FRESCA2 Update on the dipole design and new calculations

Slides:



Advertisements
Similar presentations
Mechanical Design & Analysis Igor Novitski. Outlines Electromagnetic Forces in the Magnet Goals of Finite Element Analysis Mechanical Concept Description.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
NED Project P. MANIL – CEA/IRFU/SIS – Short Model Coils meeting #18 – 25/01/2008 – slide 1/18 SHORT MODEL COILS PROGRAM SMC meeting #18 Pierre MANIL CEA/IRFU/SIS.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting Racetrack Coil Fabrication
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
MQXC Nb-Ti 120mm 120T/m 2m models
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
TQS Overview and recent progress
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Fiber optic sensors integration in magnets and in test facilities
ESAC Review February 2013 CEA Saclay
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
16 T Cosq DIPOLE Mechanical Analysis
ERMC/RMM activities May 2017
J.C. Perez on behalf of SMC collaboration team J.C. Perez
Mechanical Modelling of the PSI CD1 Dipole
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
Insert - dipole common issues
Block design status EuroCirCol
SMC Design overview of the construction and project issues
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
P.Fabbricatore & S.Farinon
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA2 - Coils 1+2 scenario
as a prototype for Super c-tau factory
Cross-section of the 150 mm aperture case
Presentation transcript:

FRESCA2 Update on the dipole design and new calculations EUCARD - WP7- HFM Collaboration Meeting LASA Milano Jorge Enrique MUÑOZ GARCIA September 18th, 2012 EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Introduction: related projects SMC RMC FRESCA2 Short Model Coil 12.5 T peak field on the coil @ 1.9K Weight: 2 double pancake racetrack coils mounted in a bolted steel structure composed of 2 horizontal and 2 vertical pads, to obtain a “coil pack” Fe yoke / Al shell: 20 mm thick Race-track Model Coil 16 T peak field / 18.3kA Weight: 2 double pancake racetrack coils mounted in a bolted steel structure composed of 2 horizontal and 2 vertical pads, to obtain a “coil pack” Fe yoke / Al shell Øout = 0.570m Facility for the REception of Superconducting CAbles 13 T bore field / 10.8kA @ Ø100mm aperture Weight: 10 t Block-type coil design with flared ends: 4 double-pancakes, Bladder-and-key type of structure Fe yoke / Al shell: 65 mm thick, Øout = 1.030m Magnet length: 2.255 m Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Introduction: magnet overview FRESCA2 Cross-section Target: 13 T / Ø100 mm bore Ø1.030 m; length: 2.255 m Al shell, 65 mm thick, 1.6 m long Iron yoke Holes for 4 Al-axial rods Horizontal stainless steel pad 3 bladders 2 load keys (1horizontal, 1vertical) Iron / Ti central post Vertical iron pad 2 bladders, 2 load keys Auxiliary bladders between yokes 4 double-layer coils

