FIRST QUARTERLY REPORT ON THE EXPENDITURE FOR 2016/17

Slides:



Advertisements
Similar presentations
DBE STRATEGIC AND ANNUAL PERFORMANCE PLANS PALIAMENTARY PORTFOLIO COMMITTEE ON BASIC EDUCATION MEETING 17 MARCH
Advertisements

Department of Higher Education and Training PERFORMANCE INFORMATION ON PRE-DETERMINED OBJECTIVES AND BUDGET (October 2013 to December 2013)
FOURTH QUARTERLY REPORT ON THE PERFORMANCE OF THE DEPARTMENT IN MEETING ITS STRATEGIC OBJECTIVES FOR 2013/14 Presentation to the Portfolio Committee on.
DIVISION OF REVENUE BILL VOTE 16: HIGHER EDUCATION AND TRAINING Presentation to Standing Committee on Appropriations 26 February 2010.
Department of Basic Education ANNUAL PERFORMANCE PLAN 2012/13 & BUDGET REVIEW Presentation to the Portfolio Committee on Basic Education CAPE TOWN 20 March.
DINALEDI CONDITIONAL GRANT: RD QUARTER PERFORMANCE.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
DEPARTMENT OF BASIC EDUCATION Presentation to the Standing Committee on Appropriations 16 August
1 Department of Education Presentation to Standing Committee on Appropriations: Expenditure and Budget Implementation for the First Quarter of 2009/10.
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
IQMS PROGRESS REPORT 2011/12 PORTFOLIO COMMITTEE 06 November 2012.
DEPARTMENT OF CULTURE, SPORT AND RECREATION MPUMALANGA PROVINCE COMMUNITY LIBRARY CONDITIONAL GRANT 2011/12 FINANCIAL YEAR 1.
Portfolio Committee on Basic Education 26 May 2015 FOURTH QUARTERLY REPORT ON THE PERFORMANCE OF THE DEPARTMENT IN MEETING ITS STRATEGIC OBJECTIVES FOR.
VOTE 15: BASIC EDUCATION DBE Presentation to the Standing Committee on Appropriations 03 September 2014.
NORTHERN CAPE EDUCATION DEPARTMENT CONDITIONAL GRANTS EXPENDITURE AND PERFORMANCE 24 August 2010.
DEPARTMENT OF WOMEN 3 RD QUARTER PERFORMANCE REPORT PRESENTATION TO PORTFOLIO COMMITEE ACTING DIRECTOR – GENERAL MS OHARA DISEKO 2.
2016/02/17STANDING COMMITTEE ON APPROPRIATIONS 1 NATIONAL DEPARTMENT OF HEALTH PRESENTATION TO STANDING COMMITTEE : APPROPRIATIONS 12 AUGUST 2009.
1 PRESENTATION TO THE SELECT COMMITTEE STRATEGIC PLAN AND BUDGET AND OPERATIONAL PLANS
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Portfolio Committee on Basic Education 11 August 2015 FIRST QUARTERLY REPORT ON THE PERFORMANCE OF THE DEPARTMENT IN MEETING ITS STRATEGIC OBJECTIVES FOR.
1 FOURTH QUARTERLY REPORT ON THE PERFORMANCE OF THE DEPARTMENT IN MEETING ITS STRATEGIC OBJECTIVES FOR 2012/13 Presentation to the Portfolio Committee.
BRIEFING TO PARLIAMENTARY PORTFOLIO COMMITTEE ON BASIC EDUCATION 05 APRIL 2016 DBE STRATEGIC AND ANNUAL PERFORMANCE PLANS 1.
FIRST QUARTERLY REPORT ON THE PERFORMANCE OF THE DEPARTMENT IN MEETING ITS STRATEGIC OBJECTIVES FOR 2016/17 Portfolio Committee on Basic Education 23 August.
Portfolio Committee on Basic Education 8 NOVEMBER 2016
DBE STRATEGIC AND ANNUAL PERFORMANCE PLANS
Agenda Summary of performance Q2 & Q3
Standing Committee on Appropriations Quarter 3 Expenditure 2012/2013
BUDGET AND OPERATIONAL
FOURTH QUARTERLY REPORT ON THE EXPENDITURE FOR 2015/16
DEPARTMENT OF EDUCATION FOR 2009/10
QUARTER 2 OF THE 2015/16 FINANCIAL YEAR
Portfolio Committee on Basic Education 23 August 2016
Presentation to Portfolio Committee on Economic Development QUARTER /15 FINANCIAL REPORT 2 September /05/15.
IN MEETING ITS STRATEGIC OBJECTIVES FOR 2011/12
Presentation to the Portfolio Committee on Basic Education
PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATION
STANDING COMMITTEE ON APPROPRIATION
PERFORMANCE INFORMATION ON PRE-DETERMINED OBJECTIVES AND BUDGET
DBE QUARTERLY PERFORMANCE PROGRESS REPORT PORTFOLIO COMMITTEE MEETING
PRIORITISED NATIONAL DEPARTMENTS 2016/17 4TH QUARTER Presentation to the Standing Committee on Appropriations by Phelelani Dlomo and Musa Zamisa.
National Department of Health Presentation to the Standing Committee on Appropriations Public Hearings on the Adjustments Appropriation Bill 05 November.
Early Childhood Development Delivery – one year later
REVIEW AND IMPROVEMENT OF PED REPORTING SYSTEMS
PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT ANNUAL PERFORMANCE REPORT OF THE COMPENSATION FUND FOR THE FINANCIAL YEAR
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
Presentation to the Standing Committee on Appropriations
LDOE ROUND-TABLE PRESENTATION Portfolio Committee on Basic Education
DBE ANNUAL PERFORMANCE PLANS AND BUDGET 2017/18
CO-ORDINATION OF SECTOR INDICATORS
BASIC EDUCATION 2018/19 ANNUAL PERFORMANCE PLAN
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
27 November 2018 PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE ON APPROPRIATION 16 MAY 2018 MANCO.
Expanded Public Works Programme (EPWP) for the Social Sector – Conditional Grant Presentation to the Select Committee on Appropriations | National.
SELECT COMMITTEE ON EDUCATION AND RECREATION
SELECT COMMITTEE ON APPROPRIATIONS 11 August 2010
Department of Higher Education and Training
PRESENTATION TO THE PORTFOLIO COMMITTEE – EXPENDITURE AS AT 31 MARCH JUNE 2013.
1st QUARTER CONDITIONAL GRANTS SPENDING
Basic Education Supplementary Presentation: National &Provincial Education Expenditure Trends and Projections Presentation by Dept of Basic Education to.
PRESENTATION ON 2ND QUARTER PRELIMINARY PERFORMANCE REPORT (2015/2016) BY CDC: STRATEGIC MANAGEMENT 18 November 2015.
DEPARTMENT OF EDUCATION NORTH WEST MID-TERM PROVINCIAL BUDGET REPORT
PRESENTATION TO THE STANDING COMMITTEE ON APPROPRIATION
DEPARTMENT OF HIGHER EDUCATION AND TRAINING
Select Committee on Appropriations Dinaledi Schools Grant, 3rd and 4th quarter Expenditure /13 Presenter: Edgar Sishi | Chief Director – Provincial.
PUBLIC HEARING ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE
Presentation to the Standing Committee on Appropriation
PRESENTATION ON THE CONDITIONAL GRANT TO THE SELECT COMMITTEE
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT Fourth Quarter Report
BRIEFING ON THE ADJUSTMENT APPROPRIATIONS BILL BASIC EDUCATION
Presentation transcript:

FIRST QUARTERLY REPORT ON THE EXPENDITURE FOR 2016/17 STANDING COMMITTEE ON APPROPRIATIONS 13 SEPTEMBER 2016

PRESENTATION OUTLINE PART A: Areas of Under expenditure PART B: Performance Indicators and Targets & Areas of Under-performance PART C: Service Delivery Implications from Slow Spending: Kha Ri Gude Campaign.

PART A Q1 Expenditure Report for 2016/17 & Areas of Under expenditure

Expenditure as % of Appropria-tion ALLOCATION AGAINST ACTUAL EXPENDITURE PER PROGRAMME FOR THE 2016/17 FINANCIAL YEAR Programmes 2016/17 Expenditure as % of Appropria-tion APROPRIATION ACTUAL EXPENDITURE VARIANCE R’000 Administration 377 893 99 991 277 902 26.46% Curriculum Policy, Support and Monitoring 1 936 100 264 818 1 671 282 13.68% Teachers, Education Human Resources Development and Institutional Development 1 163 742 753 487 410 255 64.75% Planning, Information and Assessment 12 500 176 3 889 932 8 610 244 31.12% Educational Enrichment Services 6 291 684 2 056 296 4 235 388 32.68% Total 22 269 595 7 064 524 15 205 071 31.72%

DEVIATIONS AND REASONS Programme 2: Curriculum Policy, Support and Monitoring The bulk of the budget allocation in this programme is in respect of workbooks and Kha Ri Gude Literacy Campaign. The printing of the 2017 volume 1 workbooks is currently in progress and the delivery is expected to commence during September 2016. The expenditure will improve in the second and third quarters of the financial year when invoices have been received and paid. The start of the Kha Ri Gude classes in the second quarter will also influence the spending on this programme. Programme 3: Teachers, Education Human Resources Development and Institutional Development The high spending in this programme is mainly due to the transfer of the Funza Lushaka Bursary Scheme made in April 2016 to NSFAS which is allocated the bulk of the funds of the programme. The remainder of the allocation on this transfer will be made during January to cover for the registration fees of 2017 academic year. Programme 4: Planning, Information and Assessment The deviation is due to the transfer payments of the Education Infrastructure Grant which is made in 2 tranches in the first quarter. The first and second transfer payments of the Education Infrastructure Grant to Provinces have been made according to the approved payment schedule.

ALLOCATION AGAINST ACTUAL EXPENDITURE FOR THE 2016/17 FINANCIAL YEAR ECONOMIC CLASSIFICATIONS 2016/17 Expenditure as % of Appropriation APPROPRIATION ACTUAL EXPENDITURE VARIANCE R’000 Compensation of Employees 402 112 100 543 301 569 25.00% Examiners and Moderators 21 794 1 009 20 785 4.63% Transfers to Public Entities 1 162 484 760 198 402 286 65.39% Other Transfers 89 492 20 630 68 862 23.05% Conditional Grants 16 212 997 5 687 238 10 525 759 35.08% Schools Infrastructure Backlogs Indirect Grant 2 374 867 176 184 2 198 683 7.42% Earmarked Funds 1 171 605 53 696 1 117 909 4.58% Departmental Operations 67 226 26 452 40 774 39.35% Office Accommodation 174 922 42 231 132 691 24.14% Projects 592 096 196 343 395 753 33.16% Total 22 269 595 7 064 524 15 205 071 31.72%

DEVIATIONS AND REASONS Examiner and Moderators The expenditure on examiners and moderators will reach its peak during the year end examinations. The spending on examiners and moderators is influenced by the Grade 12 examinations later in the year. School Infrastructure Backlog grant The deviation is due payments in respect of ASIDI projects. The process of rationalisation for schools had an impact on the spending trends for the ASIDI project. The consultation on rationalisation of schools has been completed in some areas.. Earmarked Funds The printing of the 2017 volume 1 workbooks is currently in progress and the delivery is expected to commence during September 2016. The printing of the 2017 volume 1 workbooks is currently in progress and the delivery is expected to commence during September 2016. The expenditure will improve in the second and third quarter of the financial year when invoices have been received and paid. Projects The bulk of the allocation on this item is in respect of the Annual National Assessment and Kha Ri Gude. These projects were previously earmarked projects. The appointment of the examination panels for 2016/17 cycle on the development of the ANA diagnostic tests has been finalised. Global Partnerships and Teacher Development have partnered with National Assessments to ensure quality on the development of TARMII (Teacher Assessment Resources for Monitoring and Improving Instruction for foundation phase teachers) test items.

Expenditure as % of Appropriation DETAILS OF EARMARKED ALLOCATIONS/CONDITIONAL GRANT FOR THE 2016/17 FINANCIAL YEAR SERVICE Expenditure as % of Appropriation APPROPRIATION ACTUAL EXPENDITURE VARIANCE R’000 Earmarked Funds: 1 171 605 53 696 1 117 909 4.58% Workbooks 1 008 441 42 213 966 229 4.19% NEEDU 22 330 6 178 16 152 27.67% MST 5 271 846 4 425 16.05% NSNP 17 014 3 426 13 588 20.14% EPWP: Kha Ri Gude 68 549 - 0.00% Matric Second Chance 50 000 1 034 48 966 2.07% Conditional Grants: 16 212 997 5 687 238 10 525 759 35.08% Education Infrastructure Grant 9 613 692 3 605 135 6 008 557 37.50% HIV and Aids (Life Skills Educ) Grant 230 849 23 084 207 765 10.00% Maths, Science and Technology Grant 362 444 36 244 326 200 National School Nutrition Programme Grant 6 006 012 2 022 775 3 983 237 33.68%

