Chip Seal Quality Assurance Guide

Similar presentations


Presentation on theme: "Chip Seal Quality Assurance Guide"— Presentation transcript:

1 Chip Seal Quality Assurance Guide
Todd Shields, Indiana dot Tsp2 emulsion task force

2 What is the goal?

3 What we are trying to AVOID

4 So how do we get there? Good specifications Good designs
Qualified personnel Contractor – actually running the equipment Agency – overseeing and accepting Solid Quality Assurance QA Specifications QC Plans Agency Acceptance Protocols Independent Assurance

5 ETF Quality Assurance Guide
The guide includes: Contractor Quality Control Agency Acceptance Protocols Independent Assurance Currently in DRAFT format Being reviewed/finalized by ETF

6 Contractor Quality Control Plan
Quality Control Plan is approved by the Agency Personnel Require TSP2 certification for: Job Foreman Recommend for: Agg Sreader Operator Distributor Operator Testing Facilities Recommend AASHTO Accreditation Program Allow other accrediting body approved by Agency

7 Contractor Quality Control - Aggregate
Gradation Unit Weight Bulk Specific Gravity Flakiness Index Aggregate Absorption Fractured Faces Deleterious Material Application Rates

8 Contractor Quality Control - Emulsion
Viscosity Temperature Residue Demulsibility Sieve Storage Stability Multiple Stress Creep Recovery (MSCR) Ductility Elastic Recovery Penetration Ash Content (cationic) Solubility (anionic) Application Rate

9 Contractor Quality Control Plan
Require to be submitted at least 15 days prior to construction. Requires details on: Scope – all applicable specifications QC Organization – org chart, qualifications Testing Facilities and Equipment – testing labs, equipment calibration Materials Control – sources, stockpiling QC Activities – Workmanship Materials sampling locations Test methods and Frequency Inspection and Oversight

10 Contractor Quality Control Plan
Placement and Workmanship Calibration procedures Method to monitor application rates Method to ensure proper spread patterns Rolling operations Sweeping operations Method to control traffic Documentation – reporting procedures, sample test forms, reports Non-Conformance and Corrective Action – method to identify and corrective action QC tests submitted to Agency within 24 hours Include supplier material certifications

11 Agency Acceptance Protocols
Materials Sampling and Testing Aggregate and Emulsion Testing Vendor certifications Materials Personnel Surface Preparation Surface is clean and dry Minor defects corrected Construction Procedures Equipment calibrated and functioning correctly Proper placement procedures followed Post Placement Check for any issues Bleeding, broken aggregate, raveling, joint laps, etc.

12 Independent Assurance
IA is conducted by the Agency Purpose is to Evaluate for Adequacy Personnel skills Equipment Both agency acceptance testing and contractor QC testing IA is NOT for determining if materials or processes are in spec

13 Next Steps Once we all agree on the format and content…
Expand to include other treatments Micro/Slurry Tack Coat? Ultrathin Bonded Wearing Course