Test Monitoring Center Report to the Mack Test Surveillance Panel

Slides:



Advertisements
Similar presentations
IIIG LTMS V2 Review. LTMS V2 Review Data Summary: – Includes 285 Chartable reference oil results from all test laboratories – Most recent chartable reference.
Advertisements

ESEA Waiver Update. 1. Extend our current ESEA Waiver another year. 2. Respond to our current conditional “high risk” status. 3. Respond to our Fall 2013.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Controls & Monitoring Schedule J. Leaver 02/11/2009.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.
08/02/011 Statistical Summary of the Mack T10 Precision/BOI Matrix.
TEI has received 21 skids of liners from Federal Mogul. Our original order was for 19 skids. The additional 2 skids were part overrun pieces and TEI decided.
Analysis of the ISM Matrix Draft 3 November 5, 2004.
CPD Report Mack Surveillance Panel May 2, 2012 Mack T-11 / T-12 / T-8 Test Kit Hardware Inventory Update Inventory of Mack Engine Miscellaneous Parts Connecting.
MSA Five Star 4-Gas Monitor Air Monitoring Instrumentation.
Mr. Dennis Dudek Deputy Director C&T Defense Supply Center Philadelphia.
© Chevron 2008 ASTM PCEOCP VID Matrix Design and Funding Subgroup September 4, 2008 Detroit, MI.
Formulae For each severity adjustment entity, X i = i th test result in original units in end-of-test order T i = i th test result in appropriate units.
Mack T12 Engine Test Update
Mack T-12 Precision Matrix Preliminary Analyses Presented to T-12 Task Force October 11, 2005 Jim Rutherford (510)
1 The Second Addition of LTMS (Theoretical Sneak Peak for the VG) VG SP: May 2010.
Lubricant Test Monitoring System (LTMS) Quick Deck Draft 3 March 2, 2012.
Mack T-12 Pre-Matrix Data Analyses Version 3 Presented to T-12 Task Force March 17, 2005 Jim Rutherford (510)
CPD Report Mack Surveillance Panel September, 2005.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
An Overview of Software Testing By Kay E. Duchesne.
JACTest Monitoring Center Test Monitoring Center Report to the Mack Test Surveillance Panel June 17, 2002 Montreal.
© 2009 Chevron Oronite Companies. All rights reserved. New Liner and Ring Batch Effects in the Mack T-12 Presented to Mack Surveillance Panel Conference.
ISM Test Development Task Force Report June 21, 2004.
Reviewing Reports. Can you match them from memory? Definition (Listen and write) Introduction The facts which have been discovered. Findings Practical.
Introduction to working with others. Effective communication for work.
Elasticity of Supply Unit 5.4. Elasticity and Supply Elasticity with supply works just like elasticity with demand. Suppliers look at the amount of change.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
JACTest Monitoring Center T-10 PB Ad Hoc Task Force Report to the Mack Test Surveillance Panel September 10, 2004 Richmond, VA.
© Chevron 2008 ASTM PCEOCP VID Matrix Design and Funding Subgroup April 25, 2008 Teleconference.
ASTM TECHNICAL GUIDANCE COMMITTEE Semi-Annual Report Presented by William A. Buscher III Updated March 6, 2016.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Draft 08/06/01 jar1 Draft Addendum to the Statistical Summary of the Mack T10 Precision/BOI Matrix Including IR Oxidation.
1 CAA 21 th Cross Calibration Meeting, Leiden, th Mar 2015 CAA Cross Cal Meeting Mar 2015 Automated Pipeline Processing.
Mack Surveillance Panel
Mack T-11Severity Jim Rutherford
Test Monitoring Center Report to the Mack Test Surveillance Panel
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Heavy Duty Engine Oil Classification Panel
Compliance Report to ERCOT BOD December 2006
Technical Guidance Committee Report
XT Camera Firmware Update Process
3-8 ELA & MATH AND REGENTS PRESENTATION
Formulae For each severity adjustment entity,
Role of Fuel Pump Relay (FPR) in Fuel Delivery System in an Automobile
SKANSKA Backup Water Supply – Lessons Learned
Statistical Summary of the Mack T10 Precision/BOI Matrix
Agenda Introduction and membership
Caterpillar C13 Matrix Data Analysis
Presentation Title Goes Here
LTMS Task Force Statistics Subgroup Report to Joint LTMS Open Forum
Caterpillar C13 Test Matrix Update
Test Monitoring Center Report to the Mack Test Surveillance Panel
Punch items for LTMS Version 2 Surveillance Panel Consideration
2017 Exploration & Production Winter Standards Meeting
AESS Board of Governors Meeting
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
مديريت موثر جلسات Running a Meeting that Works
DSP Main Loop (Concept)
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
Monthly Production from NCS 2018 compared with prognosis and 2017
Course Outline Highlights
Next Steps / Ongoing Collaboration
RFC Short Term Path Request developments
Cont’ of setting the right stock levels.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
AP ECONOMICS: April 12 --Loanable Funds Market Quiz (HO)
Community Library Services – Conditional Grant Presentation to the Select Committee on Appropriations Presenter : Edgar Sishi | National Treasury.
Welcome to CBCS Custom Networks
Presentation transcript:

Test Monitoring Center Report to the Mack Test Surveillance Panel June 18, 2007 Miami, FL

T-8 Reference Oil Testing Summary T-8 Test Activity Low Labs: 3 active, 2 calibrated Stands: 4 active, 3 calibrated TMC 1005-2 is now the reference oil

T-11 Reference Oil Testing Summary T-11 Test Activity Low Labs: 4 active, 3 calibrated Stands: 5 active, 4 calibrated Oil 820-3 has been introduced

T-11 Reference Oil Update TMC 820-3 9 tests 8 passes, 1 fail (mild on Soot at 12) 10th test is currently running TMC requests conference call

T-12 Reference Oil Testing Summary T-12 Test Activity Low Labs: 6 active & calibrated Stands: 9 active & calibrated

T-12 Reference Oil Testing Summary Test targets may need updating N = 24 Sure to require significant discussion CLW issues from matrix Boost spec Oil supply

T-12 Reference Oil Summary Oil 821 (PC-10E) TMC supply is exhausted Waiting on reblend from supplier Target delivery to TMC is late June Labs may be caught short of oil

T-12 Reference Oil Summary As necessary TMC will Use oil 820-2 Use calibration extensions

ADDENDUM: Comparison of T-10A and T-11A MRV (cP) Results Oil Test N Mean Std. Dev. 820-2 T-11A 89 15360 1355 T-10A 51 13154 584