DEVIATIONS AND REASONS Workbooks The printing of the 2017 volume 1 workbooks is currently in progress and the delivery is expected to commence during September 2016. The printing of the 2017 volume 1 workbooks is currently in progress and the delivery is expected to commence during September 2016. The expenditure will improve in the second and third quarter of the financial year when invoices have been received and paid. EPWP: Kha Ri Gude The Kha Ri Gude classes resume in October 2016. The application form for volunteers to meet the categories required by the EPWP electronic system has been amended. Although the EPWP allocation for the 2016/17 amounts to R68,5 million, the Department will not receive the full amount due to the low number of targeted volunteers. Matric Second Chance The pilot started in the 2016/17 financial year, offering direct tuition in 2 districts per province at 2 schools per district. Part of the allocation on this project is earmarked for the advocacy and advertise the programme in preparation for the 2017 supplementary examinations. The payments to teachers for phase 1 were processed, except for Mpumalanga and KwaZulu-Natal provinces, the delay in payment is due to non submission of the required documentation by the teachers. Conditional grants The transfers on conditional grants were made as schedule. The transfers on the conditional grants are based on the approved payment schedules communicated to provinces.

PERFORMANCE INFORMATION PER PROGRAMME TARGETS ACHIEVED AND PART B PERFORMANCE INFORMATION PER PROGRAMME TARGETS ACHIEVED AND NOT ACHIEVED

STATUS BAR FOR INDICATORS Programme No. of indicators per programme Annual Targets Q1 Not achieved Partially achieved Fully achieved One 3 1 2 Two 16 14 Three 8 Four 13 Five 4 Total distribution according to status 44 39 5 Percentage distribution 100% 87% 5% 9% 11% The status of all Annual Targets is White. Where 50% of the target has not been achieved, the status will be reflected as red. Where 50% or more of the target has been realised, supported by credible evidence, the status will be reflected as amber. Green will be reflected when the target has been fully achieved.

INDICATOR TABLE – PROGRAMME 1 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Percentage of Service providers within the procurement unit paid within 30 days. 100% Quarterly None Percentage of received misconduct cases resolved within 90 days 80% None . No cases received Percentage of received grievances cases resolved within 30 days 70% 66.67% 2cases resolved 3 cases received -3.33% Engaging in efficient HR and procurement

INDICATOR TABLE: PROGRAMME 2 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of off-line digital content packaged and distributed to provinces 10: Annually 10 - Number of schools per province monitored for utilisation of ICT resources 27: 13 On track Number of off-line digital content resources developed annually 4: None Percentage of public schools with Home Language workbooks for learners in Grades 1-6 100%

INDICATOR TABLE: PROGRAMME 2 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Percentage of public schools with Mathematics workbooks for learners in Grades 1-9 100%: Annually None reported None Percentage of public schools with workbooks for Grade R Number of underperforming schools monitored on the implementation of the Early Grade Reading Assessment (EGRA). 20: 5 Number of schools monitored on the implementation of the reading norms 20

INDICATOR TABLE: PROGRAMME 2 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of schools monitored on the implementation of the Incremental Introduction to African languages (IIAL) nationally 20: Annually None reported None Mathematics, Science and Technology lesson plans developed for the Senior and FET Phases Mathematics and Science teacher guides developed for the Senior and FET: Natural Science Gr 7 lessons plans developed. Mathematics, Science and Technology teacher guides developed for the Senior and FET Phases Mathematics and Science teacher guides developed for Senior and FET phase:

INDICATOR TABLE: PROGRAMME 2 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of learners obtaining a NSC through the Second Chance Programme 10 000 Annually 13790 210 Number of districts visited for monitoring the 1+4 strategy 9 : Bi Annually None reported None Number of training centres of CAPS for Technical subjects visited during a training session 14: 4 -3 Number of schools visited for monitoring CAPS implementation in technical schools 27: Number of learners enrolling for the Kha Ri Gude Literacy Campaign in 2016/17 561 722:

INDICATOR TABLE – PROGRAMME 3 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Percentage of SGBs that meet minimum criteria in terms of effectiveness (in sampled schools)   50% of sampled SGBs: Annual None reported None Percentage of schools producing the minimum set of management documents at a required standard 70% of sampled schools: Annually Number of Funza Lushaka bursaries awarded to students enrolled for initial teacher education. 14 000: Annually) 13790 210 Number of teachers participating in the EFAL diagnostic tests 10 000

