QC Document Update Todd Shields, INDOT.

Slides:



Advertisements
Similar presentations
FHWA Qualification Requirements for Laboratories NACLA Forum February 11, 2009 Mike Rafalowski Materials Engineer Office of Pavement Technology Federal.
Advertisements

COMPANY MAINTENANCE MANUAL
VENDED PROGRAMS SFSP FY 05. What is a Food Service Management Company? Any organization (including commercial for profit companies, schools, or private.
Checking & Corrective Action
Institutional Animal Care and Use Committee (IACUC)
Monitoring the Product Production, Import, Wholesale and Retail Level Monitoring.
2014 Chip Seal Training Contract Administration Issues.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
ROAD PAVEMENT FORUM GUIDELINES ON MODIFIED BINDERS FOR USE IN HOT- MIX ASPHALT AND SURFACING SEAL APPLICATIONS.
2014 Chip Seal Training ODOT Specifications
Module 4-2 : Joint Sealing
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
QUALITY CONTROL More Makes Money Less Leads Losses
District 8-0 Winter Schools /23/2012.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
 Define a Quality Assurance Program (QAP)  Review common terminology  Discuss the fundamentals of an acceptance program  Discuss the fundamentals.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Asphalt Quality Assurance Program
Quality Assurance/Quality Control Policy
Quality Control Testing
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Update on End Result Specifications Celik Ozyildirim, Ph.D., P.E.
QUALITY CONTROL QUALITY ASSURANCE INDEPENDENT ASSURANCE
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Standards of Practice Course
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Developing a Mixture-Based Specification for Flexible Base.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Allen Hughes State Materials Office
Quality Assurance D R Rossmann South African National Road Agency Ltd.
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Recent Changes “FAQ’s” added to WMTC webpage Nuclear testing eliminated from asphalt class Correlation/comparison test results required to accompany qualified.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
2016 RAC Annual Meeting Sweet Sixteen
Update from FHWA Emulsion Task Force
Treatment of Quality in Utility Specification and Procurement of Network Equipment Trevor LUCY – IE – S1 – 1118.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Construction Management
Quality Assurance: Pay Factors and Dispute Resolution
Chip Seal Quality Assurance Guide
Emulsion Task Force (ETF)
Quality Control Personnel Training
Emulsion Task Force Meeting
Quality Assurance For Emulsion Treatments In Pavement Preservation
What is the UL QFCP? FCIA Webinar Presenters:
Good Laboratory Practices
UNDERSTANDING FOR STANDARD
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Materials and Tests Engineer
Prime Factors for Successful Preservation Treatments
Material Sampling & Handling Cameron Richardson – Vulcan Materials
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

QC Document Update Todd Shields, INDOT

Quality Assurance Document Currently is drafted for Chip Seal Intent is to be housed on TSP2’s website Broken into 2 parts: Contractor Quality Control Agency Quality Assurance and Acceptance

Contractor Quality Control General Overview of QC and Contractor requirements Reference Documents AASHTO (and other) specs and test methods 23 CFR 637 Definitions

Contractor Quality Control Personnel Opened QC Technician to “other accrediting body approved by the agency” Require TSP2 certification for: Job Foreman Agg Sreader Operator Distributor Operator Testing Facilities Recommend AASHTO Accreditation Program Allow other accrediting body approved by Agency

Contractor Quality Control QC Activities All aspects of constructing a chip seal Emphasis on Workmanship and Performance Supplier material certifications

Contractor Quality Control Aggregate Testing – Comments/Discussion! For reference, a typical 10 mile (20 lane mile) job: ~1,500 tons of aggregate ~225 tons of emulsion Gradation Required for Design 1 per day or every 1,500 tons of placement Unit Weight Every 1,500 tons of placement Bulk Specific Gravity No need to re-test thereafter Flakiness Index

Contractor Quality Control Aggregate Testing (continued) Aggregate Absorption Required for Design Every 1,500 tons of placement Fractured Faces Prior to Construction Deleterious Material

Contractor Quality Control Aggregate Testing (continued) Application Rates Verify once/day Burlap/weigh Yield checks

Contractor Quality Control Emulsion Testing – more discussion/comments! Viscosity Every 200 tons of placement What about field viscosity? Temperature Every delivery tanker Residue Demulsibility

Contractor Quality Control Emulsion Testing (continued) Sieve Every 200 tons of placement Storage Stability MSCR – every 500 tons of placement Jnr % Recovery Ductility Every 500 tons of placement

Contractor Quality Control Emulsion Testing (continued) Elastic Recovery Every 500 tons of placement Penetration Every 200 tons of placement Ash Content Just for latex modified emulsions? Solubility Just for SBR modified emulsions?

Contractor Quality Control Emulsion Testing (continued) Application Rate Verify once per day Road Plate Yield checks

Quality Control Plan Require to be submitted at least 15 days prior to construction. Requires details on: Scope – all applicable specifications QC Organization – org chart, qualifications Testing Facilities and Equipment – testing labs, equipment calibration Materials Control – sources, stockpiling QC Activities – sampling locations, methods, frequency

Quality Control Plan Requires details on (continued): Placement and Workmanship Calibration procedures Method to monitor application rates Method to ensure proper spread patterns Method to respond to problems Rolling operations Sweeping operations Method to control traffic

Quality Control Plan Requires details on (continued): Documentation – reporting procedures, sample test forms, reports Non-Conformance and Corrective Action – method to identify and corrective action

Contractor Quality Control Records and Documentation QC tests submitted to Agency within 24 hours Include supplier material certifications Compliance with Specifications Statement from Contractor that project has been constructed according to specs What do we think of this section?

Agency Acceptance Acceptance Activities Materials Agency sampling Surface Preparation Equipment operation/calibration Monitoring of application rates Post placement inspection Bleeding Stone loss Joints

Agency Acceptance Independent Assurance Pay Adjustments Rejection Sample penalty schedule for Agg and Emulsion Rejection Do we want to include a penalty schedule? Aggregate > 3.0% decant – what is a good number? Emulsion > 50 viscosity > 5.0 residue > 50 penetration

Agency Acceptance Dispute Resolution Split samples for acceptance testing Notification method

Questions??? Next Steps Once we all agree on the format and content… Expand to include other treatments Micro/Slurry Tack Coat? Ultrathin Bonded Wearing Course Questions???