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Dummy coils: replacements of coils FRESCA2 Cross-section Al block Replacement of coils & pole by 2 Al-blocks dummy-coils Mechanical test of the structure: at room temperature (warm) at cryogenic temperature (cold) Instrumentation (strain gauges): Aperture (dummy-coils) Shell Rod Qualification of the structure Validation of the assembly process Validation of the FEM model Al block EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Instrumentation: strain gauges FRESCA2 Rods Shell Dummy-coil EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FRESCA2 dummy-coil: FEM model components Rod [Aluminum] Shell [Aluminum] Yoke [Iron] Key-v [stainless steel] Pad-h [stainless steel] Key-h [stainless steel] Yoke [stainless steel] Pad-v [Iron] Shim-in [G10] Pad-v [stainless steel] Shim-mid [G10] Dummy [Aluminum] End-plate [Nitronic] solid95 3D 20-node structural solid element (brick) conta174 3D 8-node surface-to-surface contact targe170 3D target segment friction = 0.2 everywhere that components come into contact with each other EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 2D dummy-coils Outside shell 90° Outside shell 45° Outside shell 0° Cross-section at the middle of FRESCA2 dummy aperture Comparison of stress during assembly & cool-down: FEM simulation vs. strain gauges measurements EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 2D dummy-coils Outside shell FRESCA2 dummy 2D model Cross-section at the middle of FRESCA2 dummy aperture Comparison of stress during h-bladder operation: Peak stress outside the shell: 50MPa Peak compression in the dummy-aperture: 120MPa EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 2D dummy-coils Outside shell FRESCA2 dummy 2D model Cross-section at the middle of FRESCA2 dummy aperture Comparison of stress during v-bladder operation: Peak stress outside the shell : 25MPa Peak compression in the dummy-aperture : 30MPa EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 2D dummy-coils Outside shell FRESCA2 dummy 2D model Cross-section at the middle of FRESCA2 dummy aperture Comparison of stress during key operation: Peak stress outside the shell : 30MPa Peak compression in the dummy-aperture : 75MPa EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 2D dummy-coils Outside shell FRESCA2 dummy 2D model Cross-section at the middle of FRESCA2 dummy aperture Comparison of stress during cool-down: Peak stress outside the shell : 120MPa Peak compression in the dummy-aperture : 200MPa EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 3D dummy-coils shell FRESCA2 dummy 3D model dummy Key operation Comparison of stress during key operation: Peak stress outside the shell : 30MPa Dummy peak compression: 75MPa EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 3D dummy-coils shell FRESCA2 dummy 3D model dummy Rod pre-tension Comparison of stress during rod pre-tension: Peak stress inside the shell @90° Dummy stress concentration at the straight section EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 3D dummy-coils shell FRESCA2 dummy 3D model dummy Cool-down Longitudinal location of strain gauges Comparison of stress during cool-down: Peak stress inside the shell @0° Dummy stress concentration at the straight section EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses: FRESCA2 3D dummy-coils vs. superconducting coils coil pack end shoes rails coils coils Vs. dummy pole wedge dummy Cool-down Rod pre-tension Comparison of stress during cool-down: Peak stress outside the shell @0° Dummy stress concentration at the straight section EUCARD - WP7- HFM Collaboration Meeting LASA Milano

FEM model: assembly process Expected stresses during the assembly process * Stress in the compression system: Aluminum rod longitudinal average stress: 160MPa @RT 225MPa @cryogenic End-plate stress within yield stress limits* EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano Cases of study FRESCA2 dummy-coils Coils replaced by a block (this presentation) Validation of the assembly process Validation of the model: comparison with the strain gauges measurements FRESCA2 superconducting coils FRESCA2 mech FRESCA2 wedge (contact), overall friction FRESCA2 wedge (no contact), overall friction FRESCA2 wedge (glued, no contact) FRESCA2 wedge (glued, contact) EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano outline Introduction: related projects & magnet overview Dummy-coils: replacement of superconducting coils Instrumentation: strain gauges FEM model: expected stresses during the assembly, pre-load, and cool-down FEM model: cases of study Work in progress EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano Work in progress 3D FEM model: Updating of geometries: Update Ørod in the dummy-coil model Wedge geometries Analysis & comparison of the results Different cases of study Instrumentation of the structure: Strain gauges on dummy aperture at 90°, 45° Strain gauges on rods EUCARD - WP7- HFM Collaboration Meeting LASA Milano

EUCARD - WP7- HFM Collaboration Meeting LASA Milano Thank you EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: rotating device @ 927 ½ yoke weight ≈ 2400 kg Shell weight ≈ 860 kg Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: table @ 927 Yoke and shell will be transported to an assembly table The assembled parts will be rotated to horizontal position bearing rollers will be used to slide the coil-pack into the yoke aperture The Al-block will be transported to the assembly table (Coil-pack weight ≈ 2000 kg) Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: ½ Yokes centring @ 927 Two bladders will be used to push the ½ yokes towards the shell inner radius to allow gap keys insertion Insertion of the keys in between the ½ yokes Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: table @ 927 3 vertical bladders will be used to lift the coil-pack and remove the rollers Temporary keys will be inserted to center the coil –pack into the yoke aperture Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: horizontal bladder operation @ 927 Horizontal bladders insertion Pumping horizontal bladders & insertion of horizontal keys Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano

Assembly process: vertical bladder operation @ 927 Pumping vertical bladders & insertion of vertical keys Final configuration after loading operation Mechanical test Room temperature Cold-down Juan Carlos Perez “Fresca2 construction status, assembly procedures, tooling and test facilities” EuCard-WP7-HFM 9th Collaboration Meeting EUCARD - WP7- HFM Collaboration Meeting LASA Milano