Design Quality (30%) - 6slides Explain your key concept? (2slides)

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

Building Information Management (BIM)
IBM Business Consulting Services © Copyright IBM Corporation 2006 Unified Process March 27, 2006 Chris Armstrong.
1 Chapter 14 Embedded Processing Cores. 2 Overview RISC: Reduced Instruction Set Computer RISC-based processor: PowerPC, ARM and MIPS The embedded processor.
The BIM Project Execution Planning Procedure
What was BIM4Real? The Project.
Emerging Trends in Electronic Design and Construction April 2013.
Introduction to Interactive Media 02. The Interactive Media Development Process.
The vBuilding Process Skills Development Program.
The ingredients of effective blended learning Anne McNeill, Project Manager 5 August 2009.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Object Management Group (OMG) Specifies open standards for every aspect of distributed computing Multiplatform Model Driven Architecture (MDA)
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
© 2012 Autodesk The Devil Is In The Workflow Module 1: Successfully Plan and Implement BIM Luis Rojas Building Design Product Line Manager, Eagle Point.
Teaching Systems Analysis and Design in a Practical Way: A Collaborative Effort Between Computer Science and Business School by Ken Surendran-CS Chellappa.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Trimble Buildings An example of a business strategy dependent on 3D indoor mapping and modeling Trevor Venter & Brent Godfrey November 2013.
University of Southern California Center for Systems and Software Engineering Individual Research Presentation CS 577b Software Engineering II.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Basic Concepts Key Learning Points : The objectives of this chapter are as follows:  To provide an introduction to the basic Concepts of enterprise architectures,
Page 1 / DI Martin Moesl, M.A. Univ. Prof. DI Dr. Arnold Tautschnig Determining and controlling of the Life-Cycle-Yield in an early planning.
Giving Presentations Hey-Jin Lee WMN Lab. - Writing for Computer Science -
Sponsored by: Creating momentum in the project and business Tony Bassett - ECS.
© 2011 Autodesk Autodesk ® Sustainability Solutions Buildings and Infrastructure Name Title.
CS491/691: Introduction to Aerial Robotics YOUR TEAM NAME YOUR TOPIC TITLE (CONTROL, ESTIMATION, ETC)
Sponsored by: #BIM15. Sponsored by: BIM – Do we need it? Tony Bassett - ECS.
Roles for xxx Team Developer Sample Text Singapore Organisation Pte Ltd M&E Consultant Sample Text Singapore Organisation Pte Ltd International BIM Competition.
DEVRY CIS 339 iLab 4 Sequence, Communication, and State Diagrams Check this A+ tutorial guideline at
Build Smart for a Future Ready Singapore
Rapid Launch Workshop ©CC BY-SA.
OCTOBER 2016 International BIM Competition 2017
The Strategic Role of Information Development in Continuous Delivery
Component and Deployment
Design Quality (30%) - 6slides
The Business Model definition
The Perfect Business Plan.
Community Tennis Network
REQUIREMENT ANALYSIS AND DESIGN RESEARCH DESIGN AND IMPLEMENTATION
1.Introduction to Rational Unified Process (RUP)
Figure 21: The HR Wheel HR Practices Guiding Principles
The HBF Skills Strategy John Slaughter
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
CORPORATE LEARNING COURSE Seminar -- Best Practices
CORPORATE LEARNING COURSE Seminar -- Best Practices
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
 BIM Training across the AEC industry is continuing apace. Students and professional need to acquire skill- based training and knowledge to meet the.
OCTOBER 2016 International BIM Competition 2017
Capital Investment Network Update on hub Programme
Communication and Consultation with Interested Parties by the RB
Chapter 2 Analysing business strategy: creating value
Design Quality (30%) - 6slides
© 2010 Emerson Human Capital Consulting, Inc. All Rights Reserved.
Project sponsor: {insert name} Project team: November 2017
Y12 Transition Project AS Computer Science Free Powerpoint Templates.
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
There is a significant amount of diversity across the 38 rural councils in terms of the challenges faced, as well as capacity, resourcing and uptake.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
DBIA Manual of Practice
Somerset Berkley Regional High School
Somerset Berkley Regional High School
BIM for Design Collaboration
CIC BIM Competition Presentation Template & Content Guide
The Business Model definition
Presentation Template
Topic 1: Introduction to the Module and an Overview of Agile
[Your Name]’s Trip to [country] with Engineering Ministries International Insert picture of you in-country here. Tell a quick teaser story of your.
Agenda Start with Why What Are Best Practice Frameworks, and Why Do We Need Them? Best Practices Defined Lean, Agile, DevOps and ITSM/ITIL 4 The Increasing.
Y12 Transition Project AS Computer Science Free Powerpoint Templates.
SWOT Analysis Template
CS 514 Class presentation template [Replace it with the title of your project] Xiaowei Yang.
Presentation transcript:

International BIM Competition (IBC) 2016 - Presentation Template & Content Guide Design Quality (30%) - 6slides Explain your key concept? (2slides) How did you meet the Design Challenges with computational approach? Sustainability, Constructability & Productivity (3slides) How BIM helped – collaboration and design aspects? (1slide) Design for DfMA (40%) - 8slides What are the principles used in DfMA with Computational design? (1 slide) What are the rationality to reach the optimized solution from computer automated options? (1 slide) What are the tools applied during the design processes? (1slide) How did the Software and digital Tools affected your design approach, solutions and communication processes? (2 slide) What are the design strategies in terms of architectural /Structural and MEP Services considerations for DfMA? (3slides) Project Delivery (30%) - 5slides What are the key challenges and considerations for construction, site planning and management? (1 slide) Site Planning Analysis diagram (1slide) Cost Estimation (1slide) Overall Program – time and tasks (1slide) Construction sequence (1slide) Conclusion (Summary) - 1slides What are the learning outcome and output? (1slide) Team Name from School Name Developer: First Name | SurName Architect: C&S Consultant MEP Consultant Project Manager: Builder: Quantity Surveyor: Specialist: