
User Experience with New Solar PV Models California ISO
NERC OC Update Greg Park, NWPP (In place of Rich Hydzik)
NERC Reliability Standards Development Plan
SRWG Meeting 15-2 Power Plant Validation Tools
Jonathan Young, SDWG Chair
Andrew Christensen, SRWG Chair
System Review Work Group Update to TSS
Presentation transcript:

NERC Update: Current Activities Ryan Quint, Ph.D., P.E. Senior Manager, Advanced Analytics and Modeling WECC MVWG Meeting June 2017

Overview This presentation focuses on technical works related to the activities of NERC and the NERC technical committees, including: System Analysis and Modeling Subcommittee (SAMS) Power Plant Modeling & Verification Task Force (PPMVTF) Load Modeling Task Force (LMTF) Synchronized Measurement Subcommittee (SMS) Methods for Establishing IROLs (MEITF) Solar Resource Performance Task Force (SRPTF) NERC System Analysis NERC Advanced Analytics & Modeling

Modeling Notifications EX2000 GENTPJ Gas Turbine Governors Renewable Energy System Modeling Composite Load Model Benchmarking

Guideline on Integrating VER into Weak Power Systems Guideline under industry comment period

Guideline on Reactive Power Planning Available HERE

NERC List of Acceptable Models Available HERE Latest version posted, working on updated version based on feedback from last SAMS meeting Simplified, clearer version of NERC Libraries of Standardized Powerflow Parameters and Standardized Dynamics Models

Node-Breaker Representation in Planning Models Node-Breaker Modeling Proposal is available HERE Webinar materials available HERE Source: PTI Source: PowerWorld Source: Powertech

Guideline on PPMV for Synchronous Machines Source: US ACE Source: GE Source: Duke

Guideline on PPMV for Inverter-based Resources Source: First Solar Source: First Solar

MOD-025 Discussions Source: Kestrel Source: USBR Source: IESO

Load Model Benchmarking Source: EPRI Source: EPRI

DER Modeling Guidelines Guideline on Modeling DER in Dynamic Load Models – HERE Guideline on DER Modeling – under industry comment

Forced Oscillation Guideline Guideline on Forced Oscillation Monitoring & Mitigation – under industry comment

Oscillation Analysis using Interconnection-wide PMU Data Objective: understand modal characteristics of each interconnection using high-resolution, time-sync’d data Mode shape, mode frequencies, mode damping ratio Provide utility industry with better fundamental understanding of inter-area modes and forced oscillations on the BPS Use actual data to characterize system; possibly benchmark with model-based approaches Explore oscillation analysis tools available to industry Source: Montana Tech

Reference Document on Linear State Estimation Plans to develop short reference document on LSE and application to real power systems Source: SCE

PMU Data Quality and Data Sharing Guidelines SMS identified issues with “super PDC to super PDC” communications Typically between ISO/RC/BA to other ISO/RC/BA Need recommendations related to: Planned and Unplanned PMU Outages Forwarded data stream, raw versus manipulated Name changes NERC IDCODEs PMU Registry  Plans to develop ad hoc group to tackle these high priority topics.

MEITF Guideline on Establishing IROLs Instability, Cascading, and Uncontrolled Separation

MEITF - Simulating Instabilities

EI Frequency Response Analysis

NERC/WECC Inverter Task Force Blue Cut Fire Disturbance Report

NERC Solar Resource Performance Task Force Group will formalize and continue under new TF name Focus on planning-related aspects Recommended inverter performance Ride-through Momentary cessation Return to operation Phase lock loop robustness Frequency measurement stability Coordinated interconnection-wide simulations to identify any reliability risks in future Modeling capabilities and practices Seeking experts in area of inverter controls design and simulation of inverter-based resources Announcement coming soon

MOD-032 Designee Update Case Quality – working with PPMVDTF to identify how metrics will be incorporated in case creation data checks Case Fidelity – no identified fidelity issues in WECC Approved Model List – WECC list acceptable, more restrictive than NERC list

Upcoming Workshops NERC-NATF Power System Modeling Workshop June 20-21, 2017 in Oak Brook, IL (ComEd) Variable Energy Resource Modeling Workshop August 1-2, 2017 in Atlanta, GA (NERC) NERC-NASPI Forced Oscillation Workshop September 27, 2017 in Springfield, MA (joint with NASPI)

Questions?