INDICATOR TABLE – PROGRAMME 3 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of teachers participating in the Mathematics diagnostic tests 10 000: Annually None Number of schools per PEDs monitored on the implementation of IQMS monitor 18 schools in 6 PEDs: Quarterly 6 schools monitored in 2 PEDs (Northern Cape and Limpopo) Number of PEDs monitored on the implementation of PMDS 6 PEDS monitored 1 PED monitored (Kwazulu-Natal) -5 PMDS visits to Free State rescheduled at request of province Number of PEDs that had their post provisioning process assessed for compliance with the post provisioning Norms and Standards All Nine (9) PEDs: 2 PEDs trained in the implementation of the post provisioning norms -7

INDICATOR TABLE – PROGRAMME 4 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of ANA reports produced. 2: Annually None reported None A bank of Language and Mathematics test items for Grade 3,6 and 9 developed 100: Number of NSC and SC reports produced 5: Number of question papers set annually for NSC and SC 358: 258 (others still being processes) Percentage of public schools using the standardized school administration system, SA-SAMS for reporting   98% Quarterly Percentage of learners from public schools that are successfully uploaded on to LURITS 99% (Quarterly) (Still awaiting verification of numbers)

INDICATOR TABLE – PROGRAMME 4 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of new schools built and completed through ASIDI 59 (Annually) None reported None Number of schools provided with sanitation facilities through ASIDI 265   Number of schools provided with water 280 electricity through ASIDI 620 (Bi-annually) Number of officials from districts that achieved below the national benchmark in the NSC participating in a mentoring programme 30: Annually 36 6 Percentage of principals rating the support of district offices as satisfactory 63%: Percentage of district assessed against developed criteria. 75%:

INDICATOR TABLE - PROGRAMME 5 PERFORMANCE INDICATORS TARGET FOR 2016/17 AS PER APP ACTUAL OUTPUT AS AT END OF 1ST QUARTER OF 2016/17 DEVIATION FROM PLANNED TARGET FOR 2016/17 STATUS Number of schools monitored for the provision of nutritious meals 150:   Quarterly None Provincial activities did not facilitate monitoring visits in good time although these will be completed in Q2. Number of adjudicators, data capturers and Farm school conductors trained in SASCE programmes 900: Annually Number of learners participating in Social cohesion programmes. 6000: 480 -5520 Number of Hot Spot Schools monitored towards Implementation of the NSSF 46: 12 -34

SUMMARY AREAS OF UNDER-PERFORMANCE ON QUARTERLY TARGETS Indicator Reasons for Under-performance Remedial Action Time Frame Responsibility Number of PEDs monitored on the implementation of PMDS Monitoring the implementation of the PMDS did not take place in the Free State because the PED was not able to accommodate DBE due to their own operational activities. Monitoring in the Free State was rescheduled for the next quarter. Monitoring in the Free State was rescheduled for the next quarter. Completed in July 2016 Programme 3: Branch T Percentage of learners from public schools that are successfully uploaded on to LURITS Complete evidence not available Uploaded learners information to be checked using evidence checks To be completed in Q2 Programme 4: Branch P Number of schools monitored for the provision of nutritious meals Monitoring visits delayed due to myriad activities in provinces and inability to successfully carry out visits Monitoring Programme 5 : Branch S

SERVICE DELIVERY IMPLICATIONS FROM SLOW SPENDING: KHA RI GUDE CAMPAIGN PART C SERVICE DELIVERY IMPLICATIONS FROM SLOW SPENDING: KHA RI GUDE CAMPAIGN

REASONS FOR UNDERSPENDING –Q1 AFFECTED AREA IMPLICATIONS REMEDIAL MEASURES TIMEFRAMES The DBE has not yet signed the MoU from EPWP The KRG Budget allows for 14 500 Volunteers, however, EPWP, has allocated R68m for 40 000 job opportunities Funding for 2016/17 may not be accessed DBE will only be able to withdraw approximately R20m for the 14 500 Volunteers and thereby underspending once again Following –up with EPWP for funding National Treasury and EPWP have been alerted that the Campaign will underspend again in the 2016/17 Campaign DBE identify alternative  similar programs that could benefit from the grant September 2016 May 2016