Mod 186 Report Assumptions for 2013 DCMF 26 January 2009

Slides:



Advertisements
Similar presentations
Mod 186 January Assumptions No provision for TMA, Tax or Exit re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October.
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Customer Charge On behalf of all DNs 25 October 2010.
DCUSA Change Proposals Elizabeth Lawlor DCUSA Panel Secretary 15 February | Energy Networks Association - DCMF.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
SGN’s July 09 Mod 186 Report DCMF Meeting – July 27 th 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
IT 244 Week 9 Final Project Information Security Policy To purchase this material link Week-9-Final-Project-Information-Security-Policy.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
DCMF Meeting – January 26th 2009
Transmission Workstream February 2009
Transmission Workgroup 7th July 2011
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Performance Indicators
Transmission Workstream 4th July 2007
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Action 0002: Meter Error Notifications
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
UNC 0407 Analysis Scope - Update
Proposer: National Grid NTS Panel Date: 17th April 2014
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
Danishtah Parker 0621 Workgroup 26 April 2018
UNC Mod 273 – Governance of Feasibility Studies
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
Publication of Zonal Flex Data
Impacts of Project Nexus Implementation Date to AQ17
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Review of Physical Regime Times for Modification Proposal 461
Modification 0333A – implementation info
Development of Firm Monitor & GBA
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Key movements from September 17
UNC Modification Proposal 0362
Flow Swaps at NTS / LDZ offtakes
DN Interruption & Charging
Transmission Workstream 1st September 2005
Proposed Changes to UNC Section O
Mark Freeman 29th January 2007
UK Link Replacement Programme additional supporting UNC modifications
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Flat, flex, assured pressures Network Development Statement
Topic Register October 2009
Transmission Workstream, 1 Mar 07
Gas Information Review Proposal UNC 0140
Revised Tender Timescale for DN Interruption Arrangements
Mod 0489 EU Balancing Code - Information Provision changes required to align the UNC with the EU Code Debbie Brace 25th April 2014.
Presentation transcript:

Mod 186 Report Assumptions for 2013 DCMF 26 January 2009

Mod 186 Report Assumptions 2013/14 For April 2009 report need to agree 2013/14 revenue assumption Propose: Forecast Final Allowed Revenue = Previous year +RPI

Mod 186 Report Assumptions 2013/14

Mod 698 Given the satisfactory implementation of Mod 186, we propose to cease Mod 698 DN reports. Will raise UNC Mod for the removal of the reference to Distribution Networks in Appendix V-3 (referred to in Section V 5.12 and relating to Transportation Revenue Information from Mod 698). Section V 5.12 and Appendix V-3 will remain for the provision of NTS Transportation Revenue Information only.