Tim Haeberle API SC Winter Meeting

Slides:



Advertisements
Similar presentations
Imagination at work API SC6 Resource Group On Materials Plenary Meeting Report Tim Haeberle June 19, 2014.
Advertisements

API 17 A Winter session 2013 Report. API17A Formation of task groups WE ARE REQUEST ING VOLIUNTEERS FOR EACH TASK GROUP Task Group 1 Overview systems.
API Specification 6A Furnace Calibration Requirements
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
SC 18 – SC 11 Report – Field Operating Equipment Chair: Darrell Copsey, John Crane Vice Chair: TBD Secretary: Norman W. Hein, Jr., CONSOL Energy – CNX.
API SC6 Winter Meeting New Business: API Spec 6A Tensile Test Specimen Requirements Tim Haeberle 8 February 2011.
Sikorsky A United Technologies Company FAA / NASA Workshop, Chicago, IL – August 6-8, 2002 Review of FAA Material Specification Guidelines Document John.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
1 API SC6 Winter Meeting Update on CSOEM MARG Activities Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
CSOEM MARG SUMMARY 24 June Meeting Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 24 June 2015.
New Item API Specification 6A Furnace Calibration Requirements Tim Haeberle 30 June 2011.
Tim Haeberle API SC Winter Meeting
API Standard 6X: Design Calculations for Pressure-Containing Equipment
1 API SC6 Winter Meeting Other Materials Issues Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Update on the API Work Group Activities on Pipe Markings.
API Spec 6A Tensile Test Spec Reference Requirements Tim Haeberle API SC Summer Meeting.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Winter Meeting New Business: API Standard 6A718 – Inclusion of Additional Alloy 718 Strength Classes - Inclusion of Additional Alloys Tim Haeberle.
SAE G-12 Fluids Subcommittee Meeting Montreal, October 2014 Eric Villeneuve, AMIL Sponsor AMS AS5900 AS5900 Standard Update.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
Use of API 6A vs ISO in marking 6A equipment
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
SC17 Materials Initiatives 2015 Summer Meeting Update.
Tim Haeberle API SC Winter Meeting
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Reports / Updates From Task Groups / Liaisons Material Test Lab Calibration & Certification David Salgado reporting for Tim Haeberle 9 February 2010.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Supply Chain Management Report for SC 18 January 2013.
Imagination at work. Presented by Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 20 January 2016 API SC21 Austin, TX Status.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
New Business – Proposal For Approval of SR3 For Addendum to API 6ACRA
NASEM Subsea Bolt Performance Workshop A Look at Critical Operations
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloys Tim Haeberle 30 June 2011.
Carry Over From API SC6 Winter Meeting API Spec 6A Tensile Test Requirements Tim Haeberle 30 June 2011.
Updates from SC18 Summer Meeting
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloy 718 Strength Classes Tim Haeberle 30 June 2011.
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API Spec 6A Tensile Test Yield Offset Requirements
Impact on SC 6 Documents by Kenneth Young
API Standard 6X: API/ASME Design Calculations
SC6 Work Group on VR Plugs
New API Design Standard
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
Use of API 6A vs ISO in marking 6A equipment
API Summer Standardization Conference
READY?.
Specification on float equipment
WLTP Annex 4 and 7, delta cd*A
API SC 10 WG15 Stage Cementing Collars
2nd Edition: 2019 Winter Standards Meeting
SC 18 Liaison Report Winter 2012
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
API Specification 6A Keel Block Requirements New Item
CSOEM Materials Advisory Resource Group
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
API Specification 6A Keel Block Requirements
Presentation transcript:

Tim Haeberle API SC6 2012 Winter Meeting API Specification 6A Furnace Calibration Requirements Carry Over From API SC6 2011 Summer Meeting Tim Haeberle API SC6 2012 Winter Meeting

The Problem Current Wording: API Spec 6A 20th Edition, Annex M, “Qualification of heat-treating equipment”, Section M.3.3, “Temperature survey method for calibration of batch-type furnaces”, states the following in the last sentence: “When a furnace is repaired or rebuilt, a new temperature survey shall be carried out before the furnace is used for heat treatment.” The Problem: This implies a time-consuming and costly full survey is required, even for minor repairs to a furnace that will in no way affect the calibration or temperature uniformity in the furnace.

The Solution Proposal: Revise the API Spec 6A 20th Edition, Annex M, Section M.3.3 to add the following statement after the last sentence: “Repairs that return the furnace to the condition it was in at the time of the last furnace survey and calibration or repairs that do not affect the temperature tolerance of the furnace shall not require a new temperature survey and calibration.”

The Solution Justification: There is no need to perform a costly and time consuming new temperature survey and calibration after repairs that do not affect the temperature tolerance of the furnace. Other recognized industry standards for furnace calibration permit such repairs without re-calibration. These include: SAE AMS 2750D

AMS 2750D Reprinted with permission from SAE AMS2750D © 2005 SAE International

AMS 2750D Reprinted with permission from SAE AMS2750D © 2005 SAE International

API CSOEM SR3 Form Form ready for submittal No money requested

API Ballot Form ready for submittal

Action Required Send the issue to a TG set up under the Materials Resource Group for review, refinement, and submittal for approval for ballot at the API SC6 2012 Summer Meeting Or Approve for ballot at the API SC6 2012 Winter

End Of Presentation